The Awarded Projects Database logs projects awarded by the PSCOC over time. Standards-Based, Systems-Based, Pre-K Facilities, and Teacher Housing Projects are captured here. Please note that the wNMCI Score, Campus FCI, Total Cost, and State/Local Match categories reflect amounts at the time of award.

FY Project Type District School Project Description wNMCI Ranking wNMCI Score Campus FCI Total Cost State % Local % State Match Local Match
25 Standards Silver Cliff Combined School
Project Description
Planning and design phase funding for the replacement of the existing Cliff Combined School, for 167 students, grades PreK-12, and 50,000 gross square feet (pursuant to the Adequacy Planning Guide).
11 59.37% 71.11% $54,108,200 37% 63% $2,002,003 $3,408,817
25 Standards Bloomfield
  • Central Primary School
  • Naaba Ani Elementary School
  • Mesa Alta Junior High School
Project Description
Planning and design phase funding for the consolidation and replacement of Central Primary School, Naaba Ani Elementary School and Mesa Alta Junior High School, for 1,100 students, grades 1-8, and 120,587 gross square feet (pursuant to the Adequacy Planning Guide).
  • 37
  • 58
  • 71
  • 47.17%
  • 42.05%
  • 40.21%
  • 82.92%
  • 71.69%
  • 77.10%
$119,525,800 37% 63% $4,422,455 $7,530,125
25 Standards Rio Rancho Lincoln Middle School
Project Description
Planning funding to complete a classroom use analysis and preliminary program of spaces for renovation of existing spaces. Design and construction funding to complete the replacement of the roof, plumbing, and fire alarm systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility.
88 37.51% 57.99% $7,012,116 37% 63% $1,151,483 $1,960,633
25 Standards Rio Rancho Rio Rancho High School
Project Description
Planning funding to complete a comprehensive district-wide high school analysis to include demographics, enrollment projections, capacity/utilization, classroom inventory, attendance boundaries, impacts of new CTE Center, and potential recommendations. Design funding to complete the replacement of the roof, HVAC and fire alarm systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility.
99 36.59% 71.48% $44,721,382 37% 63% $1,121,891 $1,910,247
25 Systems Grants Grants High School
Project Description
Phase 1: Design funding to complete the replacement of the HVAC, lighting and stucco systems, including incidental systems directly related to the work in this award, for a total of 166,578 GSF: Main Gym, Art Classroom, Main Building 2nd Floor, and Main Building 1st Floor; all other buildings/additions are excluded. The allocation is intended to fully complete the projects, phase or specified purposes. Upon completion of this awarded phase of work, including conformance with all contingencies, out-of-cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
41 46% 59.46% $15,166,400 76% 24% $11,526,424 $3,639,639
25 Systems Alamogordo Alamogordo High School
Project Description
Phase 1: Design funding to complete the replacement of the roofing systems, including incidental systems directly related to the work in this award, for total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes. Upon completion of this awarded phase of work, including conformance with all contingencies, out-of-cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
122 34.87% 74.99% $14,313,200 51% 49% $7,299,732 $7,013,468
25 Systems Hatch Valley Hatch Valley Middle School
Project Description
Design and construction funding to complete the installation of the roof safety equipment, replacement of the exterior wall stucco, replacement of the exterior doors, and correction of the drainage, including incidental systems directly related to the work in this award, for the total GSF of the school. The allocation is intended to fully complete the projects, phase or specified purposes.
163 31.79% 63.05% $585,000 88% 12% $514,800 $70,200
25 Systems Eunice Eunice High School
Project Description
Construction funding to complete replacement of the plumbing system, including incidental systems directly related to the work in this award, for total of 52,047 NSF: Main Building, New Band Room, and Robotics/Computer Buildings only; all other buildings/additions are excluded. The allocation is intended to fully complete the projects, phase or specified purposes.
169 31.48% 63.97% $2,080,000 37% 63% $769,600 $1,310,400
25 Systems Logan Logan Combo
Project Description
Design and construction funding to complete replacement of the roofing system and correct drainage, including incidental systems directly related to the work in this award, for total 1,733 NSF: Pre-K Addition only. The allocation is intended to fully complete the projects, phase or specified purposes.
213 28.88% 61.29% $344,300 37% 63% $127,391 $216,909
25 Systems Silver Harrison H. Schmitt Elementary School
Project Description
Construction funding to complete replacement of the roofing, HVAC, exhaust, and fire alarm systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility. Conduct a district wide planning study to include capacity / utilization analysis for all town of Silver area schools, demographic analysis, and recommendations based on study findings for efficient use of school facilities. The allocation is intended to fully complete the projects, phase or specified purposes.
225 28.02% 63.43% $3,048,300 37% 63% $1,127,871 $1,920,429
25 Systems Silver La Plata Middle School
Project Description
Construction funding to complete the replacement of the fire alarm system, including incidental systems directly related to the work in this award, for the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes.
250 27.21% 62.58% $1,121,570 37% 63% $414,981 $706,589
25 Systems Clayton
  • Clayton Jr High School
  • Kiser Elementary School
Project Description
Construction funding to complete the replacement of the fire alarm system, including incidental systems directly related to the work in this award, for the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes.
253 27.16% 61.19% $432,400 37% 63% $159,988 $272,412
25 Systems Ruidoso Ruidoso High School
Project Description
Construction funding to complete replacement of the stucco, HVAC, lighting and plumbing systems, including incidental systems directly related to the work in this award,for the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes. Upon completion of this awarded phase of work, including conformance with all contingencies, out-of-cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
300 24.9% 65.54% $16,679,200 37% 63% $6,171,304 $10,507,896
25 Systems Cimarron Demoltion Of District Facilities
Project Description
Construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned Old Bus Barn. The allocation is intended to fully complete the projects, phase or specified purposes.
$150,000 100% 0% $150,000 $0
25 Systems Corona Demoltion Of District Facilities
Project Description
Construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned teacher housing unit. The allocation is intended to fully complete the projects, phase or specified purposes.
$104,000 100% 0% $104,000 $0
25 Systems Grants Demoltion Of District Facilities
Project Description
Construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned old District Office building and old Professional Learning Center. The allocation is intended to fully complete the projects, phase or specified purposes.
$826,140 100% 0% $826,140 $0
25 Systems Lovington Demoltion Of District Facilities
Project Description
Construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned facility. The allocation is intended to fully complete the projects, phase or specified purposes.
$192,240 100% 0% $192,240 $0
25 Systems Tucumcari Demoltion Of District Facilities
Project Description
Construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned old Mountain View Elementary School. The allocation is intended to fully complete the project, phase or specified purposes.
$1,043,950 100% 0% $1,043,950 $0
25 Pre-K Rio Rancho Shining Stars Preschool
Project Description
Planning study to determine district-wide options for pre-k facilities and potential transition to full-day program, to include examination of boundaries, enrollment projections, educational programs, a capacity / utilization analysis, and space needs. Design funding for kitchen/cafeteria addition at Shining Stars Preschool, for a total of 3,800 GSF.
$3,909,000 53% 47% $254,877 $226,023
25 Teacher Housing Corona
Project Description
Funding to complete 2 teacher housing duplexes (4 units), located on district property.
$744,000 53% 47% $394,320 $349,680
25 Teacher Housing Hatch Valley
Project Description
Funding to complete five teacher housing units, located on district property.
$715,000 88% 12% $629,200 $85,800
24 Standards Maxwell Maxwell Combined
Project Description
Planning and design phase funding for the replacement/consolidation of the existing facilities for 117 students, grades K‐12, and 45,000 gross square feet. Verification of the project's enrollment projection and gross square footage must be updated and approved by the PSCOC prior to the construction phase. Project to include 2 teacher housing units.
17 53.98% 72.98% $31,385,666 81% 19% $2,542,238 $596,328
24 Standards Central Tse Bit Ai Middle School
Project Description
Planning and design phase funding for the replacement of the existing MS facility for 302 students, grades 7‐8, and 44,266 gross square feet. Verification of the
project's enrollment projection and gross square footage (pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior to the construction phase. Project to include 12 teacher housing units. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle
funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
24 51.12% 70.07% $47,065,798 63% 37% $2,965,145 $1,741,435
24 Standards Springer Springer Combined
Project Description
Planning and design phase funding for the replacement/consolidation of the existing ES, MS/HS facilities for 109 students, grades K‐12, and 45,000 gross square feet
(pursuant to the Adequacy Planning Guide). Project's enrollment projection and gross square footage will be verified and updated by PSFA, if necessary. Project to include 5 teacher housing units. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
  • 14
  • 19
  • 55.32%
  • 53.10%
  • 79.99%
  • 82.04%
$33,705,503 68% 32% $2,291,974 $1,078,576
24 Standards Dexter Dexter Elementary / Middle School
Project Description
Planning and design phase funding for the consolidation and replacement of the existing ES and MS facility for 569 students, grades Pre‐K‐8, and 78,457 gross square feet (pursuant to the Adequacy Planning Guide). Verification of the project's enrollment projection and gross square footage by PSFA with updates if necessary. Project to include 12 teacher housing units. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle
funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
  • 81
  • 134
  • 39.19%
  • 33.67%
  • 63.50%
  • 57.29%
$54,392,878 81% 19% $4,405,823 $1,033,465
24 Standards Peñasco Peñasco Combined
Project Description
Planning and design phase funding for the replacement/consolidation of the existing ES/MS/HS facility for 290 students, grades Pre‐K ‐ 12, and 56,129 gross square
feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle
funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
  • 3
  • 32
  • 11
  • 74.13%
  • 49.06%
  • 58.42%
  • 67.53%
  • 57.21%
  • 71.35%
$50,071,099 71% 29% $3,555,048 $1,452,061
24 Standards Bernalillo Algodones Elementary School
Project Description
Planning and design phase funding for renovation /addition, or replacement based on programming and building systems analysis, for 358 students, grades Pre‐K‐6,
and 48,081 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle
funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
7 67.78% 79.78% $22,852,050 37% 63% $845,526 $1,439,679
24 Standards Artesia Roselawn Elementary School
Project Description
Planning and design phase funding for the replacement of the existing Roselawn ES facility for 354 students and 47,611 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
107 36.51% 65.22% $31,945,966 37% 63% $1,182,001 $2,012,596
24 Standards Hagerman Hagerman Combined
Project Description
Planning and design phase funding for the replacement/consolidation of the existing ES/MS/HS facilities for 375 students, grades Pre‐K‐12, and 69,732 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
100 37.17% 67.19% $49,962,770 75% 25% $3,747,208 $1,249,069
24 Standards Hondo Hondo Combined
Project Description
Planning and design phase funding for renovation /addition, or replacement based on programming and building systems analysis, for 358 students, grades Pre‐K‐6,
and 48,081 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle
funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. To include an early work package for new booster pump and refurbishment of the water treatment center. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
64 41.64% 64.07% $43,137,305 67% 33% $4,699,199 $2,314,531
24 Standards Albuquerque Harrison Middle School
Project Description
Design phase funding for the partial replacement of the existing MS facility for 500 students, grades 6‐8, and 71,120 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
95 37.7% 67.26% $53,507,936 37% 63% $989,897 $1,685,500
24 Standards Albuquerque Van Buren Middle School
Project Description
Design phase funding for the partial replacement of the existing MS facility for 650 students, grades 6‐8, and 86,304 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
135 33.51% 78.15% $64,647,761 37% 63% $1,195,984 $2,036,404
24 Systems Deming Columbus Elementary School
Project Description
Construction funding to complete replacement of the HVAC system, including incidental systems directly related to the work in this award, to the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes.
336 22.44% 37.62% $3,708,857 70% 30% $2,596,200 $1,112,657
24 Systems Deming Memorial Elementary School
Project Description
Construction funding to complete replacement of the roofing and HVAC systems, including incidental systems directly related to the work in this award, to the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes.
343 22.13% 47.72% $2,424,849 70% 30% $1,697,394 $727,455
24 Systems Gadsden Alamo Building, Barracks And Portable
Project Description
Construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned Alamo Building, PPD Barracks, and the Career Center Portable. The allocation is intended to fully complete the projects, phase or specified purposes.
$924,457 100% 0% $924,457 $0
24 Systems Texico Texico Combined
Project Description
Design and construction funding to complete replacement of the roofing system at the Education Complex, and repair the exterior walls at the Elementary School Building, to include incidental systems directly related to the work in this award. The allocation is intended to fully complete the projects, phase or specified purposes.
330 22.8% 58.01% $771,429 69% 31% $532,286 $239,143
24 Systems Albuquerque Atrisco Elementary School
Project Description
Design and construction funding to complete replacement of the roofing systems, including incidental systems directly related to the work in this award, for total of 9,274 NSF: Library/Media Center and Multipurpose Building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose. The allocation is intended to fully complete the project, phase or specified purpose.
434 17.6% 41.71% $643,064 37% 63% $237,934 $405,130
24 Systems Albuquerque Longfellow Elementary School
Project Description
Design and construction funding to complete replacement of the roofing and HVAC (boiler/piping) systems, including incidental systems directly related to the work in this award, for total of 44,347 NSF: Main Building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose.
47 45.9% 81.53% $4,874,615 37% 63% $1,803,608 $3,071,007
24 Systems Albuquerque Monte Vista Elementary School
Project Description
Design and construction funding to complete replacement of the HVAC system, including incidental systems directly related to the work in this award, for total of 21,649 NSF: Main School Building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose.
54 43.67% 83.7% $1,295,000 37% 63% $479,150 $815,850
24 Systems Albuquerque Osuna Elementary School
Project Description
Design and construction funding to complete replacement of the roofing systems, including incidental systems directly related to the work in this award, for total of 7,059 NSF: Library and Mini Gym buildings only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose.
384 20.23% 55.96% $505,651 37% 63% $187,091 $318,560
24 Systems Albuquerque S.Y. Jackson Elementary School
Project Description
Design and construction funding to complete replacement of the roofing systems, including incidental systems directly related to the work in this award, for total 50,993 GSF of the facility. The allocation is intended to fully complete the project, phase or specified purpose.
26 50.7% 77.54% $3,918,077 37% 63% $1,449,688 $2,468,389
24 Systems Albuquerque Eisenhower Elementary School
Project Description
Design and construction funding to complete replacement of the roofing systems, including incidental systems directly related to the work in this award, for total of 19,516 NSF: New Gym and Band Chorus Building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose.
78 39.39% 67.67% $1,931,951 37% 63% $714,822 $1,217,129
24 Systems Albuquerque Taft Middle School
Project Description
Design and construction funding to complete replacement of the roofing and HVAC systems, including incidental systems directly related to the work in this award, for total of 47,647 NSF: PE Building, New School and Classroom Addition buildings only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose.
21 52.86% 73.32% $3,868,595 37% 63% $1,431,380 $2,437,215
24 Systems Albuquerque Del Norte High School
Project Description
Design and construction funding to complete replacement of the roofing system, including incidental systems directly related to the work in this award, for total of 26,165 NSF: Performing Arts building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose.
494 14.28% 42.25% $946,107 37% 63% $350,060 $596,047
24 Systems Albuquerque Highland High School
Project Description
Design and construction funding to complete replacement of the roofing and HVAC (boiler) systems, including incidental systems directly related to the work in this award, for total of 115,764 NSF: Classroom Addition, Main Building, Math Building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose.
44 46.29% 74.97% $2,374,585 37% 63% $878,596 $1,495,989
24 Systems Albuquerque Sandia High School
Project Description
Design and construction funding to complete replacement of the roofing and HVAC systems, including incidental systems directly related to the work in this award, for total of 2,210 NSF: Music Addition only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose.
71 40.66% 70.53% $1,090,252 37% 63% $403,393 $686,859
24 Systems Albuquerque Valley High School
Project Description
Design and construction funding to complete replacement of the roofing and HVAC systems, including incidental systems directly related to the work in this award, for total of 18,177 NSF: Media Center building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose.
75 39.84% 74.3% $1,477,847 37% 63% $546,803 $931,044
24 Systems Clovis Marshall 6Th Grade Academy
Project Description
Phase 1: Design funding to complete replacement of the fire detection/alarm, communication, drain, waste, ventilation systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility. The allocation is intended to fully complete the project, phase or specified purpose.
256 22.8% 68.91% $5,532,480 63% 37% $348,546 $204,702
24 Systems Clovis Sandia Elementary School
Project Description
Phase 1: Design funding to complete replacement of the exterior windows, exterior doors, and drain, waste, ventilation systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility. The allocation is intended to fully complete the project, phase or specified purpose. The allocation is intended to fully complete the project, phase or specified purpose.
266 26.12% 71.06% $1,668,599 63% 37% $105,122 $61,738
24 Systems Los Alamos Los Alamos High School
Project Description
Design and construction funding to complete replacement of the HVAC systems, including incidental systems directly related to the work in this award, for total of 44,787 NSF: D Wing and F Wing only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purposes.
285 24.94% 61.46% $593,797 37% 63% $219,705 $374,092
24 Systems West Las Vegas Old Luis Armijo Building
Project Description
Construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned Old Luis Armijo Building. The allocation is intended to fully complete the project, phase or specified purposes.
$386,586 100% 0% $386,586 $0
24 Systems West Las Vegas Luis Armijo Elementary School
Project Description
Phase 1: Planning and Design funding to include a structural analysis, to determine potential scope of project: potential repairs of foundation / slab, replacement of the exterior windows, exterior doors, electrical system / LED lighting, and fire alarm, including incidental systems directly related to the work in this award, for the total GSF of the school facility. The allocation is intended to fully complete the project, phase or specified purpose.
268 25.89% 68.92% $2,896,343 76% 24% $220,122 $69,512
24 Systems Española Old Head Start Building
Project Description
Construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned Old Head Start Building. The allocation is intended to fully complete the project, phase or specified purposes.
$71,429 100% 0% $71,429 $0
24 Systems Cimarron Cimarron Elementary / Middle School
Project Description
Single phase: Design and construction funding to complete replacement of the fire alarm system, including incidental systems directly related to the work in this award, for the total GSF of the school facility (excluding the Original Building). The allocation is intended to fully complete the project, phase or specified purposes.
253 26.98% 60.74% $525,657 37% 63% $194,493 $331,164
24 Systems Melrose Melrose Combined
Project Description
Single phase: Planning, Design and Construction funding for fire alarm and waste and water infrastructure systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility (with the exclusion of the athletic locker rooms). The allocation is intended to fully complete the project, phase or specified purpose.
62 41.9% 76.51% $3,000,000 80% 20% $2,400,000 $600,000
24 Systems Clayton Demolition
Project Description
Single phase: construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection, relocation of the boiler system, demolition of facility, and final grading/drainage modifications at the abandoned Old Junior High Building. The allocation is intended to fully complete the project, phase or specified purposes.
$2,456,250 100% 0% $2,456,250 $0
24 Systems Albuquerque Demolition
Project Description
Single phase: construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/ drainage modifications at the abandoned Taft Middle School Administration Building. The allocation is intended to fully complete the project, phase or specified purposes.
$376,446 100% 0% $376,446 $0
24 Pre-K Cuba Cuba Elementary School
Project Description
Planning and design phase funding for a two classroom addition and to renovate the existing pre‐K classroom and restrooms at Cuba Elementary School (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
$1,912,214 54% 46% $103,260 $87,962
24 Pre-K Albuquerque Duranes Elementary School
Project Description
Design phase funding for the partial renovation and partial replacement of Duranes ES to create the Duranes Early Childhood Center, for 240 students and 50,879 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
$31,268,324 53% 47% $828,611 $734,806
24 Teacher Housing Central
Project Description
Design and construction funding to complete 4 teacher housing units, located at the existing teacher housing development near district office. The allocation is intended to fully complete the project, phase or specified purposes.
$2,200,000 63% 37% $1,386,000 $814,000
24 Teacher Housing Cuba
Project Description
Design and construction funding to complete 2 teacher housing units, located at the existing teacher housing development. The allocation is intended to fully complete the project, phase or specified purposes.
$928,350 54% 46% $501,309 $427,041
24 Teacher Housing House
Project Description
Design and construction funding to complete 3 teacher housing units, located on district property. The allocation is intended to fully complete the project, phase or specified purposes.
$531,960 81% 19% $430,888 $101,072
23 Standards Gallup Gallup Central High School
Project Description
Planning and design phase funding for the replacement of the existing facility, for 204 students, grades 6‐12,
and 20,553 gross square feet. Enrollment projections, programming for the specialized alternative educational
program, and gross square footage (pursuant to the Adequacy Planning Guide) must be updated in the
planning phase and approved by the PSCOC, prior to the completion of the planning and design phase. Each
allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this
awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of
work may be considered at any upcoming regularly scheduled PSCOC meeting.
1 1.22% 77.4% $10,981,468 82% 18% $900,480 $197,666
23 Standards State Charter Albuquerque Sign Language Academy
Project Description
Construction phase funding for the replacement of the existing facility, for 200 students, grades K‐12, and
47,000 gross square feet.
Release of construction funding contingent upon the finalization of the land lease, local share funding, and if
necessary, modification of the contract to reflect all necessary statutory requirements, pursuant to the
requirements of the PSCOC.
5 64.81% 46.62% $24,289,264 11% 89% $21,289,264 $3,000,000
23 Standards Gallup Thoreau High School
Project Description
Planning and design phase funding for the replacement of the existing facility, for 477 students, grades 9‐12,
and 84,350 gross square feet. Enrollment projections and gross square footage (not to exceed the maximum
gross square footage pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC
prior to the completion of the planning and design phase. Each allocation is intended to fully complete the
project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance
with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming
regularly scheduled PSCOC meeting.
27 45.57% 77.4% $46,603,375 82% 18% $3,821,477 $838,861
23 Standards Farmington Heights Middle School
Project Description
Planning and design phase funding for the replacement of the existing facility, for 680 students, grades 6‐8, and
89,001 gross square feet. Enrollment projections and gross square footage (not to exceed the maximum gross
square footage (pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior
to the completion of the planning and design phase. Each allocation is intended to fully complete the project,
phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all
contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly
scheduled PSCOC meeting.
65 39.86% 67.12% $46,280,520 37% 63% $1,712,379 $2,915,673
23 Standards Farmington Mesa Verde Elementary School
Project Description
Planning and design phase funding for the replacement of the existing facility, for 447 students, grades K‐5, and
58,159 gross square feet. Enrollment projections and gross square footage (not to exceed the maximum gross
square footage pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior
to the completion of the planning and design phase. Each allocation is intended to fully complete the project,
phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all
contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly
scheduled PSCOC meeting.
59 40.95% 74.46% $28,352,513 37% 63% $1,049,043 $1,786,208
23 Standards Gallup David Skeet Elementary School
Project Description
Planning and design phase funding for the replacement of the existing facility, for 224 students, grades K‐5, and
31,499 gross square feet. Enrollment projections and gross square footage (not to exceed the maximum gross
square footage pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior
to the completion of the planning and design phase. Each allocation is intended to fully complete the project,
phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all
contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly
scheduled PSCOC meeting.
93 37.24% 72.21% $21,603,198 82% 18% $1,771,462 $388,858
23 Standards Pojoaque Pojoaque Middle School
Project Description
Planning and design phase funding for the replacement of the existing facility (excluding the gym) for 396
students, grades 6‐8, and 53,725 gross square feet. Renovation to include the existing gymnasium and locker
rooms. Enrollment projections and gross square footage (not to exceed the maximum gross square footage
pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior to the
construction phase. Each allocation is intended to fully complete the project, phase or specified purpose. Upon
completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding
for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting.
6 61.16% 70.72% $32,943,671 65% 35% $2,090,939 $1,203,428
23 Standards Estancia Estancia Elementary School
Project Description
Planning and design phase funding for consolidation of the facility, for 301 students, grades Pre‐K‐6. Project to
include the renovation of the existing facility and a gymnasium addition with additional classrooms and spaces
as required. Enrollment projections and gross square footage must be updated and approved by the PSCOC
prior to the construction phase. Each allocation is intended to fully complete the project, phase or specified
purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐ofcycle
funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC
meeting.
63 36.9% 68.66% $14,812,486 49% 51% $662,256 $818,993
23 Systems Gallup Indian Hills Elementary School
Project Description
Design/construction funding to complete replacement /
upgrade of the Roof, Exterior Walls, Fire Alarm and Site
Drainage systems, including incidental systems directly related
to the work in this award, to the total 50,955 GSF of the school
facility.
336 22.9% 47.64% $4,238,824 82% 18% $3,475,836 $762,988
23 Systems Moriarty Moriarty High School East Complex Bldg.
Project Description
Construction funding to complete site survey, abatement of
hazardous materials (if needed), utility disconnection (if
needed), demolition of facilities, and final grading/drainage
modifications at the abandoned Moriarty HS East Complex
Building .
$642,857 60% 40% $385,714 $257,143
23 Systems Gadsden Santa Teresa Middle School
Project Description
Design/construction funding to complete replacement of the
Fire Alarm system, including incidental systems directly related
to the work in this award, to the total GSF of the school facility.
The allocation is intended to fully complete the projects, phase
or specified purposes.
18 47.83% 62.6% $553,523 64% 36% $354,255 $199,268
23 Systems Gadsden Loma Linda Elementary School
Project Description
Design/construction funding to complete replacement of the
Fire Alarm system, including incidental systems directly related
to the work in this award, to the total GSF of the school facility.
The allocation is intended to fully complete the projects, phase
or specified purposes.
61 40.52% 59.9% $202,616 64% 36% $129,674 $72,942
23 Systems Gadsden Sunland Park Elementary School
Project Description
Design/construction funding to complete replacement of the
Fire Alarm system, including incidental systems directly related
to the work in this award, to the total GSF of the school facility.
The allocation is intended to fully complete the projects, phase
or specified purposes.
295 25.01% 51.75% $303,891 64% 36% $194,490 $109,401
23 Pre-K Farmington Preschool Academy East
Project Description
Planning and design phase funding for the
replacement of the existing facility, for 720 students, Pre‐K, and 51,929 gross
square feet. Enrollment projections and gross square footage (pursuant to the
Adequacy Planning Guide) must be updated and approved by the PSCOC prior
to the completion of the planning and design phase. Each allocation is
intended to fully complete the project, phase or specified purpose. Upon
completion of this awarded phase of work, including conformance with all
contingencies, out‐of‐cycle funding for future phases of work may be
considered at any upcoming regularly scheduled PSCOC meeting.
$27,003,080 37% 63% $999,114 $1,701,194
23 Pre-K State Charter New Mexico School For The Blind And Visually Impaired
Project Description
Planning and design phase funding for
potential future projects, to include: bus loop and parking lot improvements,
kitchen and multipurpose addition, Pre‐K classroom addition, and potential
expansion for additional grade levels. Each allocation is intended to fully
complete the project, phase or specified purpose. Upon completion of this
awarded phase of work, including conformance with all contingencies, out‐ofcycle
funding for future phases of work may be considered at any upcoming
regularly scheduled PSCOC meeting.
$300,000 50% 50% $150,000 $150,000
22 Standards Gadsden Gadsden Middle School
Project Description
Planning phase funding to complete a feasibility study to determine options to renovate or replace the existing middle school buildings, with demolition of excess square footage, including a cost/benefit and building systems analysis, followed by a campus master plan and educational specification for grade levels 7th and 8th.
17 48.16% 56.44% $47,469,936 70% 30% $25,300 $49,700
22 Standards Gadsden Chaparral Middle School
Project Description
Planning phase funding to complete a feasibility study to determine options to renovate or replace the existing middle school buildings, with demolition of excess square footage, including a cost/benefit and building systems analysis, followed by a campus master plan and educational specification for grade levels 7th and 8th.
174 32.49% 70.65% $38,729,929 70% 30% $52,500 $22,500
22 Standards Los Alamos Chamisa Elementary School
Project Description
Design phase funding for the replacement of the existing facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design enrollment of 292 students, grades PreK-6.
78 38.67% 75.41% $20,459,743 20% 80% $409,195 $1,636,779
22 Standards Los Alamos Pinon Elementary School
Project Description
Design phase funding for the replacement of the existing facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design enrollment of 378 students, grades PreK-6th.
94 37.09% 67.5% $25,070,571 20% 80% $501,411 $2,005,646
22 Standards Los Lunas Ann Parish Elementary School
Project Description
Planning phase funding to complete a feasibility study to determine options to renovate or replace the existing elementary school buildings, including a cost/benefit and building systems analysis, followed by a campus master plan and educational specification for grade levels K-6.
87 37.58% 76.65% $30,845,000 56% 44% $42,000 $33,000
22 Standards Mosquero Mosquero Combined
Project Description
Design phase funding deferred, pending completion of planning phase work funded by the district, including a feasibility study with cost/benefit and building systems analysis to determine options to renovate or replace the 1935 original building.
39 43.07% 63.7% $20,570,514 6% 94% $54,923 $2,002,128
22 Systems Raton Longfellow Elementary School
Project Description
Planning and Design/Construction funding to complete district wide planning study to determine campus consolidation options and systems upgrades at the existing elementary school to the maximum gross square footage pursuant to the Adequacy Planning Guide for 26,211 gross square feet. Systems eligible for state funding are limited to: Fire Alarm and Boiler, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
6 59.34% 68.35% $360,179 45% 55% $162,081 $198,098
22 Systems House House Combined
Project Description
Design/Construction funding to complete abatement of lead/asbestos, demolition of 2,160 gross square feet of the 1952 building, and grading of site. Systems eligible for state funding are limited to: Demolition, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
89 37.51% 74.04% $142,858 52% 48% $74,286 $68,572
22 Systems Portales Portales High School
Project Description
Planning phase to include and Design/Construction funding to complete district wide planning study to determine campus consolidation options and systems upgrades at the existing elementary school to the maximum gross square footage pursuant to the Adequacy Planning Guide for 26,211 gross square feet. Systems eligible for state funding are limited to: Fire Alarm and Boiler, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
100 36.85% 71.83% $0 61% 39% $0 $0
22 Systems Floyd Floyd Combined School
Project Description
Design funding to complete evaluation of existing heating and cooling equipment and replacement of Rooftop units limited to 40,502 GSF. Systems eligible for state funding are limited to: Rooftop heating and cooling units, above educational spaces as identified in the district's application. Upon completion of the design phase, the district may return to the PSCOC for the next out-of-cycle funding phase to include an update to the total estimated project cost. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
143 33.74% 70.59% $67,002 86% 14% $57,622 $9,380
22 Systems Raton Raton High School
Project Description
Design/Construction funding to complete replacement of Fire Alarm, Boiler and Waterline limited to 66,179 GSF. Systems eligible for state funding are limited to: Fire Alarm, Boiler and Waterline as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
152 33.17% 68.77% $622,976 45% 55% $280,339 $342,637
22 Systems Truth or Consequences Sierra Elementary School
Project Description
Design funding to complete replacement of Roof, HVAC and Fire Alarm systems limited to 21,890 GSF. Systems eligible for state funding are limited to: Roof, HVAC, and Fire Alarm systems as identified in the district's application. Upon completion of the design phase, the district may return to the PSCOC for the next out-of-cycle funding phase to include an update to the total estimated project cost. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
199 30.66% 65.45% $178,083 15% 85% $26,712 $151,371
22 Systems Raton Raton Intermediate School
Project Description
Planning and Design/Construction funding to complete replacement of Fire Alarm, Boiler, and Plant controls systems limited to 30,194 GSF. Systems eligible for state funding are limited to: Fire Alarm, Boiler, and Plant controls, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
204 30.39% 65.77% $306,504 45% 55% $137,927 $168,577
22 Systems Portales James Elementary School
Project Description
Planning funding to complete a district-wide planning study and Design phase funding to complete an evaluation of the Roof structure, Site Drainage corrections and is limited to 45,291 GSF. Systems eligible for state funding are limited to: Site Drainage and Roof Replacement identified in the district's application. Upon completion of the design phase, the district may return to the PSCOC for the next out-of-cycle funding phase to include an update to the total estimated project cost. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
276 26.23% 73.44% $1,959,517 61% 39% $96,862 $61,928
22 Systems Tularosa Tularosa Intermediate School
Project Description
Design/Construction funding to complete replacement of Rooftop heating and cooling units limited to 39,133 GSF. Systems eligible for state funding are limited to: Rooftop heating and cooling units, above educational spaces as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
285 25.89% 57.88% $588,984 67% 33% $394,619 $194,365
22 Systems Raton Columbian Elementary School
Project Description
Design/Construction funding to complete site survey, abatement of lead/asbestos, demolition, and final grading/drainage modifications limited to 23,705 GSF of the 1940 building, and drainage/grading of adjacent site. Systems eligible for state funding are limited to: Demolition, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
$857,889 45% 55% $386,050 $471,839
22 Systems Las Vegas City Paul D. Henry Elementary School
Project Description
Design/Construction funding to complete site survey, abatement of lead/asbestos, demolition, and final grading/drainage modifications limited to 32,591 GSF of the 1954 building, and drainage/grading of adjacent site. Systems eligible for state funding are limited to: Demolition, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
$1,100,000 35% 65% $385,000 $715,000
22 Pre-K Deming My Little School
Project Description
Planning and design funding to renovate the
existing classrooms, restrooms and associated spaces, and to
construct a classroom and multipurpose room addition. District may
return for out‐of‐cycle construction funding.
Construction/renovation shall be pursuant to the Adequacy Planning
Guide (6.27.30 NMAC).
$4,384,357 61% 39% $267,446 $170,990
22 Pre-K Gadsden Chaparral On Track Center
Project Description
Planning and design funding to construct a 4 Pre‐K
classroom addition, including restrooms, at the existing Chaparral On
Track Center. District may return for out‐of‐cycle construction
funding. Construction shall be pursuant to the Adequacy Planning
Guide (6.27.30 NMAC).
$2,614,286 70% 30% $183,000 $78,429
22 Pre-K Gadsden New Riverside On Track Center
Project Description
Planning and design funding to construct an
addition to include: 8 Pre‐K classrooms, restrooms and associated
spaces, at the new Riverside On Track Center. District may return for
out‐of‐cycle construction funding. Construction shall be pursuant to
the Adequacy Planning Guide (6.27.30 NMAC).
$5,698,857 70% 30% $398,920 $170,966
22 Pre-K State Charter New Mexico School For The Deaf ‐ Albuquerque Preschool
Project Description
Planning and design funding to renovate portions of
the existing facility, and to construct an addition at the existing New
Mexico School for the Deaf ‐ Albuquerque Preschool campus. The
project shall start with a planning phase to evaluate needs and
potential project scope. District may return for out‐of‐cycle
construction funding. Construction shall be pursuant to the Adequacy
Planning Guide (6.27.30 NMAC).
$2,800,000 50% 50% $140,000 $140,000
22 Pre-K State Charter School Of Dreams Academy
Project Description
Planning and design funding to construct an
addition to include: 5 Pre‐K classrooms, restrooms and associated
spaces, at the School of Dreams Academy (state chartered charter
school). District may return for out‐of‐cycle construction funding.
Construction shall be pursuant to the Adequacy Planning Guide
(6.27.30 NMAC).
$4,528,571 56% 44% $84,100 $368,757
21 Standards Carrizozo Carrizozo Combined School
Project Description
Planning phase funding to complete a feasibility study to determine options to renovate or replace the existing school buildings on the combined campus, with demolition of excess square footage, including a building systems analysis, followed by a campus master plan and educational specification for the new grades Pre-K-12 campus. Upon completion, the district may return to the PSCOC for the next out-of-cycle funding phase to include approval of the design enrollment, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total estimated project cost. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project.
$20,210,393 0% 100% $0 $75,000
21 Standards Gallup Crownpoint High School
Project Description
Planning phase funding to complete a comprehensive campus master plan and educational specification to include Crownpoint middle and high schools, to maximize utilization of the school facilities, including sharing of spaces. The campus master plan will define the final configuration of the grades 6-12 campus, including construction phases and site elements. Upon completion, the district may return to the PSCOC for the next out-of-cycle funding phase to include approval of the design enrollment, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total estimated project cost. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project.
$33,712,963 81% 19% $60,750 $14,250
21 Standards Gallup Gallup High School
Project Description
Planning phase funding to complete a structural investigation and feasibility study to determine options to renovate or replace the existing high school buildings, with demolition of excess square footage, including a cost/benefit analysis to stabilize the buildings and a building systems analysis, followed by a campus master plan and educational specification for the school, grades 9-12. Campus master plan will define the phasing strategy for the design and construction phases, including a sequencing plan to move students as the work progresses and an outline scope of work for each design and construction phase. Upon completion, the district may return to the PSCOC for the next out-of-cycle funding phase to include approval of the design enrollment, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total project cost estimate. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project.
$71,780,729 81% 19% $101,250 $23,750
21 Standards Gallup Navajo Pine High School
Project Description
Planning phase funding to complete a comprehensive campus master plan and educational specification to include Navajo middle and high schools, to maximize utilization of the school facilities, including sharing of spaces. The campus master plan will define the final configuration of the grades 6-12 campus, including construction phases and site elements. Upon completion, the district may return to the PSCOC for the next out-of-cycle funding phase to include approval of the design enrollment, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total estimated project cost. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project.
$22,631,511 81% 19% $60,750 $14,250
21 Standards Grants Mesa View Elementary School
Project Description
Planning and design phase funding for the replacement of the existing facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design enrollment of 474 students, grades Pre-K-6. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project
$24,270,571 74% 26% $1,796,022 $631,035
21 Standards Hobbs Heizer Middle School
Project Description
Planning funding to complete Phase I planning to include district-wide enrollment and boundary study, updated 5-year middle school enrollment projections and student location/geocode analysis. Based on the results of this initial Phase I planning work, the district may return to PSCOC for approval of the project scope for a new middle school campus and/or renovations to Heizer MS. Phase II planning work for a new middle school will include educational specifications. Upon completion of the planning phase, the district may return to the PSCOC for the next out-of-cycle design funding phase to include approval of enrollment for the new middle school, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total project cost estimate. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project.
$52,867,500 0% 100% $0 $75,000
21 Standards Zuni
  • Twin Buttes High School,
  • Zuni High School
Project Description
Planning phase funding to complete a feasibility study to determine options to renovate or replace the existing high school buildings, with demolition of excess square footage, including a cost/benefit and building systems analysis, followed by a campus master plan and educational specification for the new grades 6-12 campus on the high school site, including new teacher housing units. Campus master plan will define the phasing strategy for the design and construction phases, including a sequencing plan to move students as the work progresses and an outline scope of work for each design and construction phase. Upon completion, the district may return to the PSCOC for the next out-of-cycle funding phase to include approval of the design enrollment, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total estimated project cost. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project.
$51,974,571 100% 0% $75,000 $0
21 Systems Las Cruces Tombaugh Elementary School
Project Description
Design phase funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 73,929 gross square feet. Systems eligible for state funding are limited to: Roof and HVAC, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. Upon completion of the design phase, the district may return to the PSCOC for the next out-of_x0002_cycle funding phase to include an update to the total estimated project cos
$3,310,965 50% 50% $165,548 $165,548
21 Systems Clovis Clovis High School
Project Description
Design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 15,455 gross square feet (partial campus). Systems eligible for state funding are limited to: Roof and HVAC, as identified in the district's application. Prior to receiving an award, the district shall submit a written commitment to replace the remainder of the roofing adjacent to this work area at its own cost. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
$1,404,966 69% 31% $967,357 $434,609
21 Systems Las Cruces Onate High School
Project Description
Design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 33,400 gross square feet (partial campus). Systems eligible for state funding are limited to: HVAC, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. Upon completion of the design phase, the district may return to the PSCOC for the next out-of-cycle funding phase to include an update to the total estimated project cost.
$2,797,237 50% 50% $139,862 $139,862
21 Systems Gallup Tohatchi Middle School
Project Description
Design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 34,839 gross square feet (partial campus). Systems eligible for state funding are limited to: Roof, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
$995,400 78.11% 21.89% $777,474 $217,926
21 Systems Hatch Valley
  • Hatch Valley
  • Middle School
Project Description
Design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 10,061 gross square feet. Systems eligible for state funding are limited to: Roof and HVAC, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district.
$259,290 85% 15% $220,397 $38,894
21 Pre-K Hatch Valley Garfield Elementary School
Project Description
Design and construction funding to renovate 5 existing Pre-K classrooms and the existing restrooms. Construction/renovation shall be pursuant to the Adequacy Planning Guide (6.27.30 NMAC).
$474,765 85% 15% $403,550 $71,215
21 Pre-K Los Lunas Peralta Elementary School
Project Description
Planning, design, and construction phase funding to construct 8 Pre-K classrooms at the new Peralta Elementary School campus to create an east-side Pre-K center in the district. Construction shall be pursuant to the Adequacy Planning Guide (6.27.30 NMAC).
$3,565,714 63% 37% $2,246,400 $1,319,314
21 Pre-K Los Lunas Raymond Gabaldon Elementary School
Project Description
Planning, design, and construction phase funding to renovate 8 Pre-K classrooms at Gabaldon Elementary School to create a west_x0002_side Pre-K center in the district. The planning phase shall include a district-wide boundary study and updated enrollment projections. The design phase shall include a campus master plan to define how the renovated Pre-K center will be integrated into the long-term configuration of the campus at Gabaldon Elementary School. Construction shall be pursuant to the Adequacy Planning Guide (6.27.30 NMAC).
$4,453,429 63% 37% $2,805,660 $1,647,769
20 Standards Alamogordo Chaparral Middle School
Project Description
Planning and design, beginning with an educational specification, for a replacement facility to
the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design
capacity for 658 students, grades 6-8.
1 78.51% 68.35% $36,045,921 60% 40% $2,162,755 $1,441,837
20 Standards Central Newcomb Elementary School
Project Description
Funding to complete comprehensive campus master plan and educational specification to
include the Newcomb ES, Newcomb MS, and Newcomb HS, to maximize utilization of school
facilities. Upon completion, district may return to the PSCOC for the next out-of-cycle funding
phase to include approval of location of the new ES facility, design capacity, maximum gross
square footage pursuant to the Adequacy Planning Guide, and an update to the total project
cost estimate.
2 69.3% 69.84% $24,380,179 60% 40% $45,000 $30,000
20 Standards Roswell Mountain View Middle School
Project Description
Planning and design, beginning with an educational specification, for renovation/replacement of the existing facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design capacity for 525 students, grades 6-8.
3 63.15% 78.35% $26,582,892 68% 32% $1,807,637 $850,653
20 Standards Hobbs Southern Heights Elementary School
Project Description
Planning and design for replacement of the existing facility to the maximum gross square
footage pursuant to the Adequacy Planning Guide, for a design capacity for 500 students, grades
3&4-Year-Old DD-5.
5 54.76% 65.39% $29,901,457 52% 48% $1,554,876 $1,435,270
20 Standards Las Cruces Columbia Elementary School
Project Description
Funding to complete district-wide educational specifications to include updated enrollment
projections. Upon completion, district may return to the PSCOC for review of the educational
specifications and consideration for a next out-of-cycle funding phase to complete a
feasibility/engineering study of the existing building. Design capacity and options to renovate or
replace the existing building are deferred pending the outcome of the planning phase(s) of this
project.
7 53.54% 45.49% $30,697,527 57% 43% $42,750 $32,250
20 Standards Roswell Washington Avenue Elementary School
Project Description
Funding to complete educational specification/ feasibility study to determine options to
maximize utilization of the current school facility and to ensure that the project will
accommodate the educational program of the projected enrollment of 430 students, grades K-5.
Upon completion, district may return to the PSCOC for the next out-of-cycle funding phase to
include approval of options, design capacity, maximum gross square footage pursuant to the
Adequacy Planning Guide, and an update to the total project cost estimate.
12 51.58% 72.68% $9,596,836 68% 32% $51,000 $24,000
20 Standards Des Moines Des Moines Combined School
Project Description
Award consideration is deferred pending the outcome of the structural study and planning work currently underway. Upon completion, district may return to the PSCOC for next out-of-cycle funding phase to include approval of options, design capacity, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total project cost estimate.
46 42.98% 57.24% $10,331,490 14% 86% $0 $0
20 Standards Grants Bluewater Elementary School
Project Description
Planning and design for renovation/replacement of the existing facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design capacity of 95 students, grades K-6.
52 41.96% 82.78% $7,306,951 75% 25% $548,021 $182,674
20 Standards Clovis Barry Elementary School
Project Description
Planning and design for the project, construction funding to complete roofing and HVAC replacement of $1.8 million, and construction funding to complete the classroom addition for a design capacity of 400 students, grades K-5. The district may return to the PSCOC for out-of_x0002_cycle funding for the balance of the award for construction of the interior renovations and site work.
72 39.64% 73.28% $883,586 68% 32% $2,797,084 $1,316,275
20 Systems Roswell Roswell High School
Project Description
Planning, design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 165,917 square feet (partial campus). Systems are limited to: Fire Detection/Alarm, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount.
6 53.65% 70.96% $345,000 68% 32% $234,600 $110,400
20 Systems Gallup Gallup High School
Project Description
Planning, design and construction funding to complete systems upgrades at the existing site pursuant to the Adequacy Planning Guide. Systems are limited to: Parking Lots and Walkways, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The District must provide quarterly updates to the PSCOC on its maintenance status until an updated FMAR score to a minimum of 65% at this school is achieved. The District's request for local match reduction is deferred pending a final statement of financial position.
29 46.29% 57.96% $4,425,055 80% 20% $3,540,044 $885,011
20 Systems Clovis Clovis High School
Project Description
Planning and design funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 177,692 square feet (partial campus). Systems are limited to: Exterior Windows, Exterior Doors, and Fire Detection/Alarm, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. Upon completion, district may return to the PSCOC for the next out-of-cycle funding phase.
102 37.11% 73.44% $803,504 68% 32% $54,638 $25,712
20 Systems Gallup Crownpoint Middle School
Project Description
Planning, design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 32,234 square feet (partial campus). Systems are limited to: Roof, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The District must provide quarterly updates to the PSCOC on its maintenance status until an updated FMAR score to a minimum of 65% at this school is achieved. The District's request for local match reduction is deferred pending a final statement of financial position.
124 35.46% 61.63% $1,775,200 80% 20% $1,420,160 $355,040
20 Systems San Jon San Jon Combined School
Project Description
Planning and design funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 35,317 square feet (partial campus). Systems are limited to: Fencing, Parking Lots, Playground Equipment, Site Drainage, Walkways, Roof, Ceiling Finishes, Floor Finishes, Heat Generating Systems, and Fire Detection/Alarm, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. Upon completion, district may return to the PSCOC for the next out-of-cycle funding phase.
210 29.72% 61.14% $2,394,286 69% 31% $165,206 $74,223
20 Systems Gallup Tse Yi Gai High School
Project Description
Planning, design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 28,913 square feet (partial campus). Systems are limited to: Roof, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The District must provide quarterly updates to the PSCOC on its maintenance status until an updated FMAR score to a minimum of 65% at this school is achieved. The District's request for local match reduction is deferred pending a final statement of financial position.
213 29.54% 45.16% $526,671 80% 20% $421,336 $105,334
20 Systems Hobbs Hobbs High School
Project Description
Planning and design funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 20,570 square feet (partial campus). Systems are limited to: Heat Generating Systems, Cooling Generating Systems, Air Distribution Systems, Exhaust Ventilation System, and HVAC Controls, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. Upon completion, district may return to the PSCOC for the next out-of-cycle funding phase.
215 29.48% 53.21% $571,692 52% 48% $29,728 $27,441
20 Systems Portales Brown Early Childhood Center
Project Description
Planning and design funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 19,079 square feet (partial campus). Systems are limited to: Parking Lots, Playground Equipment, Site Lighting, Site Drainage, Site Utilities, Site Domestic Water Utility, Landscaping, Walkways, Exterior Walls, Exterior Windows, Exterior Doors, Ceiling Finishes, Floor Finishes, Wall Finishes, Foundation/Slab/Structure, Interior Doors, Interior Walls (and Partitions), Air Distribution Systems, Exhaust Ventilation System, Rooftop Unitary AC, HVAC Controls, Fire Sprinkler, Main Power/Emergency, Lighting/Branch Circuits, Plumbing Fixtures, Water Distribution, Drain, Waste, and Vent, Fire Detection/Alarm, Demolition of Portion of Occupied Building, and Security Systems (Excludes security cameras, handheld radios, automatic vehicle gates), as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. Upon completion, district may return to the PSCOC for the next out-of-cycle funding phase.
239 28.19% 61.12% $4,344,223 69% 31% $299,751 $134,671
20 Systems Las Cruces Valley View Elementary School
Project Description
Planning, design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 52,248 square feet (partial campus). Systems are limited to: Roof, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount.
246 27.84% 53.34% $1,340,365 57% 43% $764,008 $576,357
20 Systems Hobbs Mills Elementary School
Project Description
Planning, design and construction funding to complete systems upgrades at the existing site pursuant to the Adequacy Planning Guide. Systems are limited to: Fencing, Parking Lots, Site Drainage, Landscaping, and Walkways, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount.
266 26.7% 67.48% $642,857 52% 48% $334,286 $308,571
19 Standards Roswell Mesa Middle School
Project Description
Planning and design for renovation and addition to the existing facilties to the GSF pursuant to the Adequacy Planning Guide for 513 students, grades 6-8
3 71.85% 81.49% $16,322,078 71% 29% $1,158,868 $473,340
19 Standards Gallup Rocky View Elementary School / Red Rock Elementary School
Project Description
Funding to complete feasibility study to determine option to maximize utilization of current school facilities including closure of Rocky View ES. Upon completion, district may return to the PSCOC for next out-of-cycle funding phase, approval of options and total student capacity limited to the GSF pursuant to the Adequacy Planning Guide and update to the total project cost estimate.
  • 5
  • 27
  • 69.42%
  • 49.31%
  • 64.47%
  • 69.17%
$30,842,957 80% 20% $30,000 $15,000
19 Standards Belen Jaramillo Elementary School
Project Description
Funding to complete educational specifications to determine options to maximize utilization of current school facilities to the GSF pursuant to the Adequacy Planning Guide for 350 students, 3&4 year-old DD Pre-K-3rd grade. Upon completion, district may return to the PSCOC for next out-of-cycle funding phase, approval of options, and update to the total project cost estimate.
6 67.65% 65.99% $17,136,996 57% 43% $42,750 $32,250
19 Standards Alamogordo Holloman Elementary School
Project Description
Planning and design for a replacement facility to the GSF pursuant to the Adequacy Planning Guide with a core capacity of 600 and initial classrooms for 500 students, grades K-5. Award includes demolition of existing Holloman ES. Demolition of Holloman IS is not included at this time. The play field/track on this site is excluded from the scope of this award. Any federal funding to support this or future phases will be primary sources to complete the work; non_x0002_funded balances for the scope of work may be considered at a future PSCOC meeting for award at the state/local match percentages.
7 64.45% 74.69% $34,207,757 62% 38% $2,120,881 $1,299,895
19 Standards Los Alamos Barranca Mesa Elementary School
Project Description
Planning, design, and construction for renovation/replacement of the existing facilties to the GSF pursuant to the Adequacy Planning Guide for 450 students, 3&4-year-old DD Pre-K-6th grade.
11 55.13% 73.96% $18,798,134 47% 53% $8,835,123 $9,963,011
19 Standards Gallup Tohatchi High School
Project Description
Funding to complete feasibility/utilization study to determine options to maximize utilization of the current school facilities. Upon completion, district may return to the PSCOC for next out-of_x0002_cycle funding phase, approval of options and total student capacity to the GSF pursuant to the Adequacy Planning Guide, and update to the total project cost estimate.
28 49.27% 71.49% $31,424,650 80% 20% $60,000 $15,000
19 Standards Las Vegas City Sierra Vista Elementary School
Project Description
Planning, and design, for renovation of the existing facilties to the GSF pursuant to the Adequacy Planning Guide for 330 students, 3&4-year-old DD Pre-K-6th grade.
36 46.85% 61.8% $8,441,479 53% 47% $447,398 $396,750
19 Standards Los Lunas Peralta Elementary School
Project Description
Funding to complete educational specifications and a campus feasibility/utilization study, to determine options to renovate and/or replace the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 369 students, 3&4-year-old DD Pre-K-6th grade. Award includes funding for minor upgrades to the existing portable campus to house students from Peralta ES during construction. Offset carryforward of $12,000 will apply to future awards or award phases.
38 46.18% 62.29% $17,856,749 76% 24% $57,000 $18,000
19 Standards Roswell Nancy Lopez Elementary School
Project Description
Funding to complete educational specifications to include updated enrollment projections and definition of educational program. Upon completion, district may return to the PSCOC for next out-of-cycle funding phase, approval of options for renovations/replacements/additions and total student capacity to the GSF pursuant to the Adequacy Planning Guide, and update to the total project cost estimate.
39 45.78% 74.29% $10,133,138 71% 29% $53,250 $21,750
19 Standards Las Cruces Desert Hills Elementary School
Project Description
Planning and design for renovations and additions to the existing facility to the GSF pursuant to the Adequacy Planning Guide for 648 students, grades K-5. The award includes removal of the portables on site which will be replaced with permanent facilities as part of this project.
51 43.36% 51.51% $5,725,000 64% 36% $366,400 $206,100
19 Standards Zuni Zuni Middle School
Project Description
Funding to complete feasibility/structural study to determine options to maximize utilization of the current school facilities. Upon completion, district may return to the PSCOC for next out-of_x0002_cycle funding phase, approval of options and total student capacity to the GSF pursuant to the Adequacy Planning Guide, and update to the total project cost estimate.
67 41.99% 69.19% $19,793,143 100% 0% $75,000 $0
19 Systems Magdalena Magdalena Combined School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 20,228 square feet (partial campus). Systems are limited to: HVAC, Roof, and Air/Ventilation, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount
167 33.87% 77.34% $608,967 75% 25% $456,725 $152,242
19 Systems Las Cruces Fairacres Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing site to the GSF pursuant to the Adequacy Planning Guide. Systems are limited to Parking Lots and Site Drainage as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount
194 32.13% 77.23% $491,429 64% 36% $314,515 $176,914
19 Systems Tularosa Tularosa Middle School
Project Description
Funding to complete district-wide feasibility/utilization study to determine options to maximize utilization of the current school facilities. Upon completion, district may return to the PSCOC for out-of-cycle funding, including approval of options under the systems-based program, or potential conversion to a standards-based grant and update to the total project cost estimate
23 50.44% 74.75% $75,000 71% 29% $53,250 $21,750
19 Systems Alamogordo Buena Vista Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 36,100 square feet (whole campus). Systems are limited to: Walkways, Exterior Walls, Exterior Windows & Doors, and Interior Doors, Partitions, Stairs, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount.
102 38.51% 73.93% $1,071,429 62% 38% $664,286 $407,143
19 Systems Alamogordo Sacramento Elementary School
Project Description
Retroactive funding to complete demolition of the existing 50,081 square foot facility under the previously awarded project P11-002 Desert Star ES, which provided a new elementary school to relieve overcrowding at Yucca ES and to combine it with Sacramento ES. Portables may remain on site as non-educational space to support district needs
72.82% $1,000,000 70% 30% $700,000 $300,000
19 Systems Las Cruces Lynn Middle School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 67,121 square feet (partial campus). Systems are limited to: Floor Finishes, Interior Doors, Partitions, Stairs, HVAC, and Lighting/Branch Circuits, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount
118 37.32% 71.65% $4,248,260 64% 36% $2,718,886 $1,529,374
19 Systems Las Cruces Rio Grande Preparatory Institute
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilitiesto the GSF pursuant to the Adequacy Planning Guide for 42,940 square feet (whole campus). Systems are limited to Roof, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount
134 36.16% 68.55% $1,085,986 64% 36% $695,031 $390,955
19 Systems Las Cruces Mesilla Valley Leadership Academy
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 12,943 square feet (partial campus). Systems are limited to Roof, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount
115 37.46% 67.17% $390,000 64% 36% $249,600 $140,400
19 Systems Carrizozo Carrizozo Combined School
Project Description
Funding to complete district-wide feasibility/utilization study to determine options to maximize utilization of the current school facilities. Upon completion, district may return to the PSCOC for out-of-cycle funding, including approval of options under the systems-based program, or potential conversion to a standards-based grant and update to the total project cost estimate
10 56.42% 66.14% $75,000 10% 90% $7,500 $67,500
19 Systems Cloudcroft Cloudcroft Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 13,700 square feet (partial campus). Systems are limited to: Roof, Ceiling Finishes, and Lighting/Branch Circuits, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The district is encouraged to consider strategies to right-size their facilities.
299 27.37% 63.82% $429,282 10% 90% $42,928 $386,354
19 Systems Belen Dennis Chavez Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 45,594 square feet (partial campus). Systems are limited to: Parking Lots, Site Lighting, Drainage, Exterior Windows & Doors, Roof, Floor Finishes, HVAC, Main Power/Emergency, Lighting/Branch Circuits, Plumbing, Fire Alarm System, and Security Systems (Communication), as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount
168 33.84% 59.69% $2,557,091 57% 43% $1,457,542 $1,099,549
19 Systems West Las Vegas Tony Serna Jr. Elementary School
Project Description
Funding to complete district-wide feasibility/utilization study to determine options to maximize utilization of the current school facilities prior to design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 19,517 square feet (partial campus). Systems are limited to: Site Lighting, Site Utilities, Exterior Walls, Exterior Windows and Doors, Roof, Ceiling Finishes, Interior Doors, Partitions and Stairs, Interior Walls, HVAC, Lighting/Branch Circuits and Fire Alarm Systems, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount
121 37.21% 58.94% $1,084,873 67% 33% $726,865 $358,008
19 Systems Bernalillo Bernalillo Middle School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 69,139 square feet (partial campus). Systems are limited to: Parking Lots, Roof, Plumbing, Fire Alarm System, and Exterior Walls, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The district is encouraged to consider strategies to right-size their facilities
291 27.66% 53.36% $4,004,139 41% 59% $1,641,697 $2,362,442
19 Systems Deming Chaparral Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 48,347 square feet (partial campus). Systems are limited to HVAC and Ceiling Finishes, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount
298 27.5% 53.25% $2,334,728 69% 31% $1,610,962 $723,766
19 Systems Socorro Sarracino Middle School
Project Description
Funding to complete district-wide feasibility/utilization study to determine options to maximize utilization of the current school facilities. Upon completion, district may return to the PSCOC for out-of-cycle funding, including approval of options under the systems-based program, or potential conversion to a standards-based grant and update to the total project cost estimate.
82 40.48% 47.21% $75,000 72% 28% $54,000 $21,000
19 Systems Floyd Floyd Combined School
Project Description
Planning, design and construction funding to complete system upgrades at the existing site to the GSF pursuant to the Adequacy Planning Guide. Systems are limited to Parking Lots as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The district is encouraged to consider strategies to right-size their facilities.
34.41% 46.03% $576,443 76% 24% $438,097 $138,346
19 Systems Los Lunas Los Lunas Middle School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 79,758 square feet (partial campus). Systems are limited to: Parking Lots, Playground Equipment, Site Lighting, Site Drainage, Walkways, Roof, Ceiling Finishes, Floor Finishes, Interior Walls, HVAC, Main Power/Emergency, Lighting/Branch Circuits, Plumbing, Fire Sprinkler, Demolition, and Security Systems (Access Control), as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The district shall pursue legal remedy on roof warranty(ies). Any costs recovered in association with this work shall be split at the state/local match of this award, and shared proportionately between the district and the PSCOC
79 40.77% 45.5% $4,115,790 76% 24% $3,128,000 $987,790
19 Systems Las Cruces Highland Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the defined participation limits of the funding program for 83,833 square feet (whole campus). Systems are limited to: Interior Doors, Partitions, Stairs, and Lighting/Branch Circuits, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount
272 28.28% 67.41% $359,171 64% 36% $229,869 $129,302
19 Systems Las Cruces Picacho Middle School
Project Description
Planning, design and construction funding to complete system upgrades at the existing site to the defined participation limits of the funding program. Systems are limited to Fencing as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount.
223 30.49% 65.77% $220,684 64% 36% $141,238 $79,446
19 Systems Las Cruces Oñate High School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the defined participation limits of the funding program for 177,871 square feet (partial campus). Systems are limited to: Lighting/Branch Circuits, and Security Systems (Intercom), as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The district is encouraged to consider strategies to right-size their facilities
184 32.78% 61.78% $514,293 64% 36% $329,147 $185,145
19 Systems Las Cruces Vista Middle School
Project Description
Planning, design and construction funding to complete system upgrades at the existing site to the defined participation limits of the funding program. Systems are limited to Fencing as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount.
173 33.51% 60.72% $91,886 64% 36% $58,807 $33,079
19 Systems Las Cruces Hillrise Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to the defined participation limits of the funding program for 399 square feet (partial campus). Systems are limited to Interior Doors, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount.
295 27.54% 58.2% $61,109 64% 36% $39,110 $21,999
19 Systems Las Cruces Mayfield High School
Project Description
Planning, design and construction funding to complete system upgrades at the existing site to the defined participation limits of the funding program. Systems are limited to: Fencing, Site Lighting, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount.
237 29.94% 43.33% $383,387 64% 36% $245,368 $138,019
18 Systems Central Kirtland Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to adequacy for 664 students, grades K-6. Systems are limited to: roof, ceiling finishes, foundation/slab/structure, air/ventilation, HVAC, main power/emergency, lighting/branch circuits, and fire sprinkler as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount.
36 34.46% 59.73% $3,453,673 64% 36% $2,210,351 $1,243,322
18 Systems Gadsden Desert Trail Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to adequacy for 548 students, grades PreK-6. Systems are limited to: roof, ceiling finishes, floor finishes, air/ventilation, HVAC, and main power/emergency as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount.
87 28.75% 40.39% $5,860,057 85% 15% $4,981,048 $879,009
18 Systems Las Vegas City Los Ninos Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to adequacy for 392 students, grades K-3. Systems are limited to: parking lots, site lighting, grading/drainage, walkways, exterior walls, exterior windows & doors, roof, ceiling finishes, floor finishes, HVAC, main power/emergency, lighting/branch circuits, plumbing, and fire sprinkler as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount
33 35.04% 39.1% $5,051,855 55% 45% $2,778,520 $2,273,335
18 Systems Clovis Cameo Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: parking lots, site lighting, walkways, site specialties/landscaping (drainage), exterior windows and doors, ceiling finishes, and floor finishes, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount
94 27.06% 46.12% $1,670,375 74% 26% $1,236,078 $434,298
18 Systems Clovis Mesa Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: parking lots, ceiling finishes, floor finishes, air/ventilation, and HVAC, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount
79 28.17% 55.56% $2,173,500 74% 26% $1,608,390 $535,110
18 Systems Dexter Dexter Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: air/ventilation, HVAC, and main power/emergency, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount
66 29.63% 43.72% $977,421 78% 22% $762,388 $215,033
18 Systems Farmington Country Club Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: site utilities, exterior windows & doors, roof, ceiling finishes, floor finishes, foundation/slab/structure, air/ventilation, HVAC, main power/emergency, lighting/branch circuits, plumbing, and fire sprinkler, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount
132 24.95% 50.09% $4,890,521 64% 36% $3,129,933 $1,760,587
18 Systems Floyd Combined School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: main power/emergency, portables, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount
124 25.42% 38.51% $153,635 76% 24% $116,762 $36,872
18 Systems Gadsden Loma Linda Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: parking lots, site specialties/landscaping (drainage), site utilities, roof, ceiling finishes, floor finishes, interior walls, air/ventilation, HVAC, main power/emergency, and lighting/branch circuits, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount
163 23.53% 30.48% $7,567,000 85% 15% $6,431,950 $1,135,050
18 Systems Los Alamos Mountain Elementary School
Project Description
Planning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: site utilities, walkways, exterior walls, exterior doors & windows, roof, ceiling finishes, floor finishes, foundation/slab/structure, interior doors, partitions and stairs, interior walls, air/ventilation, HVAC, main power/emergency, lighting/branch circuits, plumbing, fire sprinkler, and portables, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount
85 27.51% 49.3% $3,919,065 48% 52% $1,881,151 $2,037,914
17 Standards Reserve Glenwood Elementary School
Project Description
Feasibility study to explore all options for the facility to adequacy for 9 students, grades K-3. The current phase local share is advanced, and may be converted to a grant subject to verification of available district resources
1 95.42% 67.86% $693,333 10% 90% $7,000 $63,000
16 Standards Roswell Del Norte Elementary School
Project Description
Funding to complete: district-wide utilization study based on geocode analysis; new educational specifications; and analysis of major building systems. Upon completion, district may return to the PSCOC for next out-of-cycle funding phase and approval of options to renovate/replace and total student capacity to adequacy.
6 82.07% 70.45% $26,833,232 73% 27% $73,000 $27,000
16 Standards Española Abiquiu Elementary School
Project Description
Funding to complete analysis of major building systems. Upon completion, district may return to the PSCOC for next out-of_x0002_cycle funding phase to renovate existing facilities to adequacy for up to 150 students, grades K-6, or the current facility capacity
17 58.04% 55.4% $3,143,796 63% 37% $63,000 $37,000
16 Standards Clovis Highland Elementary School
Project Description
Funding to complete analysis of major building systems. Upon completion, district may return to the PSCOC for next out-of_x0002_cycle funding phase and approval of options to renovate/replace to adequacy for 320 students, grades K-5.
24 52.84% 64.5% $16,374,667 76% 24% $76,000 $24,000
15 Standards Gallup Thoreau Elementary School
Project Description
Planning and design to renovate/replace facilities
(including disposal of existing facilties) to adequacy for
310 students, grades K-5. PSFA shall monitor the
progress of this and all district projects, and may require
the district to hire a construction manager to assist in the
direct management of all PSCOC funded projects. For
any previously awarded projects which are more than 18
months beyond substantial completion, the district shall
commit to completing project audit and financial closeout
by June 30, 2015.
10 64.17% 69.41% $18,720,880 81% 19% $1,516,391 $355,697
15 Standards Raton New Combined Elementary School
Project Description
Planning and design to replace the facilities, combining
the students from Columbian ES, Longfellow ES and
Kearny ES into a single school to adequacy for up to 600
students, grades K-5. Planning shall include a site
selection feasibility study (including disposal of existing
facilties).
  • 11
  • 52
  • 65
  • 63.88%
  • 41.75%
  • 37.96%
  • 54.11%
  • 70.54%
  • 42.82%
$25,023,093 57% 43% $1,426,316 $1,075,993
15 Standards Clovis Parkview Elementary School
Project Description
Planning and design to replace the facilities to adequacy
for 500 students, grades K-5. The district shall report on
the available capacity in the remaining district
elementary schools. The release of construction funding
is contingent on a PSCOC-approved action plan for the
existing Parkview ES of any disposal with potential
PSCOC participation or future use at the district's sole
expense. For any previously awarded projects which are
more than 18 months beyond substantial completion, the
district shall commit to completing project audit and
financial closeout by June 30, 2015.
24 52% 44.47% $26,640,110 76% 24% $2,024,648 $639,363
15 Standards Carlsbad New Combined Elementary School
Project Description
Planning and design to replace the facilities (including
disposal of existing facilties), combining the students
from Puckett ES and Pate ES into a single school on a
new site to adequacy for a core of 600 students and
classrooms for 300 students, grades 1-5, conditional
upon approval of consolidation by the district School
Board and by the Public Education Department. Final
student capacity for classrooms may be adjusted based
upon evidence of need. Offset carryforward of
$1,027,594 shall be applied to a future award.
32 47.71% 54.11% $20,926,080 17% 83% $0 $2,092,608
15 Standards Ruidoso Nob Hill Elementary School
Project Description
Educational specifications and district-wide utilization
study to replace existing facilities (including disposal of
existing facilties) to adequacy for up to 192 students,
grades Pre-K/K. Offset carryforward of $153,961 shall
be applied to a future award. For any previously
awarded projects which are more than 18 months
beyond substantial completion, the district shall commit
to completing project audit and financial closeout by
June 30, 2015.
35 46.95% 63.04% $14,332,220 11% 89% $0 $100,000
15 Standards Gallup New Combined Elementary School
Project Description
Planning and design to replace the facilities (including
disposal of existing facilties), combining the students
from Lincoln ES and Roosevelt ES into a single school
on the Lincoln ES site to adequacy for 380 students,
grades K-5. PSFA shall monitor the progress of this and
all district projects, and may require the district to hire a
construction manager to assist in the direct management
of all PSCOC funded projects. For any previously
awarded projects which are more than 18 months
beyond substantial completion, the district shall commit
to completing project audit and financial closeout by
June 30, 2015.
  • 44
  • 64
  • 44.84%
  • 37.63%
72.86% $22,627,480 81% 19% $1,832,826 $429,922
15 Standards Carlsbad Riverside Elementary School
Project Description
Planning and design to replace the facilities (including
disposal of existing facilties) to adequacy for for 352
students, grades 1-5. Final student capacity for
classrooms may be adjusted based upon evidence of
need.
45 44.7% 59.13% $16,391,750 17% 83% $0 $1,639,175
15 Standards Albuquerque Mountain View Elementary School
Project Description
Planning, design, and construction to renovate/replace
facilities to adequacy for 400 students, grades K-5. For
any previously awarded projects which are more than 18
months beyond substantial completion, the district shall
commit to completing project audit and financial closeout
by June 30, 2015.
49 43.36% 64.65% $18,069,738 57% 43% $6,865,120 $11,204,618
15 Standards State Charter Cartwright Hall
Project Description
Planning and design to renovate the facilities (support
space), including demolition of the annex. The local
match is approved to be funded from the Public School
Capital Outlay Fund through HB55 of the 2014
Legislature. For any previously awarded projects which
are more than 18 months beyond substantial completion,
the district shall commit to completing project audit and
financial closeout by June 30, 2015.
50 43.23% 91.32% $7,038,365 0% 100% $703,837 $0
15 Standards Mountainair Mountainair Jr./Sr. High School
Project Description
Planning and design to renovate/replace the buildings on
the HS campus for 170 students, grades 7-12 . Planning
shall include a district-wide feasibility study, lifecycle cost
analysis and an evaluation of maintenance and operation
costs. The district shall present the findings to the
Council before proceeding with the design phase of the
project.
85 33.85% 45.11% $13,333,333 36% 64% $480,000 $853,333
15 Standards State Charter Garrett Dormitory
Project Description
Planning and design to renovate existing dormitory to
adequacy, including HVAC, piping, and drainage
deficiencies for up to 50 students. The NMSBVI shall
seek direct legislative appropriations, including GO
Bonds and STBs, through HED and the Legislature to
accommodate the local share of the total estimated
project cost. For any previously awarded projects which
are more than 18 months beyond substantial completion,
the district shall commit to completing project audit and
financial closeout by June 30, 2015.
87 33.58% 61.73% $1,649,667 50% 50% $82,483 $82,483
15 Standards State Charter Delgado Hall
Project Description
Planning and design to renovate the facilities (support
space), including demolition of the annex. A local match
reduction of 50% of the phase 1 award is approved.
Unless a financial need can be verified to the PSCOC at
a future meeting to adjust the local match reduction, the
NMSD shall accommodate 50% of the local share of the
phase 1 award. For any previously awarded projects
which are more than 18 months beyond substantial
completion, the district shall commit to completing
project audit and financial closeout by June 30, 2015.
90 33.3% 90.33% $2,663,499 0% 100% $133,175 $133,175
14 Standards Deming Deming Intermediate School
Project Description
Planning and design to build new intermediate school on a new site to
adequacy for a core capacity of 450 students, and classrooms for 350
students, grade 6. Award includes demolition of existing intermediate
school facilities. Student capacity will be established following final
determination of the proposed Columbus charter school, but no later than
the 2013 PEC decision.
3 84.78% $17,700,000 71% 29% $1,157,300 $472,700
14 Standards State Charter New Mexico School For The Blind And Visually Impaired
Project Description
Planning and design to renovate Quimby Gym to adequacy for 70 students,
grades K-12. The NMSBVI shall seek direct legislative appropriations,
including GO Bonds and STBs, through HED and the Legislature to
accommodate the local share of the total estimated project cost.
8 77.11% $1,844,015 50% 50% $92,201 $92,201
14 Standards Lordsburg Lordsburg High School
Project Description
Educational specifications and district-wide utilization study to
renovate/replace various facilities at the high school to adequacy for 160
students, grades 9-12. Utilization study shall explore options for
consolidation of Southside ES (3rd & 4th grades with wNMCI rank of #18)
with Central ES (5th & 6th with wNMCI rank of #2) for a 3rd through 5th
grade configurations with 6th grade moved to the newly renovated Dugan-
Turango MS. Based on the feasibility of the consolidation, the district
should apply for renovations of the existing Central ES in a future award
cycle and include disposal of the Southside ES school site and the old
abandoned high school. Future out-of-cycle construction funding may
consider advance/partial waiver of local share.
10 71.33% $11,000,000 35% 65% $35,000 $65,000
14 Standards Central Grace B Wilson Elementary School & Ruth N Bond Elementary School
Project Description
Educational specifications and utilization/infrastructure study to
renovate/replace existing facilities, combining the K-3 grade students from
Ruth N Bond ES with the 4-6 grade students from Grace B Wilson ES into a
single school on the Ruth N Bond site. The district may return for out-ofcycle
planning and design funds to replace the facilities to adequacy for 715
students grades K-6, based on the outcome of the study and approval of
consolidation by the district School Board and by the Public Education
Department.The district is required to update their Facility Master Plan to
reflect the new grade configurations at the elementary schools.
  • 12
  • 34
  • 67.53%
  • 50.87%
$25,000,000 61% 39% $61,000 $39,000
14 Standards Mesa Vista Ojo Caliente Elementary School
Project Description
Planning and design, including campus-wide educational specifications and
utilization/infrastructure study to renovate/replace the existing facilities to
adequacy for 135 students, grades K-8.
20 60.45% $7,000,000 46% 54% $322,000 $378,000
14 Standards Reserve Reserve Combined School
Project Description
Educational specifications to renovate/replace various facilities at the
combined school to adequacy for 140 students, grades K-12. Future out-ofcycle
design and construction funding may consider advance/partial waiver
of local share upon passing a bond to bring to practical capacity and
meeting eligibility requirements. An advance of the local share for the
phased request is authorized and shall be repaid within a 4 year period.
Offset carryforward of $195,763 shall be applied to a future award.
21 59.02% $8,700,000 16% 84% $8,000 $42,000
14 Standards Grants Los Alamitos Middle School
Project Description
Educational specifications to replace the existing middle school and
utilization study of the elementary feeder schools. The district may return
for out-of-cycle planning and design funds to replace the middle school
facilities to adequacy for 453 students grades 7-8, and the possible
inclusion of the 217 6th grade students from the feeder schools, based on
the outcome of the study. The district is required to update their Facility
Master Plan to reflect the new grade configurations at the elementary and
middle schools.
24 57.4% $25,816,453 74% 26% $74,000 $26,000
14 Standards Roswell Parkview Early Literacy
Project Description
Planning and design, including educational specifications, to construct new
addition and to renovate existing facilities to adequacy for 350 3&4-year-old
DD students.
30 53.41% $10,500,000 72% 28% $756,000 $294,000
14 Standards Albuquerque Marie Hughes Elementary School
Project Description
Planning and design for classroom addition to replace existing portables,
renovation/expansion of existing cafeteria and kitchen, and related site
improvements to adequacy for 600 students, grades K-5.
36 50.63% $8,475,010 55% 45% $466,126 $381,375
14 Standards Hobbs New Elementary School
Project Description
Planning and design, including district-wide educational specifications, to
construct a new elementary school to adequacy for 450 students, grades K-
5, including 79 3&4-year-old DD students from Jenkins-Nunan Center
(125.45% wNMCI).
41 48.41% $16,128,870 54% 46% $870,959 $741,928
14 Standards Hobbs Broadmoor Elementary School
Project Description
Planning and design to demolish existing facilities and construct new two
story elementary school to adequacy for up to 400 students, grades K-5.
Student population shall be based upon the district-wide educational
specifications, utilization, and validation of growth.
41 48.41% $14,440,157 54% 46% $779,768 $664,247
14 Standards Central Newcomb High School
Project Description
Utilization study to renovate existing facilities and reduce gross square
footage to adequacy. The utilization study should include an examination of
Newcomb ES and the possible utilization of the relatively new Newcomb MS
as the location for Newcomb ES. The newly renovated Newcomb HS could
be repurposed to house both the MS and the HS. The district may return for
out-of-cycle planning and design funds to renovate the high school facilities
to adequacy for 237 students grades 9-12; the district is also encouraged to
apply for an award for Newcomb ES in a future award cycle, based on the
outcome of the study. The district will be required to update their Facility
Master Plan to reflect the new grade configurations at the schools.
45 46.27% $11,911,896 61% 39% $61,000 $39,000
14 Standards State Charter Aldo Leopold Charter School
Project Description
The PSCOC shall first determine availability of existing facilities at the Silver
Consolidated School District that meet the programmatic needs of the
charter. If none are available, then this award is for early planning, update
of educational specifications, and feasibility study to consider various sites,
funding requirements and financing options to construct or acquire publiclyowned
facilities for 210 students, grades 6-12.
47 46.09% $9,000,000 47% 53% $23,500 $26,500
14 Standards Albuquerque Arroyo Del Oso Elementary School
Project Description
Planning, design and construction to renovate and expand administration
area, including drainage improvements to adequacy for 420 students,
grades K-5.
49 45.34% $1,022,122 55% 45% $562,167 $459,955
14 Standards Gallup Ramah Elementary School
Project Description
Planning and design to replace the facilities to adequacy for 190 students,
grades K-5; award includes demolition of old Ramah HS to accommodate
new construction, and demolition of the existing Ramah ES once
construction is complete. The district must update their priority listing in their
5 year FMP and have school board approval. The Gallup District
Superintendent and School Board shall report at the September 2013
PSCOC meeting with an action plan for signifcant progress on previously
approved projects in Gallup.
54 44.13% $9,467,853 81% 19% $738,660 $173,266
14 Standards Farmington Northeast Elementary School
Project Description
Planning and design for renovations/additions to existing facilities to
adequacy for 558 students, grades K-5. Prior to the release of Phase 2
funding, the district shall have a current FMP approved by PSFA.
61 41.92% $12,700,000 60% 40% $762,000 $508,000
14 Standards State Charter New Mexico School For The Blind And Visually Impaired
Project Description
Planning and design to replace the Sacramento Dormitory with cottage-style
facilities, including demolition of the existing facilities. NMSBVI must justify
demand of both daytime and permanent residential students for utilization of
all 41 residential post-project rooms for both post-school preparation
expanded core and other necessary residential space that may include
school support functions. Local share for educational space and school
support space will be determined by the completion of the design phase.
The NMSBVI shall seek direct legislative appropriations, including GO
Bonds and STBs, through HED and the Legislature to accommodate the
local share of the total estimated project cost.
75 38.58% $2,294,411 50% 50% $114,721 $114,721
14 Standards Albuquerque Collet Park Elementary School
Project Description
Planning, design and construction for kindergarten classroom addition,
renovation of existing spaces, renovation/expansion of administration area,
and upgrade of dining and kitchen areas to adequacy for 375 students,
grades K-5.
76 38.53% $5,028,217 55% 45% $2,765,519 $2,262,698
14 Standards Belen Rio Grande Elementary School
Project Description
Educational specifications and utilization/infrastructure study to
renovate/replace existing facilities to adequacy for 410 students, grades
3&4-year-old DD through 6th. The district may return for out-of-cycle
planning and design funds. Prior to expenditure of PSCOC funds, the
district must submit a corrective action plan to address audit findings.
77 38.4% $16,027,945 63% 37% $63,000 $37,000
14 Standards Gadsden New Elementary School
Project Description
Planning and design to construct new elementary school to adequacy in the
Chaparral area to relieve overcrowding, with design capacity for a core of
550 students, and classrooms for 250 students, grades K-6.
78 38.23% $19,107,485 87% 13% $1,435,500 $214,500
14 Standards Gadsden Chaparral Elementary School
Project Description
Planning and design to add new classroom addition to replace barracks and
portables, and renovate existing school to adequacy for 550 students,
grades K-6. The wNMCI of the existing school will be 34.69% following
removal of overcrowding with the construction of the new school.
78 38.23% $14,475,046 87% 13% $1,282,819 $191,686
14 Standards Albuquerque Atrisco Elementary School
Project Description
Planning and design for classroom addition to replace classroom pods and
replacement of the cafeteria/kitchen building, including demolition of existing
spaces, to adequacy for 350 students, grades K-5. Prior to design, a site
master plan must be completed and approved by PSFA.
86 37.16% $9,854,453 55% 45% $541,995 $443,450
14 Standards State Charter New Mexico School For The Blind And Visually Impaired
Project Description
Planning and design to renovate Ditzler Auditorium to adequacy and to
renovate existing Library Building to accommodate the relocation of the
Instructional Resource Center (IRC). The award also includes demolition of
existing IRC building (Bert Reeves Learning Center-11,367sf) thus reducing
the campus square footage footprint. Local share for educational space and
school support space will be determined by the completion of the design
phase. The NMSBVI shall seek direct legislative appropriations, including
GO Bonds and STBs, through HED and the Legislature to accommodate
the local share of the total estimated project cost.
91 36.68% $4,116,993 50% 50% $205,850 $205,850
14 Standards Farmington Hermosa Middle School
Project Description
Planning and design to renovate existing facilities to adequacy for 650
students, grades 6-8. Prior to the release of Phase 2 funding, the district
shall have a current FMP approved by PSFA.
99 34.59% $10,200,000 60% 40% $612,000 $408,000
13 Standards Albuquerque Sandia High School
Project Description
Planning, design and construction for
Phase I to renovate/replace facilities of
the existing school to adequacy for 2,000
students, grades 9-12. The district to
consider preserving the old Yucca
Elementary at its current condition for
future use by charters. Prior to release of
construction funds, detailed phasing
options for the entire project must be
submitted and approved by the PSCOC.
The Council is not committed to Phase 2
funding at this time
91 34.83% $61,000,000 54% 46% $11,781,146 $10,035,791
13 Standards Bernalillo Canto Domingo Elementary School/Middle School
Project Description
Planning and design to renovate/replace
the existing school facilities to adequacy
for 350 students, grades K-8. The district
shall provide satisfactory or better
maintenance and shall provide quarterly
preventive maintenance reports to PSFA
prior to the construction award and for 3
years following substantial completion.
Award is contingent on execution of a 50
year or equivalent term land lease by
January 1, 2013 that is acceptable to the
PSCOC
47 44.05% $15,852,294 42% 58% $665,796 $919,433
13 Standards Capitan Capitan High School & Capitan Elementary School
Project Description
Planning and design to renovate/replace
existing high school facilities to adequacy
for 150 students, grades 9-12, and
planning and design to renovate existing
elementary school facilities to adequacy
for 206 students, grade K-5. Shared
cored facilities shall accommodate the
entire campus. It is recognized that
district does not have financial capacity
for their share of the project. Prior to
construction, the district shall submit a
financial phasing plan that may include
potential advance/waiver. A goal of this
award would be to reduce the gross
square footage of the facility by 50% or
more
  • 9
  • 16
  • 70.52%
  • 61.03%
$24,100,000 10% 90% $241,000 $2,169,000
13 Standards Central Naschitti Elementary School
Project Description
Planning and design to renovate/replace
the existing school facilities to adequacy
for 125 students, grades K-5.
52 42.51% $7,526,427 63% 37% $474,165 $278,478
13 Standards Española Los Niños Kindergarten
Project Description
Planning and design to renovate existing
facilities to adequacy for 196 kindergarten
students
33 48.53% $2,702,500 63% 37% $170,258 $99,993
13 Standards Farmington Farmington High School
Project Description
Planning and design to renovate/replace
the existing school facilities to adequacy
for 1,600 students, grades 9-12
61 40.14% $53,701,112 59% 41% $3,168,366 $2,201,746
13 Standards Gadsden Desert View Elementary School
Project Description
Planning and design to renovate/replace
the existing school facilities to adequacy
for 550 students, grades K-6.
37 46.42% $17,600,000 88% 12% $1,548,800 $211,200
13 Standards State Charter New Mexico School For The Deaf
Project Description
Planning and design to address site
infrastructure needs and deficiencies to
adequacy for 60 students, grades K-12.
Award includes additional recreational
field to support the residential function of
the school in accordance with the special
schools adequacy standards. District
must submit status report at early design
1 1.37% $14,000,000 50% 50% $700,000 $700,000
13 Standards West Las Vegas West Las Vegas Middle School
Project Description
Planning and design to renovate existing
facilities to adequacy for 289 students,
grades 6-8. A goal of this award would
be to reduce the gross square footage of
the facility by 50% or more.
99 34.24% $6,829,118 74% 26% $505,355 $177,557
13 Standards Zuni Dowa Yalanne Elementary School & A:Shiwi Elementary School
Project Description
Planning and design to combine existing
schools and replace school facilities to
adequacy for 700 students, grades K-5.
Prior to construction, the district shall
submit a disposition plan of existing
facilities. Award is contingent on
execution of a 50 year or equivalent term
land lease by January 1, 2013 that is
acceptable to the PSCOC
  • 41
  • 46
  • 45.39%
  • 44.32%
$25,419,409 100% 0% $2,541,941 $0
12 Standards Albuquerque Douglas Macarthur Elementary School
Project Description
Planning and design to renovate and make additions to the existing facilities to adequacy for 242 students, grades K-5
52 $3,689,297 55% 45% $202,911 $166,018
12 Standards Albuquerque Mckinley Middle School
Project Description
Planning and design to renovate and make additions to the existing facilities to adequacy for 600 students, grades 6-8
59 $8,053,853 55% 45% $442,962 $362,423
12 Standards Albuquerque Chaparral Elementary School
Project Description
Planning and design to renovate and make additions to the existing facilities to adequacy for 991 students, grades K-5
56 $14,831,908 55% 45% $815,755 $667,436
12 Standards Belen Family School
Project Description
Intial planning to provide instructional space to adequacy to a maximum equivalent of 82 full-time students serving grades 1-8. Utilization and efficiency shall be maximized and co-location with an existing facility shall be considered.
22 69% 31% $41,400 $18,600
12 Standards Bernalillo Bernalillo High School
Project Description
Planning and design to renovate and replace existing facilities to adequacy for 936 students, grades 9-12.
30 $44,516,000 44% 56% $1,355,200 $1,724,800
12 Standards Central Nataani Nez Elementary School
Project Description
Amend the previous 2008-2009 Standards-based award to Central
Consolidated Schools to renovate Nataani Nez ES to instead close the
school and dispose of by demolition or change in title, with approval for
plan and design for necessary improvements to adequacy for 350 K-3
students transferred to the affected schools. When applying for
construction award, the district shall report to the Council on under_x0002_utilized space at the 3 elementary schools. The award is contingent on
renewal of leases.
$8,471,386 64% 36% $0 $0
12 Standards Española Velarde Elementary School
Project Description
Planning and design to renovate and make additions to existing facilities
to adequacy for 145 students, grades K-6 with certain adequacy
standards to be varianced at district's request. Award also includes a
modification of the previous 05-06 Alcalde ES award to reduce core
capacity to 200 serving grades K-6. District may, at its own expense,
fund increased construction of the core for Alcalde ES to the original
award capacity of 400. District shall demonstrate ability to maintain
facilities and create a plan to pass SB-9 election
60 $4,545,645 64% 36% $290,921 $163,643
12 Standards Española Carinos Charter
Project Description
Initial planning to replace existing facilities (former Middle School East)
to appropriate space for 197 charter students, grades K-6, and utilizing
available facilities within the community. The existing school shall be
demolished. District shall demonstrate ability to maintain facilities and
create a plan to pass SB-9 election.
3 64% 36% $38,400 $21,600
12 Standards Española E. T. S Fairview Elementary School
Project Description
Planning and design to renovate and replace portions of the facility to
adequacy for 420 students, grades K-6. District shall demonstrate ability
to maintain facilities and create a plan to pass SB-9 election. When
applying for construction award, the district shall report to the Council on
under-utilized space.
34 $15,802,204 64% 36% $1,011,341 $568,879
12 Standards Estancia Estancia Middle School
Project Description
Planning and design to renovate, replace, or relocate portions or all of
the middle school facilities to adequacy for 150 students, grades 7-8.
When applying for construction award, the district shall report to the
Council on under-utilized space
48 $7,152,477 69% 31% $493,521 $221,727
12 Standards Raton Columbian Elementary School
Project Description
Amend the 2008-2009 award for Longfellow ES to include planning and design for a new combined K-5 elementary school facility with a core capacity for 630 students and initial classrooms for 442 students, grades K-3. Classrooms for the 4th and 5th grades are contingent upon Kearny ES becoming eligible in a future award cycle and may be requested out_x0002_of-cycle when the district passes a bond for its required match.
24 $20,395,161 68% 32% $0 $0
12 Standards Rio Rancho Colinas Del Norte Elementary School
Project Description
Planning, design and construction to expand the kitchen, cafeteria and gym facilities of the existing school to adequacy for 700 students, grades K-5. Reduce scope funding due to relative condition of the school with a ranking of 472.
$3,079,425 59% 41% $908,430 $631,282
12 Standards Rio Rancho Vista Grande Elementary School
Project Description
Planning, design and construction to expand the kitchen, cafeteria and admin facilities of the existing school to adequacy for 700 students, grades K-5. Reduce scope funding due to relative condition of the school with a ranking of 545.
$1,735,205 59% 41% $511,832 $355,680
12 Standards Santa Rosa Rita Marquez Elementary School/ Anton Chico Middle School
Project Description
Planning and design to replace the existing facilities to adequacy for 100 students, grades K-8. Design goal of 20,000 SF.
37 $7,700,000 60% 40% $462,000 $308,000
12 Standards Socorro San Antonio Elementary School
Project Description
Planning and design to renovate/replace facilities to adequacy for 101 students, grades K-5.
10 $3,175,971 77% 23% $244,550 $73,047
12 Standards Truth or Consequences Truth Or Consequences Elementary School
Project Description
Planning and design to renovate/replace facilities to adequacy for 365 students, grades K-3. Shared space with adjacent Sierra ES to be incorporated into final design, for overall core spaces for 509 students.
36 $12,489,044 40% 60% $499,562 $749,343
12 Standards West Las Vegas Wlv Family Partnership Mhs
Project Description
The previous 2007-2008 Standards-Based Award to West Las Vegas Schools for relocating the Family Partnership MHS to Union ES is cancelled and balances remaining after adjustment for offset shall revert. This award is for initial planning to relocate the school and remodel the former WLV high school cafeteria/multi-purpose building to a maximum equivalent of 80 full-time students, grades 6-12, for appropriate facilities necessary to support the alternative program needs of the school utilizing spaces available at adjacent facilities. Out-of-cycle construction award consideration, including demolition of existing building contingent on PSFA approval of new facility master plan. Offset carryover of $222,007 will be applied to future award.
76% 24% $45,600 $14,400
12 Standards West Las Vegas Union Elementary School
Project Description
The previous 2006-2007 Standards-Based Award to West Las Vegas Schools for consolidating the students from Union ES to the Tony Serna ES campus is cancelled and balances remaining after adjustment for offset shall revert. This award is for planning and design to remodel the current school facility to adequacy for 125 students, grades 2-5. Out-of_x0002_cycle construction award consideration contingent on PSFA approval of new facility master plan. Offset carryover of $173,555 will be applied to future award.
$1,624,428 76% 24% $123,457 $38,986
11 Standards Alamogordo Yucca Elementary School
Project Description
Planning and design to renovate
existing facilities to adequacy for 350
students, grades K-5.
$5,712,223 70% 30% $399,856 $171,367
11 Standards Alamogordo Yucca Elementary School
Project Description
Planning and design to build new ES
with core for 500 students, grades K-5
with initial classrooms for 250 to
relieve overcrowding at Yucca ES.
$10,293,750 70% 30% $720,563 $308,813
11 Standards Cobre Bayard Elementary School
Project Description
Planning and design to renovate
existing facilities to adequacy for 260
students, grades K-6.
$10,310,720 57% 43% $587,711 $443,361
11 Standards Gallup Juan De Onate Elementary School
Project Description
Planning and design to renovate
existing facilities and add classrooms
to replace portables to adequacy for
326 students, grades K-5. Prior to
start of design, district shall provide
district-wide utilization and attendance
study of all elementary schools.
$11,074,712 85% 15% $941,351 $166,121
11 Standards Gallup Washington Elementary School
Project Description
Planning and design to replace
existing facilities to adequacy for 204
students, grades K-5. Prior to start of
design, district shall provide district_x0002_wide utilization and attendance study
of all elementary schools.
$8,921,823 85% 15% $758,355 $133,827
11 Standards Gallup Church Rock Academy
Project Description
Planning and design to replace
existing facilities to adequacy for 269
students, grades K-5, contingent on
district acquiring a new site. Prior to
start of design, district shall provide
district-wide utilization and attendance
study of all elementary schools.
$10,428,811 85% 15% $886,449 $156,432
11 Standards Gallup Thoreau Elementary School
Project Description
Planning and design to renovate
existing facilities and add classrooms
to replace portables to adequacy for
304 students, grades K-5. Prior to
start of design, district shall provide
district-wide utilization and attendance
study of all elementary schools.
$12,415,668 85% 15% $1,055,332 $186,235
11 Standards Gallup Jefferson Elementary School
Project Description
Planning and design to renovate or
replace the existing facilities to
adequacy for 282 students, grades K_x0002_5. Prior to start of design, district shall
provide district-wide utilization and
attendance study of all elementary
schools.
$11,536,013 85% 15% $980,561 $173,040
11 Standards Gallup Lincoln Elementary School
Project Description
Planning and design to renovate or
replace the existing facilities to
adequacy for 261 students, grades K_x0002_5. Prior to start of design, district shall
provide district-wide utilization and
attendance study of all elementary
schools
$10,928,927 85% 15% $928,959 $163,934
11 Standards Gallup Roosevelt Elementary School
Project Description
Planning and design to renovate or
replace the existing facilities to
adequacy for 260 students, grades K_x0002_5. Prior to start of design, district shall
provide district-wide utilization and
attendance study of all elementary
schools.
$11,000,000 85% 15% $935,000 $165,000
11 Standards Las Cruces Las Cruces High School
Project Description
Planning and design to renovate and
replace facilities to bring school to
adequacy for estimated core of 2,000
students with classrooms estimated
for 1,800. Prior to start of design,
district shall provide district-wide
utilization and attendance study of all
high schools
$72,880,000 66% 34% $1,980,000 $1,020,000
11 Standards Las Cruces University Hills Elementary School
Project Description
Planning and design to renovate and
add classroom addition to adequacy
for 400 students, grades K-5
$4,797,000 66% 34% $226,388 $116,624
11 Standards Los Alamos Los Alamos Middle School
Project Description
Planning and design to
renovate/replace facilities and central
kitchen to serve the district to
adequacy for 536 students, grades 7-
8.
$13,500,000 33% 67% $445,500 $904,500
11 Standards Los Alamos Aspen Elementary School
Project Description
Planning and design to renovate/replace facilities to adequacy for 314 students, grades K-6.
$12,214,487 33% 67% $264,000 $536,000
11 Standards Los Lunas Los Lunas High School
Project Description
Planning and design to
renovate/replace facilities to adequacy
for core of 1,800 with classrooms for
1,500 students, grades 9-12.
$65,000,000 80% 20% $2,400,000 $600,000
11 Standards Roswell Valley View Elementary School
Project Description
Planning and design to renovate and
add additions to adequacy for 467
students, grades K-5.
$7,987,243 72% 28% $575,081 $223,643
11 Standards Roswell Berrendo Elementary School
Project Description
Planning and design to renovate and
add additions to adequacy for 564
students, grades K-5
$9,880,371 72% 28% $711,387 $276,650
11 Standards Roswell Military Heights Elementary School
Project Description
Planning and design to renovate and
add additions to adequacy for 443
students, grades K-5
$7,411,839 72% 28% $533,652 $207,531
11 Standards Roswell El Capitan Elementary School
Project Description
Planning and design to replace the
existing facilities to adequacy for 446
students, grades K-5.
$16,969,694 72% 28% $1,221,818 $475,151
10 Standards Fort Sumner Fort Sumner Combined School
Project Description
This award amends the previous 2007-2008 award to renovate/remodel existing
campus to adequacy for grades K-12 with a design capacity of 316. This award
is for Phase 3 renovations for the Middle School and Elementary School. Award
includes an advance of $800,000 which shall be repaid by June 30, 2011, and an
additional partial reduction adjustment to the local match of $1,810,455, which
shall be reduced by any additional non-PSCOC grants received by the district to
meet adequacy. The district shall continue to advance use of FIMS and work
with PSFA staff and REC support to develop and implement meaningful
measures helpful to enhancing maintenance at the district.
$5,929,500 51% 49% $3,024,045 $2,905,455
10 Standards Gadsden Anthony Elementary School
Project Description
The district's application for this project has been deferred due to contingencies
not being met for the 2009-10 award cycle. The Council may approve an out-ofcycle
award pending availability of funds and all contingencies being met. District
shall continue to advance use of FIMS working with PSFA staff to fully implement
meaningful measures helpful to enhancing maintenance at the district.
$13,400,000 89% 11% $0 $0
10 Standards Gallup Thoreau Middle School
Project Description
This award amends the previous 2008-2009 award to provide for construction
funds for renovation/addition to the existing Thoreau MS for a design capacity of
300 students, grades 6-8. District shall continue to advance use of FIMS working
with PSFA staff to fully implement meaningful measures helpful to enhancing
maintenance at the district. Processing of new work order requests must be
addressed in a more timely manner. The district must also increase the types of
PM schedules in PMD to a minimum of 10 to address equipment at all schools in
the district. The district shall demonstrate an inclusion of all schools in their
preventive maintenance program.
$11,500,000 84% 16% $9,660,000 $1,840,000
10 Standards Las Cruces New Las Cruces High School 2009
Project Description
This award amends the previous 2005-2006 and 2006-2007 awards to provide
for remainder of construction funds to construct a new high school for a design
capacity of 2,000 students, grades 9-12. State share amount includes restoring
$536,000 in project funding which was reauthorized to the Camino Real MS
project in 2007-2008. District shall continue to advance use of FIMS working with
PSFA staff to fully implement meaningful measures helpful to enhancing
maintenance at the district. The district must also increase the types of PM
schedules in PMD to a minimum of 10 focused on facilities and the classroom
environment.
$71,162,866 67% 33% $47,856,251 $23,306,615
10 Standards Las Cruces Camino Real Middle School
Project Description
This award amends the previous 2007-2008 and 2008-2009 awards to provide
for remainder of construction funds to construct a new middle school for a design
capacity of 900 students, grades 6-8. District shall continue to advance use of
FIMS working with PSFA staff to fully implement meaningful measures helpful to
enhancing maintenance at the district. The district must also increase the types of
PM schedules in PMD to a minimum of 10 focused on facilities and the classroom
environment.
$30,894,926 67% 33% $20,699,600 $10,195,326
10 Standards Moriarty Moriarty Middle School
Project Description
The district's application for this project has been deferred due to contingencies
not being met for the 2009-10 award cycle. Contingent upon finalization of
design capacity based on projected enrollment, the Council may approve an outof-
cycle award pending availability of funds. District shall continue to advance
use of FIMS working with PSFA staff to fully implement meaningful measures
helpful to enhancing maintenance at the district.
$15,156,754 65% 35% $0 $0
10 Standards Taos Anansi Charter School
Project Description
This award amends the previous 2008-2009 out-of-cycle award of $300,000 to
purchase and equip a modular building to provide additions and renovations to
meet adequacy standards for a design capacity of 120 students, grades K-5.
Award is for additional lease payments under lease-purchase agreement for
leasehold improvements to be utilized within 1 year, and an amortization
schedule with as short a term as possible shall be submitted to the Awards
Subcommittee for approval. District shall update its PM Plan to incorporate the
charter schools as part of the maintenance program. District must also continue
to advance its use of FIMS working with PSFA staff to develop and implement
meaningful measures helpful to enhancing maintenance at the district.
$3,094,377 14% 86% $433,213 $2,661,164
10 Standards Tucumcari Tucumcari High School
Project Description
This award amends the previous 2007-2008 and 2008-2009 awards to provide
for remainder of construction funds to remodel and construct new
classroom/support facilities at the high school for a design capacity of 335,
grades 9-12. PSCOC agrees to advance $2,265,075 toward the local match of
which $625,075 is to be repaid by December 31, 2010 and the balance by June
30, 2011. District shall continue to advance use of FIMS working with PSFA staff
to develop and implement meaningful measures helpful to enhancing
maintenance at the district.
$14,239,967 75% 25% $10,679,975 $3,559,992
10 Standards Eunice Mettie Jordan Elementary School
Project Description
This award is for educational specifications, planning and design to replace
existing school for a design capacity of 300 students, grades K-5. The Council
may approve an out-of-cycle award pending availability of funds. The district
shall continue to advance use of FIMS working with PSFA staff to develop and
implement meaningful measures helpful to enhancing maintenance at the district.
14 $12,500,000 10% 90% $125,000 $1,125,000
10 Standards Eunice Caton Middle School
Project Description
This award is for educational specifications, planning and design to replace
existing school for a design capacity of 160 students, grades 6-8. The Council
may approve an out-of-cycle award pending availability of funds. The district
shall continue to advance use of FIMS working with PSFA staff to develop and
implement meaningful measures helpful to enhancing maintenance at the district.
39 $9,000,000 10% 90% $90,000 $810,000
10 Standards Farmington Tibbetts Middle School
Project Description
This award is for educational specifications, planning and design to replace
existing school with a design capacity of 650 students, grades 6-8. The district
shall continue to advance use of FIMS and establish target dates for
maintenance goals listed in its recently updated PM Plan.
49 $34,000,000 59% 41% $973,500 $676,500
10 Standards Gallup Crownpoint Elementary School
Project Description
This award is for educational specifications, planning and design to replace
existing school with a design capacity of 260 students, grades K-5. District shall
continue to advance use of FIMS working with PSFA staff to fully implement
meaningful measures helpful to enhancing maintenance at the district.
Processing of new requests must be addressed in a more timely manner. The
district shall also increase the types of PM schedules in PMD to a minimum of 10
to address equipment at all schools in the district. The district shall demonstrate
an inclusion of all schools in their preventive maintenance program.
9 $10,843,560 84% 16% $1,078,343 $205,399
10 Standards Grants Cubero Elementary School
Project Description
This award is for educational specifications to renovate/replace existing school
facilities to adequacy for a design capacity of 250 students, grades K-6. District
shall update its PM Plan prior to September 30, 2009 and continue to advance
use of FIMS working with PSFA staff to fully implement meaningful measures
helpful to enhancing maintenance at the district.
70 $7,500,000 81% 19% $22,584 $5,297
10 Standards Hobbs Hobbs High School
Project Description
This award is for planning, design and construction of a new cafeteria for a
design capacity of 1,700 students, grades 10-12 and central kitchen. Award also
includes planning & design for Phase II and III renovations and improvements.
Award of additional square footage for central kitchen at the high school requires
permanent variance of full service kitchen square footage requirements at all
school facilities district-wide in the Facilities Assessment Database. The district
shall continue to advance use of FIMS working with PSFA staff to implement
meaningful measures helpful to enhancing maintenance at the district.
17 $26,316,381 56% 44% $5,040,000 $3,960,000
10 Standards Las Cruces Loma Heights Elementary School
Project Description
This award is for educational specifications, planning and design to renovate and
make additions at existing school for a design capacity of 600 students, grades
(K-5). Award for increase in capacity contingent upon demonstration of need by
district-wide utilization study of elementary schools. District shall continue to
advance use of FIMS working with PSFA staff to fully implement meaningful
measures helpful to enhancing maintenance at the district. The district must also
increase the types of PM schedules in PMD to a minimum of 10 focused on
facilities and the classroom environment.
3 $11,116,706 67% 33% $744,819 $366,851
10 Standards Los Alamos Los Alamos High School
Project Description
This award is for educational specifications, planning and design to replace B, C
& D wings, and renovations/improvements to media center and gymnasium.
Award is based on design capacity of 1,200 students, grades 9-12. The Council
may approve an out-of-cycle award pending availability of funds. The district
shall continue to advance its use of FIMS working with PSFA staff to develop and
implement meaningful measures helpful to enhancing maintenance at the district.
The district must also develop and implement documented policies and
procedures to support its PM Program.
23 $27,222,000 28% 72% $495,320 $1,273,680
10 Standards Los Lunas Bosque Farms Elementary School
Project Description
This award is for planning, design and construction of renovations and new
additions to adequacy for a design capacity of 500 students, grades K-6. The
district shall continue to advance its use of FIMS working with PSFA staff to
develop and implement meaningful measures helpful to enhancing maintenance
at the district.
34 $14,207,508 81% 19% $11,508,081 $2,699,427
10 Standards Roswell Missouri Avenue Elementary School
Project Description
This award is for educational specifications, planning, design and construction to
renovate/replace existing school with a design capacity of 375 students (K-5).
Design must address proposed site limitations. The district must address and
resolve the excessive backlog of PM work orders (220) and continue to advance
use of FIMS working with PSFA staff to develop and implement meaningful
measures helpful to enhancing maintenance at the district. Facility equipment
shall be linked to preventive maintenance schedules for all district schools. The
district must also increase the types of PM schedules in PMD to a minimum of 10
focused on facilities and the classroom environment. The district shall submit a
management plan outlining concurrent development of all projects.
1 $14,148,862 72% 28% $10,187,181 $3,961,681
10 Standards Roswell East Grand Plains Elementary School
Project Description
This award is for educational specifications (utilization only), planning and design
to bring existing school to adequacy with a design capacity of 275 students (K-5).
The district must address and resolve the excessive backlog of PM work orders
(220) and continue to advance use of FIMS working with PSFA staff to develop
and implement meaningful measures helpful to enhancing maintenance at the
district. Facility equipment shall be linked to preventive maintenance schedules
for all district schools. The district must also increase the types of PM schedules
in PMD to a minimum of 10 focused on facilities and the classroom environment.
The district shall submit a management plan outlining concurrent development of
all projects.
4 $7,380,222 72% 28% $531,376 $206,646
10 Standards Roswell Monterrey Elementary School
Project Description
This award is for educational specifications (utilization only), planning and design
to bring existing school to adequacy with a design capacity of 450 students (K-5).
The district must address and resolve the excessive backlog of PM work orders
(220) and continue to advance use of FIMS working with PSFA staff to develop
and implement meaningful measures helpful to enhancing maintenance at the
district. Facility equipment shall be linked to preventive maintenance schedules
for all district schools. The district must also increase the types of PM schedules
in PMD to a minimum of 10 focused on facilities and the classroom environment.
The district shall submit a management plan outlining concurrent development of
all projects.
5 $8,602,500 72% 28% $619,380 $240,870
10 Standards Roswell Pecos Elementary School
Project Description
This award is for educational specifications (utilization only), planning and design
to bring existing school to adequacy with a design capacity of 450 students (K-5).
The district must address and resolve the excessive backlog of PM work orders
(220) and continue to advance use of FIMS working with PSFA staff to develop
and implement meaningful measures helpful to enhancing maintenance at the
district. Facility equipment shall be linked to preventive maintenance schedules
for all district schools. The district must also increase the types of PM schedules
in PMD to a minimum of 10 focused on facilities and the classroom environment.
The district shall submit a management plan outlining concurrent development of
all projects.
8 $7,642,760 72% 28% $550,279 $213,997
10 Standards Texico Texico Combined School
Project Description
This award is for planning, design and construction to bring existing schools to
adequacy with a design capacity of 560 students (K-12). The district shall
continue to advance use of FIMS working with PSFA staff and REC Support to
develop and implement meaningful measures helpful to enhancing maintenance
at the district.
109 $6,278,495 63% 37% $3,955,452 $2,323,043
9 Standards Belen Infinity High School
Project Description
This award modifies the previous 2006-2007 award to provide for design and
construction of a replacement facility, for a capacity of 75 students, serving grades
9-12, to support the programmatic and educational functions as funded through the
Public Education Department. Design will not begin until educational
specifications, with utilization, is completed and determined to be consistent with
standards. If the district declines its previous 2006-2007 Standards-Based Roof
Award due to the work being completed through insurance claim, an offset of
$549,749 will be applicable to this project. The district is required to update its PM
plan prior to Oct 1, 2008; work with contractor to complete Phase II of equipment
inventory; and document district utility cost and consumption data in FIMS UD.
$5,690,577 69% 31% $1,963,249 $882,039
9 Standards Cobre Hurley Elem
Project Description
This Award modifies the previous 2007-2008 award to provide construction funding
to renovate the existing Hurley ES for a capacity of 190 students, serving grades K-
6. PSCOC agrees to advance $2,352,709 toward the local match to be repaid
within 1 year of this award. The District is required to update its PM plan prior to
Oct 1, 2008; complete the equipment inventory; continue progress with preventive
maintenance program and FIMS with minimum 10 equipment types scheduled in
PMD prior to Jan 1, 2009.
$5,738,315 59% 41% $3,385,606 $2,352,709
9 Standards Gadsden Gadsden High School
Project Description
This award modifies the previous 2006-2007 & 2007-2008 awards to provide for
the design of the entire Gadsden HS project for a student capacity of 1850, and the
construction of the Trade/Music Bldg. (Career Pathways) Phase. The construction
of the Trade/Music Bldg. (including demolition of the existing) will not proceed until
the educational specification, which shall include complete campus utilization, is
completed and determined to be consistent with standards. The design goal for the
entire campus will be 150 sq. ft. per student. The district is required to update its
PM plan prior to Oct 1, 2008 and then execute the PM plan and make continued
effective use of FIMS.
$14,573,862 88% 12% $12,824,999 $1,748,863
9 Standards Gallup Hiroshi Miyamura High School
Project Description
This Award modifies the previous 2007-2008 award to provide for construction
funding to replace/renovate existing JHS and convert to a second HS with a design
capacity of 1,200 serving grades 9-12 . The district is encouraged to complete an
inventory of current furniture, fixtures and equipment that may be included in this
project. The district is required to complete its FIMS equipment inventory; continue
to execute its PM plan; and make effective use of FIMS.
$42,720,447 83% 17% $35,457,971 $7,262,476
9 Standards Jemez Valley San Diego Riverside
Project Description
This award modifies and extends the previous 2004-2005 award to relocate the
San Diego Riverside Charter School to an existing facility offered by the school
district to accommodate 105 students, serving grades K-8. Upon acceptance, the
charter school will work with PSFA to identify deficiencies and make necessary
renovations to fulfill the Charter agreement. Alternately, if the Charter school elects
to remain at their existing facilities, all required corrections necessary to fulfill the
charter agreement will be the responsibility of the facility landlord. The existing
DCP funds in the amount of $330,000 and the state's previous award of $990,000
(total of $1,320,000) can be used toward making these corrections at either
location. This award is contingent upon the required match by the Charter School
or Tribal landlord being available by December 31, 2008. Before design may
proceed, the district facility master plan must be updated to incorporate the charter
school & district's agreement with this award. In either case, the charter school
agrees to maintain the facilities and provide written procedures for preventive
maintenance that must be implemented prior to Jan 1, 2009.
$2,933,333 45% 55% $1,320,000 $1,613,333
9 Standards Las Cruces Camino Real Middle
Project Description
This Award modifies the previous 2007-2008 award to provide for design and
construction manager-at-risk through completion of design and agreement of
Guaranteed Maximum Price only. Any early work construction funding must be
brought to the Council for out-of-cycle consideration. The middle school is to
accommodate a design capacity of 900 serving grades 6-8 with a design goal of
132 sq.ft. per student. The district is required to update its PM plan prior to Oct 1,
2008; execute the PM plan, continue use of FIMS MD and UD, and make better
use of PMD by implementing PM schedules for facility equipment prior to Jan 1,
2009.
$5,401,631 67% 33% $3,619,093 $1,782,538
9 Standards Los Lunas Katherine Gallegos Elem
Project Description
This Award modifies the previous 2007-2008 award to provide for construction of a
classroom addition to bring the existing Katherine Gallegos to a design capacity for
500 students, serving grades K-6 . The district is required to continue to execute
their PM plan and make effective use of FIMS.
$5,517,151 78% 22% $4,303,378 $1,213,773
9 Standards Raton Raton High
Project Description
This Award modifies the previous 2007-2008 award to provide for construction
funds to renovate the existing Raton HS with a design capacity of 395, serving
grades 9-12. The district is required to continue to execute the PM Plan and make
effective use of FIMS.
$6,848,147 67% 33% $4,588,258 $2,259,889
9 Standards Tucumcari Tucumcari High
Project Description
This Award modifies the previous 2007-2008 award to provide construction funding
to complete Phase 1 and design funds through Construction Documents for Phase
2 for a design capacity of 335, serving grades 9-12. The district is required to
continue to execute their PM plan and make effective use of FIMS.
$2,300,000 75% 25% $1,725,000 $575,000
9 Standards Albuquerque Ventana Elementary School
Project Description
Award is for design and construction funds for the new Tierra Antigua ES (NWES
Prototype 1) to relieve overcrowding at the existing Ventana Ranch ES with a
design capacity of 650 students, serving grades K-5. The state's match of
$8,486,281 will be applied toward the district's advance for its two new high
schools and direct appropriation offset. The district is required to update its PM
plan prior to Oct 1, 2008; execute their updated PM plan, continue to use FIMS MD
and UD, and make improved use of FIMS PMD, with a minimum 10 equipment
types prior to Jan 1, 2009.
1 $16,999,762 52% 48% $8,486,281 $7,833,491
9 Standards Albuquerque Ventana Elementary School
Project Description
Award is for design and construction funds for the new Sunset View ES (NWES
Prototype 2) to relieve overcrowding at the existing Ventana Ranch ES with a
design capacity of 650 students, serving grades K-5. The state's match of
$8,485,983 will be applied toward the district's advance for its two new high
schools and direct appropriation offset. The district is required to update its PM
plan prior to Oct 1, 2008; execute their updated PM plan, continue to use FIMS MD
and UD, and make improved use of FIMS PMD, with a minimum 10 equipment
types prior to Jan 1, 2009.
1 $16,999,166 52% 48% $8,485,983 $7,833,216
9 Standards Albuquerque Susie R. Marmon Elementary School
Project Description
Award is for design and construction funds to replace the existing modular school
with a new permanent facility. The state's match of $10,825,353 will be applied
toward the district's advance for its two new high schools and direct appropriation
offset. The district is required to update its PM plan prior to Oct 1, 2008; execute
their updated PM plan, continue to use FIMS MD and UD, and make improved use
of FIMS PMD, with a minimum 10 equipment types prior to Jan 1, 2009.
4 $23,131,096 52% 48% $10,825,353 $9,992,633
9 Standards Albuquerque Adobe Acres Elementary School
Project Description
Award is for design and construction funds for the new SWES (Prototype 3) to
relieve overcrowding at the existing Adobe Acres ES with a design capacity of 650
students, serving grades K-5. The state's match of $8,486,039 will be applied
toward the district's advance for its two new high schools and direct appropriation
offset. The district is required to update its PM plan prior to Oct 1, 2008; execute
their updated PM plan, continue to use FIMS MD and UD, and make improved use
of FIMS PMD, with a minimum 10 equipment types prior to Jan 1, 2009.
5 $16,999,277 52% 48% $8,486,039 $7,833,267
9 Standards Albuquerque Georgia O'Keefe Elementary School
Project Description
Award is for design and construction funds to replace the existing modular school
with a new permanent facility. The state's match of $9,918,152 will be applied
toward the district's advance for its two new high schools and direct appropriation
offset. The district is required to update its PM plan prior to Oct 1, 2008; execute
their updated PM plan, continue to use FIMS MD and UD, and make improved use
of FIMS PMD, with a minimum 10 equipment types prior to Jan 1, 2009.
10 $21,478,589 52% 48% $9,918,152 $9,155,217
9 Standards Albuquerque Edward Gonzales
Project Description
Award is for design and construction funds for the new Helen Cordero Primary
School to relieve overcrowding at the existing Edward Gonzales Elementary with a
design capacity of 650 students, serving grades K-2. The state's match of
$11,133,677 will be applied toward the district's advance for its two new high
schools and direct appropriation offset. The district is required to update its PM
plan prior to Oct 1, 2008; execute their updated PM plan, continue to use FIMS MD
and UD, and make improved use of FIMS PMD, with a minimum 10 equipment
types prior to Jan 1, 2009.
12 $22,303,040 52% 48% $11,133,677 $10,277,241
9 Standards Albuquerque James Monroe Middle School
Project Description
Award is for design and construction funds to build the new NWMS to relieve
overcrowding at the existing James Monroe Middle School. The state's match of
$18,238,613 will be applied toward the district's advance for its two new high
schools and direct appropriation offset. The district is required to update its PM
plan prior to Oct 1, 2008; execute their updated PM plan, continue to use FIMS MD
and UD, and make improved use of FIMS PMD, with a minimum 10 equipment
types prior to Jan 1, 2009.
63 $38,971,394 52% 48% $18,238,613 $16,835,642
9 Standards Bernalillo Roosevelt Elementary School
Project Description
Award is for design & construction for a new 3,4,5 elementary for a capacity of 390
students. This project is contingent upon the district keeping the playground and
supporting spaces on the east side of the of the ditch/acequia, and work with PSFA
to resolve the traffic issues accessing the new school. The district is required to
update its PM Plan prior to Oct 1, 2008; execute their updated Pm plan; continue
progress with preventive maintenance program and FIMS MD & PMD, with a
minimum of 10 equipment types in PMD prior to Jan 1, 2009; and document district
utility cost and consumption data in FIMS UD.
51 $16,385,587 53% 47% $8,518,917 $7,554,511
9 Standards Bernalillo Willanna D. Carroll Elementary School
Project Description
Award is for planning and design only with an emphasis to renovate the existing
Carroll ES for a design capacity of 528, serving grades K-2. This award is
contingent upon the district working with PSFA to identify specific buildings that will
be demolished once the Roosevelt students are moved to the existing Carroll ES.
The district is required to update its PM Plan prior to Oct 1, 2008; execute their
updated PM plan; continue to use FIMS MD and UD, and continue progress with
preventive maintenance program and FIMS MD & PMD, with a minimum of 10
equipment types in PMD prior to Jan 1, 2009; and document district utility cost and
consumption data in FIMS UD.
74 $904,927 53% 47% $479,611 $425,316
9 Standards Carlsbad Jefferson Montessori Academy
Project Description
Award is for upgrades to Eisenhower to accommodate Jefferson Montessori
Academy charter school for a design capacity of 82 serving grades K-12.
Maintenance procedures for the charter school facility are already included in the
Carlsbad PM plan, which is required to be updated prior to Oct 1, 2008.
54 $1,280,333 16% 84% $204,853 $1,075,480
9 Standards Central Natanni Nez Elementary School
Project Description
Award is for planning & design funds only with an emphasis on renovation of the
existing Natanni Nez ES for a design capacity of 350, serving grades K-3. The
district is required to continue execution of their PM plan and make effective use of
FIMS.
90 $1,114,842 64% 36% $713,499 $401,343
9 Standards Cimarron Moreno Valley High School
Project Description
Award is for an approximately 4,000 square foot facility for a design capacity of 83,
serving grades 9-12, that includes a multi-purpose, warming kitchen, storage, and
related site work. Project is to be phased with Phase I as design only; Phase II
construction funding may be funded upon approval of Awards Subcommittee.
Phase I approval is contingent upon project design within adequacy and full facility
master plan, including utilization calculations, for ultimate school build-out. The
charter is required to establish written procedures for preventive maintenance and
implement prior to Jan 1, 2009. All improvements must be made on charter school
owned land.
77 $2,170,601 10% 90% $147,500 $1,327,500
9 Standards Clovis James Bickley Elementary School
Project Description
Award is for design funds only to renovate the existing elementary to adequacy for
a capacity of 400, serving grades K-6. The district is required to continue execution
of their PM plan and make effective use of FIMS.
29 $734,727 80% 20% $587,782 $146,945
9 Standards Clovis Lockwood Elementary School
Project Description
Award is for design funds only to renovate the existing elementary to adequacy for
a capacity of 371, serving grades K-6. The district is required to continue execution
of their PM plan and make effective use of FIMS.
32 $814,123 80% 20% $651,298 $162,825
9 Standards Clovis Marshall Junior High School
Project Description
Award is for design funds only to renovate the existing JHS to adequacy for a
capacity of 590, serving grades 7-8. The district is required to continue execution of
their PM plan and make effective use of FIMS.
73 $498,845 80% 20% $399,076 $99,769
9 Standards Clovis Bella Vista Elementary School
Project Description
Award is for design funds only to renovate the existing elementary to adequacy for
a capacity of 440, serving grades K-6. The district is required to continue execution
of their PM plan and make effective use of FIMS.
85 $942,741 80% 20% $754,193 $188,548
9 Standards Cobre Central Elementary School
Project Description
Award is for design funds only with emphasis on renovating the existing facility for
a capacity of 290, serving grades K-6. District is required to update their PM plan
prior to Oct 1, 2008; complete equipment inventory; execute their updated PM
plan; continue progress with preventive maintenance program and FIMS with a
minimum of 10 equipment types scheduled in PMD prior to Jan 1, 2009. PSCOC
agrees to advance $240,000 toward local match to be repaid within 1 year of this
award.
53 $600,000 60% 40% $360,000 $240,000
9 Standards Gadsden Anthony Elementary School
Project Description
Award is for planning and design only to bring the existing facilities at Anthony ES
to adequacy for a capacity of 550 students, serving grades K-6. The district is
required to update their PM plan prior to Oct 1, 2008; to execute the updated PM
plan; and make continued effective use of FIMS.
37 $1,260,014 89% 11% $1,121,412 $138,602
9 Standards Gadsden Anthony
Project Description
This award modifies the previous 2007-2008 award for the New Anthony-Berino
ES to construct additional classrooms to accommodate students relocated from the
existing Anthony ES, for a total school design capacity of 550, serving grades K-6.
State/Local match percentages will be at the 2007-2008 rates. The district is
required to update their PM plan prior to Oct 1, 2008; execute the updated PM
plan; and make continued effective use of FIMS.
$2,300,000 88% 12% $2,024,000 $276,000
9 Standards Gallup Thoreau Middle School
Project Description
Award is for design monies only to renovate the existing Thoreau MS to adequacy
for a student capacity of 300, serving grades 6-8. The district is required to
complete equipment inventory; continue to execute their PM plan; and make
effective use of FIMS.
15 $500,000 84% 16% $420,000 $80,000
9 Standards Moriarty Moriarty Middle School
Project Description
Award is for design funds to renovate or replace the existing middle school with an
emphasis on renovation with a student capacity of 300, serving grades 7-8.
Student enrollment must be verified through submission to PSFA of a new/updated
facilities master plan, prior to funds being released. The district's $680,000 offset
will be held in abeyance until a future construction award. The district is required to
continue to execute its PM plan and make effective use of FIMS, including utility
data in UD.
23 $1,967,012 65% 35% $1,278,558 $668,454
9 Standards Peñasco Penasco Junior High School
Project Description
Award is for design & construction to renovate the existing Penasco JHS (7-8th) for
a capacity of 90 students. Before design begins, the educational specification
must be completed and determined to be consistent with standards, including a
utilization analysis of the entire JHS & HS population/facilities. Before all but the
cafeteria corrections begin, the drainage issues on the campus must be resolved.
The required local match must be in place prior to bidding each phase of
construction. At the future completion of all renovations to the JHS, the JHS & HS
will be combined for purposes of the FAD and ranked together. The district is
required to continue to execute its PM plan and make effective use of FIMS.
95 $6,239,658 76% 24% $4,742,140 $1,497,518
9 Standards Raton Longfellow Elementary School
Project Description
Award is for design only for: (1) a single new elementary school for a 630 student
capacity, serving grades K-5, to consolidate and replace three current elementary
schools with construction as each becomes eligible in subsequent award cycles,
with initial classroom capacity of 230 serving grades K-1, or (2) renovations to the
existing elementary for a 230 student capacity serving grades K-1. Before design
funds are released, the facility master plan and educational specification must be
updated to clearly reflect one of the above options with full community consensus.
The district is required to continue to execute its PM Plan and make effective use
of FIMS.
92 $1,697,303 68% 32% $1,154,166 $543,137
9 Standards Socorro Cottonwood Valley
Project Description
Award is for design and construction to provide a multipurpose building per the
charter's presentation, that includes a restroom, storage, P.E. office, and warming
kitchen totaling approximately 4,000 SF serving a capacity of 170, grades K-8 .
The charter is encouraged to establish written procedures for preventive
maintenance and implement them prior to Jan 1, 2009.
11 $1,000,000 77% 23% $770,000 $230,000
25 Lease Assistance Albuquerque Albuquerque Charter Academy
Project Description
$212,727
25 Lease Assistance Aztec Mosaic Academy Charter School
Project Description
$146,808
25 Lease Assistance Albuquerque Ace Leadership High School
Project Description
$218,581
25 Lease Assistance Carlsbad Jefferson Montessori Academy
Project Description
$209,609
25 Lease Assistance Albuquerque Aces Technical Charter School
Project Description
$123,971
25 Lease Assistance Central Dream Dine Charter School
Project Description
$20,390
25 Lease Assistance Albuquerque Albuquerque Aviation Academy
Project Description
$248,350
25 Lease Assistance Cimarron Moreno Valley High School
Project Description
$40,780
25 Lease Assistance Albuquerque Albuquerque Bilingual Academy
Project Description
$303,811
25 Lease Assistance Deming Deming Cesar Chavez Charter High School
Project Description
$130,904
25 Lease Assistance Albuquerque Albuquerque Collegiate Charter School
Project Description
$151,702
25 Lease Assistance Española Mccurdy Charter School
Project Description
$446,541
25 Lease Assistance Albuquerque Albuquerque Institute For Math & Science
Project Description
$249,981
25 Lease Assistance Gallup Dziå‚ Ditå‚'Ooã­ School Of Empowerment, Action, And Perseverance
Project Description
$44,450
25 Lease Assistance Albuquerque Albuquerque School Of Excellence
Project Description
$398,013
25 Lease Assistance Gallup Hozho Academy
Project Description
$552,161
25 Lease Assistance Albuquerque Albuquerque School Of Excellence
Project Description
$353,155
25 Lease Assistance Gallup Middle College High School
Project Description
$26,969
25 Lease Assistance Albuquerque Albuquerque Talent Development Academy
Project Description
$106,028
25 Lease Assistance Gallup Six Directions Indigenous School
Project Description
$52,198
25 Lease Assistance Albuquerque Alice King Community School
Project Description
$332,765
25 Lease Assistance Albuquerque Altura Preparatory School
Project Description
$209,609
25 Lease Assistance Albuquerque Amy Biehl High School
Project Description
$168,014
25 Lease Assistance Albuquerque Cesar Chavez Community School
Project Description
$150,886
25 Lease Assistance Albuquerque Christine Duncan'S Heritage Academy
Project Description
$333,988
25 Lease Assistance Albuquerque Cien Aguas International School
Project Description
$342,552
25 Lease Assistance Albuquerque Coral Community Charter School
Project Description
$137,387
25 Lease Assistance Albuquerque Corrales International School
Project Description
$203,900
25 Lease Assistance Albuquerque Cottonwood Classical Preparatory School
Project Description
$648,402
25 Lease Assistance Albuquerque Digital Arts And Technology Academy
Project Description
$206,893
25 Lease Assistance Albuquerque East Mountain High School
Project Description
$326,648
25 Lease Assistance Moriarty Estancia Valley Classical Academy
Project Description
$480,388
25 Lease Assistance Albuquerque El Camino Real Academy
Project Description
$263,439
25 Lease Assistance Questa Red River Valley Charter School
Project Description
$64,432
25 Lease Assistance Albuquerque Explore Academy
Project Description
$729,962
25 Lease Assistance Questa Roots & Wings Community School
Project Description
$33,222
25 Lease Assistance Albuquerque Explore Academy
Project Description
$332,357
25 Lease Assistance Albuquerque Gilbert L. Sena Charter High School
Project Description
$120,709
25 Lease Assistance Albuquerque Gordon Bernell Charter School
Project Description
$154,556
25 Lease Assistance Albuquerque Health Leadership High School
Project Description
$183,918
25 Lease Assistance Albuquerque Horizon Academy West
Project Description
$374,768
25 Lease Assistance Albuquerque La Academia De Esperanza* 89 Roswell D Sidney Gutierrez Middle School
Project Description
$41,820
25 Lease Assistance Albuquerque Los Puentes Charter School
Project Description
$93,794
25 Lease Assistance Roswell Sidney Gutierrez
Project Description
$106,028
25 Lease Assistance Albuquerque Mark Armijo Academy
Project Description
$114,143
25 Lease Assistance Albuquerque Mission Achievement And Success 1.0
Project Description
$853,525
25 Lease Assistance Albuquerque Mission Achievement And Success 2.0
Project Description
$810,299
25 Lease Assistance Albuquerque Montessori Of The Rio Grande
Project Description
$178,616
25 Lease Assistance Albuquerque Mountain Mahogany Community School
Project Description
$105,996
25 Lease Assistance Albuquerque Native American Community Academy 1000 Indian School 96 Santa Fe S Tierra Encantada Charter School
Project Description
$218,989
25 Lease Assistance Albuquerque Native American Community Academy 1100 Indian School 97 Santa Fe S Turquoise Trail Charter School
Project Description
$503,633
25 Lease Assistance Albuquerque Native American Community Academy Cnm
Project Description
$132,127
25 Lease Assistance Silver Aldo Leopold Charter School
Project Description
$150,000
25 Lease Assistance Albuquerque New Mexico Academy For The Media Arts
Project Description
$101,233
25 Lease Assistance Socorro Cottonwood Valley Charter School
Project Description
$121,275
25 Lease Assistance Albuquerque New Mexico International School
Project Description
$325,424
25 Lease Assistance Taos Anansi Charter School
Project Description
$161,081
25 Lease Assistance Albuquerque Northpoint Charter School
Project Description
$117,039
25 Lease Assistance Taos Taos Academy Charter School
Project Description
$180,536
25 Lease Assistance Albuquerque North Valley Academy
Project Description
$191,870
25 Lease Assistance Taos Taos Integrated School Of The Arts
Project Description
$166,382
25 Lease Assistance Albuquerque Public Academy For Performing Arts
Project Description
$361,719
25 Lease Assistance Taos Taos International School
Project Description
$144,361
25 Lease Assistance Albuquerque Renaissance Academy Charter School
Project Description
$128,049
25 Lease Assistance Taos Taos Municipal Charter School
Project Description
$160,000
25 Lease Assistance Albuquerque Rio Grande Academy Of Fine Arts
Project Description
$111,329
25 Lease Assistance Taos Vista Grande High School
Project Description
$55,869
25 Lease Assistance Albuquerque Robert F. Kennedy Charter High School
Project Description
$219,396
25 Lease Assistance Albuquerque Robert F. Kennedy Charter Middle School
Project Description
$59,947
25 Lease Assistance Albuquerque Solare Collegiate Charter School
Project Description
$247,942
25 Lease Assistance Albuquerque South Valley Academy
Project Description
$492,622
25 Lease Assistance Albuquerque Technology Leadership High School
Project Description
$257,322
25 Lease Assistance Albuquerque The Albuquerque Sign Language Academy
Project Description
$120,301
25 Lease Assistance Albuquerque The Great Academy
Project Description
$81,560
25 Lease Assistance Albuquerque The International School At Mesa Del Sol
Project Description
$265,886
25 Lease Assistance Albuquerque The Montessori Elementary & Middle School
Project Description
$360,087
25 Lease Assistance Albuquerque The New America School
Project Description
$141,507
25 Lease Assistance Albuquerque Tierra Adentro Of New Mexico
Project Description
$201,045
25 Lease Assistance Albuquerque 21St Century Public Academy
Project Description
$307,073
25 Lease Assistance Albuquerque Voz Collegiate Preparatory Charter School
Project Description
$72,588
25 Lease Assistance Albuquerque Albuquerque Charter Academy
Project Description
$211,498
24 Lease Assistance Aztec Mosaic Academy Charter School
Project Description
$146,808
24 Lease Assistance Albuquerque Ace Leadership High School
Project Description
$193,297
24 Lease Assistance Carlsbad Jefferson Montessori Academy
Project Description
$201,453
24 Lease Assistance Albuquerque Aces Technical Charter School
Project Description
$130,088
24 Lease Assistance Central Dream Dine Charter School
Project Description
$21,263
24 Lease Assistance Albuquerque Albuquerque Bilingual Academy
Project Description
$300,956
24 Lease Assistance Cimarron Moreno Valley High School
Project Description
$42,411
24 Lease Assistance Albuquerque Albuquerque Collegiate Charter School
Project Description
$141,507
24 Lease Assistance Deming Deming Cesar Chavez Charter High School
Project Description
$122,340
24 Lease Assistance Albuquerque Albuquerque Institute For Math & Science
Project Description
$277,712
24 Lease Assistance Española Mccurdy Charter School
Project Description
$440,832
24 Lease Assistance Albuquerque Albuquerque School Of Excellence
Project Description
$349,485
24 Lease Assistance Gallup Dziå‚ Ditå‚'Ooã­ School Of Empowerment, Action, And Perseverance
Project Description
$37,925
24 Lease Assistance Albuquerque Albuquerque School Of Excellence
Project Description
$360,903
24 Lease Assistance Gallup Hozho Academy
Project Description
$490,991
24 Lease Assistance Albuquerque Albuquerque Talent Development Academy
Project Description
$117,854
24 Lease Assistance Gallup Middle College High School
Project Description
$26,969
24 Lease Assistance Albuquerque Alice King Community School
Project Description
$366,204
24 Lease Assistance Gallup Six Directions Indigenous School
Project Description
$57,908
24 Lease Assistance Albuquerque Altura Preparatory School
Project Description
$178,616
24 Lease Assistance Jemez Valley San Diego Riverside Charter School
Project Description
$50,975
24 Lease Assistance Albuquerque Amy Biehl High School
Project Description
$176,577
24 Lease Assistance Jemez Valley Walatowa High Charter School
Project Description
$32,624
24 Lease Assistance Albuquerque Cesar Chavez Community School
Project Description
$131,719
24 Lease Assistance Las Cruces Alma D'Arte Charter High School
Project Description
$102,358
24 Lease Assistance Albuquerque Christine Duncan'S Heritage Academy
Project Description
$305,034
24 Lease Assistance Las Cruces Explore Academy
Project Description
$147,216
24 Lease Assistance Albuquerque Cien Aguas International School
Project Description
$342,552
24 Lease Assistance Las Cruces J. Paul Taylor Academy
Project Description
$163,120
24 Lease Assistance Albuquerque Coral Community Charter School
Project Description
$137,387
24 Lease Assistance Las Cruces La Academia Dolores Huerta
Project Description
$55,053
24 Lease Assistance Albuquerque Corrales International School
Project Description
$200,230
24 Lease Assistance Las Cruces Las Montanas Charter High School
Project Description
$137,429
24 Lease Assistance Albuquerque Cottonwood Classical Preparatory School
Project Description
$612,108
24 Lease Assistance Las Cruces Raices Del Saber Xinachtli Community School
Project Description
$83,526
24 Lease Assistance Albuquerque Digital Arts And Technology Academy
Project Description
$206,894
24 Lease Assistance Las Cruces The New America School
Project Description
$119,893
24 Lease Assistance Albuquerque East Mountain High School
Project Description
$302,995
24 Lease Assistance Los Lunas School Of Dreams Academy
Project Description
$452,658
24 Lease Assistance Albuquerque El Camino Real Academy
Project Description
$278,527
24 Lease Assistance Moriarty Estancia Valley Classical Academy
Project Description
$506,488
24 Lease Assistance Albuquerque Explore Academy
Project Description
$641,877
24 Lease Assistance Questa Red River Valley Charter
Project Description
$57,092
24 Lease Assistance Albuquerque Explore Academy
Project Description
$306,258
24 Lease Assistance Questa Roots & Wings Community School
Project Description
$42,739
24 Lease Assistance Albuquerque Gilbert L. Sena Charter High School
Project Description
$115,000
24 Lease Assistance Rio Rancho Explore Academy
Project Description
$125,000
24 Lease Assistance Albuquerque Gordon Bernell Charter School
Project Description
$129,273
24 Lease Assistance Rio Rancho Sandoval Academy Of Bilingual Education
Project Description
$183,510
24 Lease Assistance Albuquerque Health Leadership High School
Project Description
$171,684
24 Lease Assistance Rio Rancho The Ask Academy
Project Description
$404,538
24 Lease Assistance Albuquerque Horizon Academy West
Project Description
$348,669
24 Lease Assistance Rio Rancho The Ask Academy
Project Description
$92,978
24 Lease Assistance Albuquerque La Academia De Esperanza
Project Description
$203,084
24 Lease Assistance Albuquerque Los Puentes Charter School
Project Description
$95,425
24 Lease Assistance Roswell Sidney Gutierrez Middle School
Project Description
$41,820
24 Lease Assistance Albuquerque Mark Armijo Academy
Project Description
$114,143
24 Lease Assistance Roswell Sidney Gutierrez
Project Description
$106,028
24 Lease Assistance Albuquerque Mission Achievement And Success 2.0
Project Description
$703,863
24 Lease Assistance Santa Fe Monte Del Sol Charter School
Project Description
$253,752
24 Lease Assistance Albuquerque Mission Achievement And Success 1.0
Project Description
$862,293
24 Lease Assistance Santa Fe New Mexico School For The Arts
Project Description
$264,662
24 Lease Assistance Albuquerque Montessori Of The Rio Grande
Project Description
$175,762
24 Lease Assistance Santa Fe The Academy For Technology & The Classics
Project Description
$253,841
24 Lease Assistance Albuquerque Mountain Mahogany Community School
Project Description
$105,996
24 Lease Assistance Santa Fe The Masters Program
Project Description
$122,433
24 Lease Assistance Albuquerque Native American Community Academy 1000 Indian School 98 Santa Fe S Thrive Community School
Project Description
$93,386
24 Lease Assistance Albuquerque Native American Community Academy 1100 Indian School 99 Santa Fe S Tierra Encantada Charter School
Project Description
$231,223
24 Lease Assistance Albuquerque Native American Community Academy Cnm
Project Description
$148,031
24 Lease Assistance Santa Fe Turquoise Trail Charter School
Project Description
$522,392
24 Lease Assistance Albuquerque New Mexico Academy For The Media Arts
Project Description
$123,000
24 Lease Assistance Albuquerque New Mexico Academy For The Media Arts
Project Description
$121,275
24 Lease Assistance Albuquerque New Mexico International School
Project Description
$318,084
24 Lease Assistance Taos Anansi Charter School
Project Description
$160,265
24 Lease Assistance Albuquerque North Valley Academy
Project Description
$180,536
24 Lease Assistance Albuquerque North Valley Academy
Project Description
$165,975
24 Lease Assistance Albuquerque Public Academy For Performing Arts
Project Description
$351,931
24 Lease Assistance Taos Taos International School
Project Description
$135,390
24 Lease Assistance Albuquerque Rio Grande Academy Of Fine Arts
Project Description
$63,617
24 Lease Assistance Taos Taos Municipal Charter School
Project Description
$160,000
24 Lease Assistance Albuquerque Robert F. Kennedy Charter High School
Project Description
$236,932
24 Lease Assistance Taos Vista Grande High School
Project Description
$58,723
24 Lease Assistance Albuquerque Robert F. Kennedy Charter Middle School
Project Description
$68,510
24 Lease Assistance West Las Vegas Rio Gallinas School Of Ecology And The Arts
Project Description
$48,000
24 Lease Assistance Albuquerque Solare Collegiate Charter School
Project Description
$224,290
24 Lease Assistance Albuquerque South Valley Academy
Project Description
$490,583
24 Lease Assistance Albuquerque Southwest Aeronautics, Mathematics & Science Academy
Project Description
$228,776
24 Lease Assistance Albuquerque Southwest Preparatory Learning Center
Project Description
$123,156
24 Lease Assistance Albuquerque Southwest Secondary Learning Center
Project Description
$119,893
24 Lease Assistance Albuquerque Technology Leadership High School
Project Description
$206,004
24 Lease Assistance Albuquerque The Albuquerque Sign Language Academy
Project Description
$101,950
24 Lease Assistance Albuquerque The Great Academy
Project Description
$101,950
24 Lease Assistance Albuquerque The International School At Mesa Del Sol
Project Description
$255,895
24 Lease Assistance Albuquerque The Montessori Elementary & Middle School
Project Description
$359,272
24 Lease Assistance Albuquerque The New America School
Project Description
$169,645
24 Lease Assistance Albuquerque Tierra Adentro Of New Mexico
Project Description
$196,152
24 Lease Assistance Albuquerque 21St Century Public Academy
Project Description
$316,045
24 Lease Assistance Albuquerque Voz Collegiate Preparatory Charter School
Project Description
$52,198
24 Lease Assistance Albuquerque William W. & Josephine Dorn Community Charter School
Project Description
$39,600
23 Lease Assistance Albuquerque Albuquerque Charter Academy
Project Description
$212,727
23 Lease Assistance Aztec Mosaic Academy Charter School
Project Description
$145,585
23 Lease Assistance Albuquerque Ace Leadership High School
Project Description
$165,159
23 Lease Assistance Carlsbad Jefferson Montessori Academy
Project Description
$190,443
23 Lease Assistance Albuquerque Aces Technical Charter School
Project Description
$52,198
23 Lease Assistance Central Dream Dine Charter School
Project Description
$18,708
23 Lease Assistance Albuquerque Albuquerque Bilingual Academy
Project Description
$288,315
23 Lease Assistance Cimarron Moreno Valley High School
Project Description
$49,752
23 Lease Assistance Albuquerque Albuquerque Collegiate Charter School
Project Description
$120,709
23 Lease Assistance Deming Deming Cesar Chavez Charter High School
Project Description
$123,156
23 Lease Assistance Albuquerque Albuquerque Institute For Math & Science
Project Description
$283,013
23 Lease Assistance Española La Tierra Montessori School Of The Arts And Sciences
Project Description
$66,879
23 Lease Assistance Albuquerque Albuquerque School Of Excellence
Project Description
$357,233
23 Lease Assistance Española Mccurdy Charter School
Project Description
$427,782
23 Lease Assistance Albuquerque Albuquerque School Of Excellence
Project Description
$327,871
23 Lease Assistance Gallup Dzil Ditl'Ooi School Of Empowerment, Action & Perseverance
Project Description
$39,557
23 Lease Assistance Albuquerque Albuquerque Talent Development Academy
Project Description
$90,532
23 Lease Assistance Gallup Hozho Academy
Project Description
$402,091
23 Lease Assistance Albuquerque Alice King Community School
Project Description
$348,261
23 Lease Assistance Gallup Middle College High School
Project Description
$26,969
23 Lease Assistance Albuquerque Altura Preparatory School
Project Description
$160,265
23 Lease Assistance Gallup Six Directions Indigenous School
Project Description
$55,053
23 Lease Assistance Albuquerque Amy Biehl High School
Project Description
$44,450
23 Lease Assistance Albuquerque Amy Biehl High School
Project Description
$32,624
23 Lease Assistance Albuquerque Cesar Chavez Community School
Project Description
$157,003
23 Lease Assistance Albuquerque Christine Duncan'S Heritage Academy
Project Description
$301,772
23 Lease Assistance Albuquerque Cien Aguas International School
Project Description
$338,474
23 Lease Assistance Albuquerque Coral Community Charter School
Project Description
$137,387
23 Lease Assistance Albuquerque Corrales International School
Project Description
$187,588
23 Lease Assistance Albuquerque Cottonwood Classical Preparatory School
Project Description
$620,672
23 Lease Assistance Albuquerque Digital Arts And Technology Academy High School
Project Description
$206,894
23 Lease Assistance Albuquerque East Mountain High School
Project Description
$296,471
23 Lease Assistance Albuquerque El Camino Real Academy
Project Description
$250,797
23 Lease Assistance Moriarty Estancia Valley Classical Academy
Project Description
$488,952
23 Lease Assistance Albuquerque Explore Academy
Project Description
$550,122
23 Lease Assistance Questa Red River Valley Charter
Project Description
$52,198
23 Lease Assistance Albuquerque Explore Academy
Project Description
$263,439
23 Lease Assistance Questa Roots & Wings Community School
Project Description
$41,188
23 Lease Assistance Albuquerque Gilbert L. Sena Charter High School
Project Description
$101,950
23 Lease Assistance Albuquerque Gordon Bernell Charter School
Project Description
$138,652
23 Lease Assistance Albuquerque Health Leadership High School
Project Description
$197,375
23 Lease Assistance Albuquerque Horizon Academy West
Project Description
$302,588
23 Lease Assistance Albuquerque La Academia De Esperanza
Project Description
$186,772
23 Lease Assistance Roswell Sidney Gutierrez Middle School
Project Description
$41,820
23 Lease Assistance Albuquerque Los Puentes Charter School
Project Description
$111,737
23 Lease Assistance Roswell Sidney Gutierrez
Project Description
$105,620
23 Lease Assistance Albuquerque Mark Armijo Academy
Project Description
$114,132
23 Lease Assistance Albuquerque Mission Achievement And Success 2.0
Project Description
$448,268
23 Lease Assistance Albuquerque Mission Achievement And Success 1.0
Project Description
$905,316
23 Lease Assistance Albuquerque Montessori Of The Rio Grande
Project Description
$174,538
23 Lease Assistance Albuquerque Mountain Mahogany Community School
Project Description
$105,996
23 Lease Assistance Albuquerque Native American Community Academy 1000 Indian School 100 Santa Fe S Tierra Encantada Charter High School
Project Description
$230,407
23 Lease Assistance Albuquerque Native American Community Academy 1100 Indian School 101 Santa Fe S Turquoise Trail Charter School
Project Description
$553,792
23 Lease Assistance Albuquerque Native American Community Academy Cnm
Project Description
$152,109
23 Lease Assistance Silver Aldo Leopold Charter High School
Project Description
$132,535
23 Lease Assistance Albuquerque New Mexico Academy For The Media Arts 103 Socorro D Cottonwood Valley Charter School
Project Description
$121,275
23 Lease Assistance Albuquerque New Mexico Academy For The Media Arts 104 Taos D Anansi Charter School
Project Description
$159,042
23 Lease Assistance Albuquerque New Mexico International School
Project Description
$319,307
23 Lease Assistance Taos Taos Academy Charter School
Project Description
$180,536
23 Lease Assistance Albuquerque North Valley Academy
Project Description
$162,304
23 Lease Assistance Albuquerque North Valley Academy
Project Description
$144,361
23 Lease Assistance Albuquerque Public Academy For Performing Arts
Project Description
$354,378
23 Lease Assistance Taos Taos Municipal Charter School
Project Description
$159,996
23 Lease Assistance Albuquerque Rio Grande Academy Of Fine Arts
Project Description
$67,695
23 Lease Assistance Taos Vista Grande High School
Project Description
$68,510
23 Lease Assistance Albuquerque Robert F. Kennedy Charter High School
Project Description
$203,900
23 Lease Assistance Albuquerque Robert F. Kennedy Charter Middle School
Project Description
$77,074
23 Lease Assistance Albuquerque Siembra Leadership High School
Project Description
$147,633
23 Lease Assistance Albuquerque Solare Collegiate Charter School
Project Description
$239,379
23 Lease Assistance Albuquerque South Valley Academy
Project Description
$493,030
23 Lease Assistance Albuquerque Southwest Preparatory Learning Center
Project Description
$127,641
23 Lease Assistance Albuquerque Southwest Secondary Learning Center
Project Description
$119,893
23 Lease Assistance Albuquerque Technology Leadership High School
Project Description
$206,004
23 Lease Assistance Albuquerque The Albuquerque Sign Language Academy
Project Description
$95,833
23 Lease Assistance Albuquerque The Great Academy
Project Description
$70,549
23 Lease Assistance Albuquerque The International School At Mesa Del Sol
Project Description
$245,903
23 Lease Assistance Albuquerque The Montessori Elementary School
Project Description
$358,456
23 Lease Assistance Albuquerque The New America School
Project Description
$154,964
23 Lease Assistance Albuquerque Tierra Adentro Of New Mexico
Project Description
$189,219
23 Lease Assistance Albuquerque 21St Century Public Academy
Project Description
$294,432
23 Lease Assistance Albuquerque Voz Collegiate Preparatory Charter School
Project Description
$32,624
23 Lease Assistance Albuquerque William W. & Josephine Dorn Charter Community
Project Description
$39,600
22 Lease Assistance Albuquerque Albuquerque Charter Academy
Project Description
$131,692
22 Lease Assistance Aztec Mosaic Academy Charter School
Project Description
$6,000
22 Lease Assistance Albuquerque Ace Leadership High School
Project Description
$159,689
22 Lease Assistance Aztec Mosaic Academy Charter School
Project Description
$59,760
22 Lease Assistance Albuquerque Aces Technical Charter School
Project Description
$34,301
22 Lease Assistance Carlsbad Jefferson Montessori Academy
Project Description
$187,130
22 Lease Assistance Albuquerque Albuquerque Bilingual Academy
Project Description
$285,459
22 Lease Assistance Cimarron Moreno Valley High School
Project Description
$45,333
22 Lease Assistance Albuquerque Albuquerque Collegiate
Project Description
$98,710
22 Lease Assistance Deming Deming Cesar Chavez Charter High School
Project Description
$99,853
22 Lease Assistance Albuquerque Albuquerque Institute For Math & Science
Project Description
$288,508
22 Lease Assistance Española La Tierra Montessori School Of The Arts And Sciences
Project Description
$41,542
22 Lease Assistance Albuquerque Albuquerque School Of Excellence
Project Description
$341,484
22 Lease Assistance Española Mccurdy Charter School
Project Description
$369,810
22 Lease Assistance Albuquerque Albuquerque School Of Excellence
Project Description
$310,994
22 Lease Assistance Gallup Dzil Ditl'Ooi School Of Empowerment, Action & Perseverance
Project Description
$30,451
22 Lease Assistance Albuquerque Albuquerque Talent Development Academy
Project Description
$84,609
22 Lease Assistance Gallup Hozho Academy
Project Description
$308,707
22 Lease Assistance Albuquerque Alice King Community School
Project Description
$352,536
22 Lease Assistance Gallup Middle College High School
Project Description
$26,969
22 Lease Assistance Albuquerque Altura Preparatory School
Project Description
$136,060
22 Lease Assistance Gallup Six Directions Indigenous School
Project Description
$57,930
22 Lease Assistance Albuquerque Amy Biehl High School
Project Description
$177,459
22 Lease Assistance Jemez Valley V. San Diego Riverside Charter School
Project Description
$38,156
22 Lease Assistance Albuquerque Amy Biehl High School
Project Description
$23,631
22 Lease Assistance Jemez Valley V. Walatowa High Charter School
Project Description
$40,018
22 Lease Assistance Albuquerque Cesar Chavez Community School
Project Description
$155,878
22 Lease Assistance Las Cruces Alma D'Arte Charter High School
Project Description
$100,997
22 Lease Assistance Albuquerque Christine Duncan'S Heritage Academy
Project Description
$298,417
22 Lease Assistance Las Cruces Explore Academy
Project Description
$67,077
22 Lease Assistance Albuquerque Cien Aguas International School
Project Description
$323,190
22 Lease Assistance Las Cruces J. Paul Taylor Academy
Project Description
$152,448
22 Lease Assistance Albuquerque Coral Community Charter School
Project Description
$111,578
22 Lease Assistance Las Cruces La Academia Dolores Huerta
Project Description
$54,881
22 Lease Assistance Albuquerque Corrales International School
Project Description
$189,036
22 Lease Assistance Las Cruces Las Montanas Charter High School
Project Description
$117,385
22 Lease Assistance Albuquerque Cottonwood Classical Preparatory School
Project Description
$588,068
22 Lease Assistance Las Cruces Raices Del Saber Xinachtli Com. School
Project Description
$48,021
22 Lease Assistance Albuquerque Digital Arts And Technology Academy High School
Project Description
$132,225
22 Lease Assistance Las Cruces The New America School
Project Description
$139,109
22 Lease Assistance Albuquerque East Mountain High School
Project Description
$286,221
22 Lease Assistance Los Lunas Lunas School Of Dreams Academy
Project Description
$357,109
22 Lease Assistance Albuquerque El Camino Real Academy
Project Description
$212,665
22 Lease Assistance Moriarty Estancia Valley Classical Academy
Project Description
$449,722
22 Lease Assistance Albuquerque Explore Academy
Project Description
$213,427
22 Lease Assistance Questa Red River Valley Charter
Project Description
$55,644
22 Lease Assistance Albuquerque Explore Academy
Project Description
$378,117
22 Lease Assistance Questa Roots & Wings Community School
Project Description
$34,949
22 Lease Assistance Albuquerque Gilbert L. Sena Charter High School
Project Description
$98,710
22 Lease Assistance Rio Rancho Sandoval Academy Of Bilingual Education
Project Description
$158,546
22 Lease Assistance Albuquerque Gordon Bernell Charter School
Project Description
$126,522
22 Lease Assistance Rio Rancho The Ask Academy
Project Description
$349,487
22 Lease Assistance Albuquerque Health Leadership High School
Project Description
$141,777
22 Lease Assistance Rio Rancho The Ask Academy
Project Description
$76,224
22 Lease Assistance Albuquerque Horizon Academy West
Project Description
$304,324
22 Lease Assistance Roswell Early College High School
Project Description
$136,791
22 Lease Assistance Albuquerque La Academia De Esperanza
Project Description
$178,000
22 Lease Assistance Roswell Sidney Gutierrez Middle School
Project Description
$30,947
22 Lease Assistance Albuquerque Los Puentes Charter School
Project Description
$99,853
22 Lease Assistance Roswell Sidney Gutierrez
Project Description
$97,503
22 Lease Assistance Albuquerque Mark Armijo Academy
Project Description
$118,349
22 Lease Assistance Santa Fe Monte De Sol Charter School
Project Description
$231,274
22 Lease Assistance Albuquerque Media Arts Collaborative Charter
Project Description
$187,811
22 Lease Assistance Albuquerque Media Arts Collaborative Charter
Project Description
$187,662
22 Lease Assistance Albuquerque Mission Achievement And Success 2.0
Project Description
$412,828
22 Lease Assistance Santa Fe The Masters Program
Project Description
$116,973
22 Lease Assistance Albuquerque Mission Achievement And Success 1.0
Project Description
$700,879
22 Lease Assistance Santa Fe Tierra Encantada Charter High School
Project Description
$190,388
22 Lease Assistance Albuquerque Montessori Of The Rio Grande
Project Description
$166,168
22 Lease Assistance Santa Fe Turquoise Trail Charter School
Project Description
$348,344
22 Lease Assistance Albuquerque Mountain Mahogany Community School
Project Description
$105,996
22 Lease Assistance Silver Aldo Leopold Charter High School
Project Description
$89,555
22 Lease Assistance Albuquerque Native American Community Academy 1000 Indian School Socorro Cottonwood Valley Charter School
Project Description
$121,275
22 Lease Assistance Albuquerque Native American Community Academy 1100 Indian School Taos Anansi Charter School
Project Description
$144,444
22 Lease Assistance Albuquerque Native American Community Academy Cnm
Project Description
$130,963
22 Lease Assistance Taos Taos Academy Charter School
Project Description
$172,266
22 Lease Assistance Albuquerque New Mexico International School
Project Description
$290,795
22 Lease Assistance Taos Taos Integrated School Of The Arts
Project Description
$135,298
22 Lease Assistance Albuquerque North Valley Academy
Project Description
$144,063
22 Lease Assistance Albuquerque North Valley Academy
Project Description
$126,475
22 Lease Assistance Albuquerque Public Academy For Performing Arts
Project Description
$339,578
22 Lease Assistance Taos Vista Grande High School
Project Description
$58,692
22 Lease Assistance Albuquerque Robert F. Kennedy Charter High School
Project Description
$186,749
22 Lease Assistance West Las Vegas Rio Gallinas School Elementary School/Middle School
Project Description
$35,625
22 Lease Assistance Albuquerque Robert F. Kennedy Charter Middle School
Project Description
$62,504
22 Lease Assistance Albuquerque Siembra Leadership High School
Project Description
$126,195
22 Lease Assistance Albuquerque Solare Collegiate Charter School
Project Description
$142,920
22 Lease Assistance Albuquerque South Valley Academy
Project Description
$473,732
22 Lease Assistance Albuquerque Southwest Aeronautics, Mathematics & Science Academy
Project Description
$173,410
22 Lease Assistance Albuquerque Southwest Preparatory Learning Center
Project Description
$124,657
22 Lease Assistance Albuquerque Southwest Secondary Learning Center
Project Description
$120,434
22 Lease Assistance Albuquerque Technology Leadership High School
Project Description
$150,673
22 Lease Assistance Albuquerque The Albuquerque Sign Language Academy
Project Description
$84,609
22 Lease Assistance Albuquerque The Great Academy
Project Description
$92,612
22 Lease Assistance Albuquerque The Montessori Elementary School
Project Description
$328,525
22 Lease Assistance Albuquerque The New America School
Project Description
$165,787
22 Lease Assistance Albuquerque Tierra Adentro Of New Mexico
Project Description
$188,654
22 Lease Assistance Albuquerque 21St Century Public Academy
Project Description
$267,165
22 Lease Assistance Albuquerque Voz Collegiate Preparatory Charter School
Project Description
$30,490
22 Lease Assistance Albuquerque William W. & Josephine Dorn Charter Community
Project Description
$27,044
21 Lease Assistance Albuquerque Albuquerque Charter Academy
Project Description
$109,034
21 Lease Assistance Albuquerque Ace Leadership High School
Project Description
$192,054
21 Lease Assistance Albuquerque Aces Technical Charter School
Project Description
$47,797
21 Lease Assistance Albuquerque Albuquerque Bilingual Academy
Project Description
$286,773
21 Lease Assistance Albuquerque Albuquerque Collegiate
Project Description
$55,299
21 Lease Assistance Albuquerque Alb Institute For Math & Science
Project Description
$282,102
21 Lease Assistance Albuquerque Albuquerque School Of Excellence
Project Description
$495,453
21 Lease Assistance Albuquerque Albuquerque Talent Development Academy
Project Description
$113,588
21 Lease Assistance Albuquerque Alice King Community School
Project Description
$354,215
21 Lease Assistance Albuquerque Altura Preparatory School
Project Description
$66,509
21 Lease Assistance Albuquerque Amy Biehl High School
Project Description
$177,712
21 Lease Assistance Albuquerque Amy Biehl High School
Project Description
$23,957
21 Lease Assistance Albuquerque Cesar Chavez Community School
Project Description
$148,337
21 Lease Assistance Albuquerque Christine Duncan'S Heritage Academy
Project Description
$303,587
21 Lease Assistance Albuquerque Cien Aguas International School
Project Description
$317,598
21 Lease Assistance Albuquerque Coral Community Charter School
Project Description
$111,683
21 Lease Assistance Albuquerque Corrales International School
Project Description
$195,043
21 Lease Assistance Albuquerque Cottonwood Classical Preparatory School
Project Description
$541,785
21 Lease Assistance Albuquerque 45Digital Arts And Technology Academy High School
Project Description
$152,091
21 Lease Assistance Albuquerque East Mountain High School
Project Description
$267,156
21 Lease Assistance Albuquerque El Camino Real Academy
Project Description
$249,595
21 Lease Assistance Albuquerque Explore Academy
Project Description
$347,490
21 Lease Assistance Albuquerque Gilbert L. Sena Charter High School
Project Description
$126,666
21 Lease Assistance Albuquerque Gordon Bernell Charter School
Project Description
$126,319
21 Lease Assistance Albuquerque Health Leadership High School
Project Description
$164,030
21 Lease Assistance Albuquerque Horizon Academy West
Project Description
$339,456
21 Lease Assistance Albuquerque La Academia De Esperanza
Project Description
$167,393
21 Lease Assistance Albuquerque Los Puentes Charter School
Project Description
$132,270
21 Lease Assistance Albuquerque Mark Armijo Academy
Project Description
$102,509
21 Lease Assistance Albuquerque Media Arts Collaborative Charter Main Bldg. 4401 Central
Project Description
$161,788
21 Lease Assistance Albuquerque Mission Achievement And Success 2.0
Project Description
$179,350
21 Lease Assistance Albuquerque Mission Achievement And Success 1.0
Project Description
$691,645
21 Lease Assistance Albuquerque Montessori Of The Rio Grande
Project Description
$162,162
21 Lease Assistance Albuquerque Mountain Mahogany Community School
Project Description
$105,996
21 Lease Assistance Albuquerque Native American Community Academy 1000 Indian School Main Campus
Project Description
$224,187
21 Lease Assistance Albuquerque Native American Community Academy Cnm Campus 940 Univ. Blvd. Se
Project Description
$127,787
21 Lease Assistance Albuquerque New Mexico International School
Project Description
$249,595
21 Lease Assistance Albuquerque North Valley Academy 7901 4Th Street Art Space
Project Description
$342,446
21 Lease Assistance Albuquerque Public Academy For Performing Arts
Project Description
$333,665
21 Lease Assistance Albuquerque Robert F. Kennedy Charter High School
Project Description
$212,978
21 Lease Assistance Albuquerque Robert F. Kennedy Charter Middle School
Project Description
$47,079
21 Lease Assistance Albuquerque Siembra Leadership High School
Project Description
$111,720
21 Lease Assistance Albuquerque Solare Collegiate Charter School
Project Description
$100,884
21 Lease Assistance Albuquerque South Valley Academy
Project Description
$459,210
21 Lease Assistance Albuquerque Southwest Aeronautics, Mathematics & Science Academy
Project Description
$189,498
21 Lease Assistance Albuquerque Southwest Preparatory Learning Center
Project Description
$143,853
21 Lease Assistance Albuquerque Southwest Secondary Learning Center
Project Description
$138,996
21 Lease Assistance Albuquerque Technology Leadership High School
Project Description
$142,951
21 Lease Assistance Albuquerque The Albuquerque Sign Language Academy
Project Description
$76,971
21 Lease Assistance Albuquerque The Great Academy
Project Description
$117,698
21 Lease Assistance Albuquerque The Montessori Elementary School
Project Description
$320,587
21 Lease Assistance Albuquerque The New America School
Project Description
$178,229
21 Lease Assistance Albuquerque Tierra Adentro Of New Mexico
Project Description
$207,747
21 Lease Assistance Albuquerque 21St Century Public Academy
Project Description
$245,858
21 Lease Assistance Albuquerque William W. & Josephine Dorn Charter Community
Project Description
$38,875
21 Lease Assistance Aztec Mosaic Academy Charter School Aztec Boys & Girls Club
Project Description
$6,000
21 Lease Assistance Aztec Mosaic Academy Charter School
Project Description
$62,434
21 Lease Assistance Carlsbad Jefferson Montessori Academy
Project Description
$182,712
21 Lease Assistance Cimarron Moreno Valley High School
Project Description
$45,323
21 Lease Assistance Española La Tierra Montessori School Of The Arts And Sciences
Project Description
$46,332
21 Lease Assistance Española Mccurdy Charter School
Project Description
$359,181
21 Lease Assistance Gallup Dzil Ditl'Ooi School Of Empowerment, Action And Perseverance Charter
Project Description
$29,518
21 Lease Assistance Gallup Hozho Academy
Project Description
$130,100
21 Lease Assistance Gallup Hozho Academy
Project Description
$42,222
21 Lease Assistance Gallup Middle College High School
Project Description
$26,969
21 Lease Assistance Gallup Six Directions Indigenous School
Project Description
$54,179
21 Lease Assistance Jemez Valley Valley San Diego Riverside Charter School
Project Description
$38,188
21 Lease Assistance Jemez Valley Valley Walatowa High Charter School
Project Description
$41,475
21 Lease Assistance Las Cruces Alma D'Arte Charter High School
Project Description
$95,279
21 Lease Assistance Las Cruces J. Paul Taylor Academy
Project Description
$149,458
21 Lease Assistance Las Cruces La Academia Dolores Huerta
Project Description
$60,530
21 Lease Assistance Las Cruces Las Montanas Charter High School
Project Description
$130,402
21 Lease Assistance Las Cruces Raices Del Saber Xinachtli Com. School
Project Description
$22,792
21 Lease Assistance Las Cruces The New America School
Project Description
$148,337
21 Lease Assistance Moriarty Estancia Valley Classical Academy
Project Description
$440,527
21 Lease Assistance Questa Red River Valley Charter
Project Description
$62,399
21 Lease Assistance Questa Roots & Wings Community School
Project Description
$34,949
21 Lease Assistance Rio Rancho Sandoval Academy Of Bilingual Education
Project Description
$136,380
21 Lease Assistance Rio Rancho The Ask Academy
Project Description
$327,313
21 Lease Assistance Rio Rancho The Ask Academy 4500 Sundt Rd
Project Description
$74,729
21 Lease Assistance Roswell Early College High School
Project Description
$111,191
21 Lease Assistance Roswell Sidney Gutierrez Middle School
Project Description
$30,198
21 Lease Assistance Roswell Sidney Gutierrez
Project Description
$97,148
21 Lease Assistance Santa Fe Monte De Sol Charter School
Project Description
$231,260
21 Lease Assistance Santa Fe New Mexico School For The Arts
Project Description
$172,560
21 Lease Assistance Santa Fe The Academy For Technology & The Classics
Project Description
$204,008
21 Lease Assistance Santa Fe The Masters Program
Project Description
$116,846
21 Lease Assistance Santa Fe Tierra Encantada Charter High School
Project Description
$190,200
21 Lease Assistance Santa Fe Turquoise Trail Charter School
Project Description
$309,004
21 Lease Assistance Silver Aldo Leopold Charter High School
Project Description
$89,639
21 Lease Assistance Socorro Cottonwood Valley Charter School
Project Description
$127,039
21 Lease Assistance Taos Anansi Charter School
Project Description
$146,469
21 Lease Assistance Taos Taos Academy Charter School
Project Description
$175,613
21 Lease Assistance Taos Taos Integrated School Of The Arts
Project Description
$128,908
21 Lease Assistance Taos Taos International Charter School
Project Description
$118,445
21 Lease Assistance Taos Taos Charter School
Project Description
$126,360
21 Lease Assistance Taos Vista Grande High School
Project Description
$65,014
21 Lease Assistance West Las Vegas Rio Gallinas School Elementary School/Middle School
Project Description
$35,645
20 Lease Assistance Albuquerque Albuquerque Charter Academy
Project Description
$133,817
20 Lease Assistance Albuquerque Ace Leadership High School
Project Description
$213,725
20 Lease Assistance Albuquerque Albuquerque Collegiate
Project Description
$26,155
20 Lease Assistance Albuquerque Alb Institute For Math & Science
Project Description
$262,672
20 Lease Assistance Albuquerque Albuquerque School Of Excellence
Project Description
$464,814
20 Lease Assistance Albuquerque Albuquerque Talent Development Secondary
Project Description
$121,061
20 Lease Assistance Albuquerque Alice King Community School
Project Description
$348,611
20 Lease Assistance Albuquerque Altura Preparatory School
Project Description
$42,969
20 Lease Assistance Albuquerque Amy Biehl High School
Project Description
$180,773
20 Lease Assistance Albuquerque Cesar Chavez Community School
Project Description
$151,700
20 Lease Assistance Albuquerque Christine Duncan'S Heritage Academy
Project Description
$291,256
20 Lease Assistance Albuquerque Cien Aguas International School
Project Description
$317,598
20 Lease Assistance Albuquerque Coral Community Charter School
Project Description
$129,847
20 Lease Assistance Albuquerque Corrales International School
Project Description
$182,339
20 Lease Assistance Albuquerque Cottonwood Classical Preparatory School
Project Description
$536,181
20 Lease Assistance Albuquerque Digital Arts And Technology Academy High School
Project Description
$180,853
20 Lease Assistance Albuquerque East Mountain High School
Project Description
$266,783
20 Lease Assistance Albuquerque El Camino Real Academy
Project Description
$235,396
20 Lease Assistance Albuquerque Explore Academy
Project Description
$297,421
20 Lease Assistance Albuquerque Gilbert L. Sena Charter High School
Project Description
$130,776
20 Lease Assistance Albuquerque Gordon Bernell Charter School 2821 4Th Street
Project Description
$138,947
20 Lease Assistance Albuquerque Health Leadership High School
Project Description
$170,008
20 Lease Assistance Albuquerque Horizon Academy West
Project Description
$340,017
20 Lease Assistance Albuquerque La Academia De Esperanza
Project Description
$232,781
20 Lease Assistance Albuquerque La Promesa Early Learning Center Charter School
Project Description
$256,694
20 Lease Assistance Albuquerque Los Puentes Charter School
Project Description
$112,094
20 Lease Assistance Albuquerque Mark Armijo Academy
Project Description
$87,381
20 Lease Assistance Albuquerque Media Arts Collaborative Charter
Project Description
$186,449
20 Lease Assistance Albuquerque Mission Achievement And Success 1255 Old Coors Rd
Project Description
$76,224
20 Lease Assistance Albuquerque Mission Achievement And Success 1718 Yale
Project Description
$697,320
20 Lease Assistance Albuquerque Montessori Of The Rio Grande
Project Description
$161,041
20 Lease Assistance Albuquerque Mountain Mahogany Community School
Project Description
$138,249
20 Lease Assistance Albuquerque Native American Community Academy
Project Description
$209,241
20 Lease Assistance Albuquerque Native American Community Academy Cnm Campus
Project Description
$100,350
20 Lease Assistance Albuquerque New Mexico International School
Project Description
$200,647
20 Lease Assistance Albuquerque North Valley Academy
Project Description
$351,600
20 Lease Assistance Albuquerque Public Academy For Performing Arts
Project Description
$317,972
20 Lease Assistance Albuquerque Robert F. Kennedy Charter High School 4300 Blake Rd. Sw
Project Description
$204,010
20 Lease Assistance Albuquerque Robert F. Kennedy Charter Middle School 1021 Isleta Rd. Sw
Project Description
$51,563
20 Lease Assistance Albuquerque Siembra Leadership High School
Project Description
$89,301
20 Lease Assistance Albuquerque Solare Collegiate Charter School
Project Description
$116,577
20 Lease Assistance Albuquerque South Valley Academy
Project Description
$458,089
20 Lease Assistance Albuquerque Southwest Aeronautics, Mathematics & Science Acad
Project Description
$206,626
20 Lease Assistance Albuquerque Southwest Preparatory Learning Center
Project Description
$138,249
20 Lease Assistance Albuquerque Southwest Secondary Learning Center
Project Description
$173,745
20 Lease Assistance Albuquerque Technology Leadership High School
Project Description
$148,300
20 Lease Assistance Albuquerque The Albuquerque Sign Language Academy
Project Description
$72,113
20 Lease Assistance Albuquerque The Great Academy
Project Description
$97,947
20 Lease Assistance Albuquerque The Montessori Elementary School
Project Description
$322,082
20 Lease Assistance Albuquerque The New America School
Project Description
$208,868
20 Lease Assistance Albuquerque Tierra Adentro
Project Description
$215,593
20 Lease Assistance Albuquerque 21St Century Public Academy
Project Description
$220,077
20 Lease Assistance Albuquerque William W. & Josephine Dorn Charter Community
Project Description
$38,955
20 Lease Assistance Aztec Mosaic Academy Charter School
Project Description
$78,898
20 Lease Assistance Carlsbad Jefferson Montessori Academy
Project Description
$174,866
20 Lease Assistance Cimarron Moreno Valley High School
Project Description
$45,328
20 Lease Assistance Deming Deming Cesar Chavez Charter High School
Project Description
$117,698
20 Lease Assistance Española La Tierra Montessori School Of The Arts And Sciences
Project Description
$54,926
20 Lease Assistance Española Mccurdy Charter School
Project Description
$359,066
20 Lease Assistance Gallup Dzil Ditl'Ooi School Of Empowerment, Action And Perseverance Charter
Project Description
$29,144
20 Lease Assistance Gallup Hozho Academy
Project Description
$102,379
20 Lease Assistance Gallup Middle College High School
Project Description
$27,786
20 Lease Assistance Gallup Six Directions Indigenous School
Project Description
$50,068
20 Lease Assistance Jemez Valley V San Diego Riverside Charter School
Project Description
$45,482
20 Lease Assistance Jemez Valley V Walatowa High Charter School
Project Description
$33,628
20 Lease Assistance Las Cruces Alma D'Arte Charter High School
Project Description
$108,731
20 Lease Assistance Las Cruces J. Paul Taylor Academy
Project Description
$149,458
20 Lease Assistance Las Cruces La Academia Dolores Huerta
Project Description
$89,675
20 Lease Assistance Las Cruces Las Montanas Charter High School
Project Description
$122,929
20 Lease Assistance Las Cruces Raices Del Saber Xinachtli Com. School
Project Description
$44,284
20 Lease Assistance Las Cruces The New America School
Project Description
$152,074
20 Lease Assistance Moriarty Estancia Valley Classical Academy
Project Description
$413,625
20 Lease Assistance Questa Red River Valley Charter
Project Description
$59,970
20 Lease Assistance Questa Roots & Wings Community School
Project Description
$34,949
20 Lease Assistance Rio Rancho Sandoval Academy Of Bilingual Education
Project Description
$102,379
20 Lease Assistance Rio Rancho The Ask Academy
Project Description
$317,225
20 Lease Assistance Rio Rancho The Ask Academy 4500 Sundt Rd
Project Description
$71,366
20 Lease Assistance Roswell Sidney Gutierrez Middle School
Project Description
$49,321
20 Lease Assistance Santa Fe Monte De Sol Charter School
Project Description
$231,094
20 Lease Assistance Santa Fe New Mexico School For The Arts
Project Description
$159,173
20 Lease Assistance Santa Fe The Academy For Technology & The Classics
Project Description
$266,205
20 Lease Assistance Santa Fe The Masters Program
Project Description
$115,463
20 Lease Assistance Santa Fe Tierra Encantada Charter High School
Project Description
$189,957
20 Lease Assistance Santa Fe Turquoise Trail Charter School
Project Description
$349,732
20 Lease Assistance Santa Fe Turquoise Trail Charter School
Project Description
$20,447
20 Lease Assistance Silver Aldo Leopold Charter High School
Project Description
$52,410
20 Lease Assistance Silver Aldo Leopold Charter School Middle School
Project Description
$45,624
20 Lease Assistance Socorro Cottonwood Valley Charter School
Project Description
$127,039
20 Lease Assistance Taos Anansi Charter School
Project Description
$144,601
20 Lease Assistance Taos Taos Academy Charter School
Project Description
$162,162
20 Lease Assistance Taos Taos Integrated School Of The Arts
Project Description
$125,918
20 Lease Assistance Taos Taos International Charter School
Project Description
$100,137
20 Lease Assistance Taos Taos Municipal Charter School
Project Description
$126,398
20 Lease Assistance Taos Vista Grande High School
Project Description
$69,872
20 Lease Assistance West Las Vegas Rio Gallinas School Elementary School/Middle School
Project Description
$35,633
20 Lease Assistance Gallup Chief Manulito Elementary School
Project Description
$8,271
20 Lease Assistance Gallup David Skeet Elementary School
Project Description
$4,740
20 Lease Assistance Gallup Ramah High School
Project Description
$4,463
20 Lease Assistance Los Lunas School Of Dreams Academy
Project Description
$79,692
20 Lease Assistance Aztec Mosaic Academy Charter School
Project Description
$20,400
20 Lease Assistance Albuquerque The International School At Mesa Del Sol
Project Description
$84,972
20 Lease Assistance Albuquerque South Valley Preparatory School
Project Description
$13,680