Awarded Project Database
The Awarded Projects Database logs projects awarded by the PSCOC over time. Standards-Based, Systems-Based, Pre-K Facilities, and Teacher Housing Projects are captured here. Please note that the wNMCI Score, Campus FCI, Total Cost, and State/Local Match categories reflect amounts at the time of award.
| FY | Project Type | District | School | Project Description | wNMCI Ranking | wNMCI Score | Campus FCI | Total Cost | State % | Local % | State Match | Local Match |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 25 | Standards | Silver | Cliff Combined School | Project DescriptionPlanning and design phase funding for the replacement of the existing Cliff Combined School, for 167 students, grades PreK-12, and 50,000 gross square feet (pursuant to the Adequacy Planning Guide). |
11 | 59.37% | 71.11% | $54,108,200 | 37% | 63% | $2,002,003 | $3,408,817 |
| 25 | Standards | Bloomfield |
|
Project DescriptionPlanning and design phase funding for the consolidation and replacement of Central Primary School, Naaba Ani Elementary School and Mesa Alta Junior High School, for 1,100 students, grades 1-8, and 120,587 gross square feet (pursuant to the Adequacy Planning Guide). |
|
|
|
$119,525,800 | 37% | 63% | $4,422,455 | $7,530,125 |
| 25 | Standards | Rio Rancho | Lincoln Middle School | Project DescriptionPlanning funding to complete a classroom use analysis and preliminary program of spaces for renovation of existing spaces. Design and construction funding to complete the replacement of the roof, plumbing, and fire alarm systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility. |
88 | 37.51% | 57.99% | $7,012,116 | 37% | 63% | $1,151,483 | $1,960,633 |
| 25 | Standards | Rio Rancho | Rio Rancho High School | Project DescriptionPlanning funding to complete a comprehensive district-wide high school analysis to include demographics, enrollment projections, capacity/utilization, classroom inventory, attendance boundaries, impacts of new CTE Center, and potential recommendations. Design funding to complete the replacement of the roof, HVAC and fire alarm systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility. |
99 | 36.59% | 71.48% | $44,721,382 | 37% | 63% | $1,121,891 | $1,910,247 |
| 25 | Systems | Grants | Grants High School | Project DescriptionPhase 1: Design funding to complete the replacement of the HVAC, lighting and stucco systems, including incidental systems directly related to the work in this award, for a total of 166,578 GSF: Main Gym, Art Classroom, Main Building 2nd Floor, and Main Building 1st Floor; all other buildings/additions are excluded. The allocation is intended to fully complete the projects, phase or specified purposes. Upon completion of this awarded phase of work, including conformance with all contingencies, out-of-cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
41 | 46% | 59.46% | $15,166,400 | 76% | 24% | $11,526,424 | $3,639,639 |
| 25 | Systems | Alamogordo | Alamogordo High School | Project DescriptionPhase 1: Design funding to complete the replacement of the roofing systems, including incidental systems directly related to the work in this award, for total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes. Upon completion of this awarded phase of work, including conformance with all contingencies, out-of-cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
122 | 34.87% | 74.99% | $14,313,200 | 51% | 49% | $7,299,732 | $7,013,468 |
| 25 | Systems | Hatch Valley | Hatch Valley Middle School | Project DescriptionDesign and construction funding to complete the installation of the roof safety equipment, replacement of the exterior wall stucco, replacement of the exterior doors, and correction of the drainage, including incidental systems directly related to the work in this award, for the total GSF of the school. The allocation is intended to fully complete the projects, phase or specified purposes. |
163 | 31.79% | 63.05% | $585,000 | 88% | 12% | $514,800 | $70,200 |
| 25 | Systems | Eunice | Eunice High School | Project DescriptionConstruction funding to complete replacement of the plumbing system, including incidental systems directly related to the work in this award, for total of 52,047 NSF: Main Building, New Band Room, and Robotics/Computer Buildings only; all other buildings/additions are excluded. The allocation is intended to fully complete the projects, phase or specified purposes. |
169 | 31.48% | 63.97% | $2,080,000 | 37% | 63% | $769,600 | $1,310,400 |
| 25 | Systems | Logan | Logan Combo | Project DescriptionDesign and construction funding to complete replacement of the roofing system and correct drainage, including incidental systems directly related to the work in this award, for total 1,733 NSF: Pre-K Addition only. The allocation is intended to fully complete the projects, phase or specified purposes. |
213 | 28.88% | 61.29% | $344,300 | 37% | 63% | $127,391 | $216,909 |
| 25 | Systems | Silver | Harrison H. Schmitt Elementary School | Project DescriptionConstruction funding to complete replacement of the roofing, HVAC, exhaust, and fire alarm systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility. Conduct a district wide planning study to include capacity / utilization analysis for all town of Silver area schools, demographic analysis, and recommendations based on study findings for efficient use of school facilities. The allocation is intended to fully complete the projects, phase or specified purposes. |
225 | 28.02% | 63.43% | $3,048,300 | 37% | 63% | $1,127,871 | $1,920,429 |
| 25 | Systems | Silver | La Plata Middle School | Project DescriptionConstruction funding to complete the replacement of the fire alarm system, including incidental systems directly related to the work in this award, for the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes. |
250 | 27.21% | 62.58% | $1,121,570 | 37% | 63% | $414,981 | $706,589 |
| 25 | Systems | Clayton |
|
Project DescriptionConstruction funding to complete the replacement of the fire alarm system, including incidental systems directly related to the work in this award, for the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes. |
253 | 27.16% | 61.19% | $432,400 | 37% | 63% | $159,988 | $272,412 |
| 25 | Systems | Ruidoso | Ruidoso High School | Project DescriptionConstruction funding to complete replacement of the stucco, HVAC, lighting and plumbing systems, including incidental systems directly related to the work in this award,for the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes. Upon completion of this awarded phase of work, including conformance with all contingencies, out-of-cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
300 | 24.9% | 65.54% | $16,679,200 | 37% | 63% | $6,171,304 | $10,507,896 |
| 25 | Systems | Cimarron | Demoltion Of District Facilities | Project DescriptionConstruction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned Old Bus Barn. The allocation is intended to fully complete the projects, phase or specified purposes. |
$150,000 | 100% | 0% | $150,000 | $0 | |||
| 25 | Systems | Corona | Demoltion Of District Facilities | Project DescriptionConstruction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned teacher housing unit. The allocation is intended to fully complete the projects, phase or specified purposes. |
$104,000 | 100% | 0% | $104,000 | $0 | |||
| 25 | Systems | Grants | Demoltion Of District Facilities | Project DescriptionConstruction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned old District Office building and old Professional Learning Center. The allocation is intended to fully complete the projects, phase or specified purposes. |
$826,140 | 100% | 0% | $826,140 | $0 | |||
| 25 | Systems | Lovington | Demoltion Of District Facilities | Project DescriptionConstruction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned facility. The allocation is intended to fully complete the projects, phase or specified purposes. |
$192,240 | 100% | 0% | $192,240 | $0 | |||
| 25 | Systems | Tucumcari | Demoltion Of District Facilities | Project DescriptionConstruction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned old Mountain View Elementary School. The allocation is intended to fully complete the project, phase or specified purposes. |
$1,043,950 | 100% | 0% | $1,043,950 | $0 | |||
| 25 | Pre-K | Rio Rancho | Shining Stars Preschool | Project DescriptionPlanning study to determine district-wide options for pre-k facilities and potential transition to full-day program, to include examination of boundaries, enrollment projections, educational programs, a capacity / utilization analysis, and space needs. Design funding for kitchen/cafeteria addition at Shining Stars Preschool, for a total of 3,800 GSF. |
$3,909,000 | 53% | 47% | $254,877 | $226,023 | |||
| 25 | Teacher Housing | Corona | Project DescriptionFunding to complete 2 teacher housing duplexes (4 units), located on district property. |
$744,000 | 53% | 47% | $394,320 | $349,680 | ||||
| 25 | Teacher Housing | Hatch Valley | Project DescriptionFunding to complete five teacher housing units, located on district property. |
$715,000 | 88% | 12% | $629,200 | $85,800 | ||||
| 24 | Standards | Maxwell | Maxwell Combined | Project DescriptionPlanning and design phase funding for the replacement/consolidation of the existing facilities for 117 students, grades K‐12, and 45,000 gross square feet. Verification of the project's enrollment projection and gross square footage must be updated and approved by the PSCOC prior to the construction phase. Project to include 2 teacher housing units. |
17 | 53.98% | 72.98% | $31,385,666 | 81% | 19% | $2,542,238 | $596,328 |
| 24 | Standards | Central | Tse Bit Ai Middle School | Project DescriptionPlanning and design phase funding for the replacement of the existing MS facility for 302 students, grades 7‐8, and 44,266 gross square feet. Verification of the project's enrollment projection and gross square footage (pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior to the construction phase. Project to include 12 teacher housing units. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
24 | 51.12% | 70.07% | $47,065,798 | 63% | 37% | $2,965,145 | $1,741,435 |
| 24 | Standards | Springer | Springer Combined | Project DescriptionPlanning and design phase funding for the replacement/consolidation of the existing ES, MS/HS facilities for 109 students, grades K‐12, and 45,000 gross square feet (pursuant to the Adequacy Planning Guide). Project's enrollment projection and gross square footage will be verified and updated by PSFA, if necessary. Project to include 5 teacher housing units. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
|
|
|
$33,705,503 | 68% | 32% | $2,291,974 | $1,078,576 |
| 24 | Standards | Dexter | Dexter Elementary / Middle School | Project DescriptionPlanning and design phase funding for the consolidation and replacement of the existing ES and MS facility for 569 students, grades Pre‐K‐8, and 78,457 gross square feet (pursuant to the Adequacy Planning Guide). Verification of the project's enrollment projection and gross square footage by PSFA with updates if necessary. Project to include 12 teacher housing units. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
|
|
|
$54,392,878 | 81% | 19% | $4,405,823 | $1,033,465 |
| 24 | Standards | Peñasco | Peñasco Combined | Project DescriptionPlanning and design phase funding for the replacement/consolidation of the existing ES/MS/HS facility for 290 students, grades Pre‐K ‐ 12, and 56,129 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
|
|
|
$50,071,099 | 71% | 29% | $3,555,048 | $1,452,061 |
| 24 | Standards | Bernalillo | Algodones Elementary School | Project DescriptionPlanning and design phase funding for renovation /addition, or replacement based on programming and building systems analysis, for 358 students, grades Pre‐K‐6, and 48,081 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
7 | 67.78% | 79.78% | $22,852,050 | 37% | 63% | $845,526 | $1,439,679 |
| 24 | Standards | Artesia | Roselawn Elementary School | Project DescriptionPlanning and design phase funding for the replacement of the existing Roselawn ES facility for 354 students and 47,611 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
107 | 36.51% | 65.22% | $31,945,966 | 37% | 63% | $1,182,001 | $2,012,596 |
| 24 | Standards | Hagerman | Hagerman Combined | Project DescriptionPlanning and design phase funding for the replacement/consolidation of the existing ES/MS/HS facilities for 375 students, grades Pre‐K‐12, and 69,732 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
100 | 37.17% | 67.19% | $49,962,770 | 75% | 25% | $3,747,208 | $1,249,069 |
| 24 | Standards | Hondo | Hondo Combined | Project DescriptionPlanning and design phase funding for renovation /addition, or replacement based on programming and building systems analysis, for 358 students, grades Pre‐K‐6, and 48,081 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. To include an early work package for new booster pump and refurbishment of the water treatment center. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
64 | 41.64% | 64.07% | $43,137,305 | 67% | 33% | $4,699,199 | $2,314,531 |
| 24 | Standards | Albuquerque | Harrison Middle School | Project DescriptionDesign phase funding for the partial replacement of the existing MS facility for 500 students, grades 6‐8, and 71,120 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
95 | 37.7% | 67.26% | $53,507,936 | 37% | 63% | $989,897 | $1,685,500 |
| 24 | Standards | Albuquerque | Van Buren Middle School | Project DescriptionDesign phase funding for the partial replacement of the existing MS facility for 650 students, grades 6‐8, and 86,304 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
135 | 33.51% | 78.15% | $64,647,761 | 37% | 63% | $1,195,984 | $2,036,404 |
| 24 | Systems | Deming | Columbus Elementary School | Project DescriptionConstruction funding to complete replacement of the HVAC system, including incidental systems directly related to the work in this award, to the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes. |
336 | 22.44% | 37.62% | $3,708,857 | 70% | 30% | $2,596,200 | $1,112,657 |
| 24 | Systems | Deming | Memorial Elementary School | Project DescriptionConstruction funding to complete replacement of the roofing and HVAC systems, including incidental systems directly related to the work in this award, to the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes. |
343 | 22.13% | 47.72% | $2,424,849 | 70% | 30% | $1,697,394 | $727,455 |
| 24 | Systems | Gadsden | Alamo Building, Barracks And Portable | Project DescriptionConstruction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned Alamo Building, PPD Barracks, and the Career Center Portable. The allocation is intended to fully complete the projects, phase or specified purposes. |
$924,457 | 100% | 0% | $924,457 | $0 | |||
| 24 | Systems | Texico | Texico Combined | Project DescriptionDesign and construction funding to complete replacement of the roofing system at the Education Complex, and repair the exterior walls at the Elementary School Building, to include incidental systems directly related to the work in this award. The allocation is intended to fully complete the projects, phase or specified purposes. |
330 | 22.8% | 58.01% | $771,429 | 69% | 31% | $532,286 | $239,143 |
| 24 | Systems | Albuquerque | Atrisco Elementary School | Project DescriptionDesign and construction funding to complete replacement of the roofing systems, including incidental systems directly related to the work in this award, for total of 9,274 NSF: Library/Media Center and Multipurpose Building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose. The allocation is intended to fully complete the project, phase or specified purpose. |
434 | 17.6% | 41.71% | $643,064 | 37% | 63% | $237,934 | $405,130 |
| 24 | Systems | Albuquerque | Longfellow Elementary School | Project DescriptionDesign and construction funding to complete replacement of the roofing and HVAC (boiler/piping) systems, including incidental systems directly related to the work in this award, for total of 44,347 NSF: Main Building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose. |
47 | 45.9% | 81.53% | $4,874,615 | 37% | 63% | $1,803,608 | $3,071,007 |
| 24 | Systems | Albuquerque | Monte Vista Elementary School | Project DescriptionDesign and construction funding to complete replacement of the HVAC system, including incidental systems directly related to the work in this award, for total of 21,649 NSF: Main School Building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose. |
54 | 43.67% | 83.7% | $1,295,000 | 37% | 63% | $479,150 | $815,850 |
| 24 | Systems | Albuquerque | Osuna Elementary School | Project DescriptionDesign and construction funding to complete replacement of the roofing systems, including incidental systems directly related to the work in this award, for total of 7,059 NSF: Library and Mini Gym buildings only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose. |
384 | 20.23% | 55.96% | $505,651 | 37% | 63% | $187,091 | $318,560 |
| 24 | Systems | Albuquerque | S.Y. Jackson Elementary School | Project DescriptionDesign and construction funding to complete replacement of the roofing systems, including incidental systems directly related to the work in this award, for total 50,993 GSF of the facility. The allocation is intended to fully complete the project, phase or specified purpose. |
26 | 50.7% | 77.54% | $3,918,077 | 37% | 63% | $1,449,688 | $2,468,389 |
| 24 | Systems | Albuquerque | Eisenhower Elementary School | Project DescriptionDesign and construction funding to complete replacement of the roofing systems, including incidental systems directly related to the work in this award, for total of 19,516 NSF: New Gym and Band Chorus Building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose. |
78 | 39.39% | 67.67% | $1,931,951 | 37% | 63% | $714,822 | $1,217,129 |
| 24 | Systems | Albuquerque | Taft Middle School | Project DescriptionDesign and construction funding to complete replacement of the roofing and HVAC systems, including incidental systems directly related to the work in this award, for total of 47,647 NSF: PE Building, New School and Classroom Addition buildings only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose. |
21 | 52.86% | 73.32% | $3,868,595 | 37% | 63% | $1,431,380 | $2,437,215 |
| 24 | Systems | Albuquerque | Del Norte High School | Project DescriptionDesign and construction funding to complete replacement of the roofing system, including incidental systems directly related to the work in this award, for total of 26,165 NSF: Performing Arts building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose. |
494 | 14.28% | 42.25% | $946,107 | 37% | 63% | $350,060 | $596,047 |
| 24 | Systems | Albuquerque | Highland High School | Project DescriptionDesign and construction funding to complete replacement of the roofing and HVAC (boiler) systems, including incidental systems directly related to the work in this award, for total of 115,764 NSF: Classroom Addition, Main Building, Math Building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose. |
44 | 46.29% | 74.97% | $2,374,585 | 37% | 63% | $878,596 | $1,495,989 |
| 24 | Systems | Albuquerque | Sandia High School | Project DescriptionDesign and construction funding to complete replacement of the roofing and HVAC systems, including incidental systems directly related to the work in this award, for total of 2,210 NSF: Music Addition only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose. |
71 | 40.66% | 70.53% | $1,090,252 | 37% | 63% | $403,393 | $686,859 |
| 24 | Systems | Albuquerque | Valley High School | Project DescriptionDesign and construction funding to complete replacement of the roofing and HVAC systems, including incidental systems directly related to the work in this award, for total of 18,177 NSF: Media Center building only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purpose. |
75 | 39.84% | 74.3% | $1,477,847 | 37% | 63% | $546,803 | $931,044 |
| 24 | Systems | Clovis | Marshall 6Th Grade Academy | Project DescriptionPhase 1: Design funding to complete replacement of the fire detection/alarm, communication, drain, waste, ventilation systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility. The allocation is intended to fully complete the project, phase or specified purpose. |
256 | 22.8% | 68.91% | $5,532,480 | 63% | 37% | $348,546 | $204,702 |
| 24 | Systems | Clovis | Sandia Elementary School | Project DescriptionPhase 1: Design funding to complete replacement of the exterior windows, exterior doors, and drain, waste, ventilation systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility. The allocation is intended to fully complete the project, phase or specified purpose. The allocation is intended to fully complete the project, phase or specified purpose. |
266 | 26.12% | 71.06% | $1,668,599 | 63% | 37% | $105,122 | $61,738 |
| 24 | Systems | Los Alamos | Los Alamos High School | Project DescriptionDesign and construction funding to complete replacement of the HVAC systems, including incidental systems directly related to the work in this award, for total of 44,787 NSF: D Wing and F Wing only; all other buildings are excluded. The allocation is intended to fully complete the project, phase or specified purposes. |
285 | 24.94% | 61.46% | $593,797 | 37% | 63% | $219,705 | $374,092 |
| 24 | Systems | West Las Vegas | Old Luis Armijo Building | Project DescriptionConstruction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned Old Luis Armijo Building. The allocation is intended to fully complete the project, phase or specified purposes. |
$386,586 | 100% | 0% | $386,586 | $0 | |||
| 24 | Systems | West Las Vegas | Luis Armijo Elementary School | Project DescriptionPhase 1: Planning and Design funding to include a structural analysis, to determine potential scope of project: potential repairs of foundation / slab, replacement of the exterior windows, exterior doors, electrical system / LED lighting, and fire alarm, including incidental systems directly related to the work in this award, for the total GSF of the school facility. The allocation is intended to fully complete the project, phase or specified purpose. |
268 | 25.89% | 68.92% | $2,896,343 | 76% | 24% | $220,122 | $69,512 |
| 24 | Systems | Española | Old Head Start Building | Project DescriptionConstruction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/drainage modifications at the abandoned Old Head Start Building. The allocation is intended to fully complete the project, phase or specified purposes. |
$71,429 | 100% | 0% | $71,429 | $0 | |||
| 24 | Systems | Cimarron | Cimarron Elementary / Middle School | Project DescriptionSingle phase: Design and construction funding to complete replacement of the fire alarm system, including incidental systems directly related to the work in this award, for the total GSF of the school facility (excluding the Original Building). The allocation is intended to fully complete the project, phase or specified purposes. |
253 | 26.98% | 60.74% | $525,657 | 37% | 63% | $194,493 | $331,164 |
| 24 | Systems | Melrose | Melrose Combined | Project DescriptionSingle phase: Planning, Design and Construction funding for fire alarm and waste and water infrastructure systems, including incidental systems directly related to the work in this award, for the total GSF of the school facility (with the exclusion of the athletic locker rooms). The allocation is intended to fully complete the project, phase or specified purpose. |
62 | 41.9% | 76.51% | $3,000,000 | 80% | 20% | $2,400,000 | $600,000 |
| 24 | Systems | Clayton | Demolition | Project DescriptionSingle phase: construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection, relocation of the boiler system, demolition of facility, and final grading/drainage modifications at the abandoned Old Junior High Building. The allocation is intended to fully complete the project, phase or specified purposes. |
$2,456,250 | 100% | 0% | $2,456,250 | $0 | |||
| 24 | Systems | Albuquerque | Demolition | Project DescriptionSingle phase: construction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facility, and final grading/ drainage modifications at the abandoned Taft Middle School Administration Building. The allocation is intended to fully complete the project, phase or specified purposes. |
$376,446 | 100% | 0% | $376,446 | $0 | |||
| 24 | Pre-K | Cuba | Cuba Elementary School | Project DescriptionPlanning and design phase funding for a two classroom addition and to renovate the existing pre‐K classroom and restrooms at Cuba Elementary School (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
$1,912,214 | 54% | 46% | $103,260 | $87,962 | |||
| 24 | Pre-K | Albuquerque | Duranes Elementary School | Project DescriptionDesign phase funding for the partial renovation and partial replacement of Duranes ES to create the Duranes Early Childhood Center, for 240 students and 50,879 gross square feet (pursuant to the Adequacy Planning Guide). Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
$31,268,324 | 53% | 47% | $828,611 | $734,806 | |||
| 24 | Teacher Housing | Central | Project DescriptionDesign and construction funding to complete 4 teacher housing units, located at the existing teacher housing development near district office. The allocation is intended to fully complete the project, phase or specified purposes. |
$2,200,000 | 63% | 37% | $1,386,000 | $814,000 | ||||
| 24 | Teacher Housing | Cuba | Project DescriptionDesign and construction funding to complete 2 teacher housing units, located at the existing teacher housing development. The allocation is intended to fully complete the project, phase or specified purposes. |
$928,350 | 54% | 46% | $501,309 | $427,041 | ||||
| 24 | Teacher Housing | House | Project DescriptionDesign and construction funding to complete 3 teacher housing units, located on district property. The allocation is intended to fully complete the project, phase or specified purposes. |
$531,960 | 81% | 19% | $430,888 | $101,072 | ||||
| 23 | Standards | Gallup | Gallup Central High School | Project DescriptionPlanning and design phase funding for the replacement of the existing facility, for 204 students, grades 6‐12, and 20,553 gross square feet. Enrollment projections, programming for the specialized alternative educational program, and gross square footage (pursuant to the Adequacy Planning Guide) must be updated in the planning phase and approved by the PSCOC, prior to the completion of the planning and design phase. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
1 | 1.22% | 77.4% | $10,981,468 | 82% | 18% | $900,480 | $197,666 |
| 23 | Standards | State Charter | Albuquerque Sign Language Academy | Project DescriptionConstruction phase funding for the replacement of the existing facility, for 200 students, grades K‐12, and 47,000 gross square feet. Release of construction funding contingent upon the finalization of the land lease, local share funding, and if necessary, modification of the contract to reflect all necessary statutory requirements, pursuant to the requirements of the PSCOC. |
5 | 64.81% | 46.62% | $24,289,264 | 11% | 89% | $21,289,264 | $3,000,000 |
| 23 | Standards | Gallup | Thoreau High School | Project DescriptionPlanning and design phase funding for the replacement of the existing facility, for 477 students, grades 9‐12, and 84,350 gross square feet. Enrollment projections and gross square footage (not to exceed the maximum gross square footage pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior to the completion of the planning and design phase. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
27 | 45.57% | 77.4% | $46,603,375 | 82% | 18% | $3,821,477 | $838,861 |
| 23 | Standards | Farmington | Heights Middle School | Project DescriptionPlanning and design phase funding for the replacement of the existing facility, for 680 students, grades 6‐8, and 89,001 gross square feet. Enrollment projections and gross square footage (not to exceed the maximum gross square footage (pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior to the completion of the planning and design phase. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
65 | 39.86% | 67.12% | $46,280,520 | 37% | 63% | $1,712,379 | $2,915,673 |
| 23 | Standards | Farmington | Mesa Verde Elementary School | Project DescriptionPlanning and design phase funding for the replacement of the existing facility, for 447 students, grades K‐5, and 58,159 gross square feet. Enrollment projections and gross square footage (not to exceed the maximum gross square footage pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior to the completion of the planning and design phase. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
59 | 40.95% | 74.46% | $28,352,513 | 37% | 63% | $1,049,043 | $1,786,208 |
| 23 | Standards | Gallup | David Skeet Elementary School | Project DescriptionPlanning and design phase funding for the replacement of the existing facility, for 224 students, grades K‐5, and 31,499 gross square feet. Enrollment projections and gross square footage (not to exceed the maximum gross square footage pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior to the completion of the planning and design phase. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
93 | 37.24% | 72.21% | $21,603,198 | 82% | 18% | $1,771,462 | $388,858 |
| 23 | Standards | Pojoaque | Pojoaque Middle School | Project DescriptionPlanning and design phase funding for the replacement of the existing facility (excluding the gym) for 396 students, grades 6‐8, and 53,725 gross square feet. Renovation to include the existing gymnasium and locker rooms. Enrollment projections and gross square footage (not to exceed the maximum gross square footage pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior to the construction phase. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
6 | 61.16% | 70.72% | $32,943,671 | 65% | 35% | $2,090,939 | $1,203,428 |
| 23 | Standards | Estancia | Estancia Elementary School | Project DescriptionPlanning and design phase funding for consolidation of the facility, for 301 students, grades Pre‐K‐6. Project to include the renovation of the existing facility and a gymnasium addition with additional classrooms and spaces as required. Enrollment projections and gross square footage must be updated and approved by the PSCOC prior to the construction phase. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐ofcycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
63 | 36.9% | 68.66% | $14,812,486 | 49% | 51% | $662,256 | $818,993 |
| 23 | Systems | Gallup | Indian Hills Elementary School | Project DescriptionDesign/construction funding to complete replacement / upgrade of the Roof, Exterior Walls, Fire Alarm and Site Drainage systems, including incidental systems directly related to the work in this award, to the total 50,955 GSF of the school facility. |
336 | 22.9% | 47.64% | $4,238,824 | 82% | 18% | $3,475,836 | $762,988 |
| 23 | Systems | Moriarty | Moriarty High School East Complex Bldg. | Project DescriptionConstruction funding to complete site survey, abatement of hazardous materials (if needed), utility disconnection (if needed), demolition of facilities, and final grading/drainage modifications at the abandoned Moriarty HS East Complex Building . |
$642,857 | 60% | 40% | $385,714 | $257,143 | |||
| 23 | Systems | Gadsden | Santa Teresa Middle School | Project DescriptionDesign/construction funding to complete replacement of the Fire Alarm system, including incidental systems directly related to the work in this award, to the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes. |
18 | 47.83% | 62.6% | $553,523 | 64% | 36% | $354,255 | $199,268 |
| 23 | Systems | Gadsden | Loma Linda Elementary School | Project DescriptionDesign/construction funding to complete replacement of the Fire Alarm system, including incidental systems directly related to the work in this award, to the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes. |
61 | 40.52% | 59.9% | $202,616 | 64% | 36% | $129,674 | $72,942 |
| 23 | Systems | Gadsden | Sunland Park Elementary School | Project DescriptionDesign/construction funding to complete replacement of the Fire Alarm system, including incidental systems directly related to the work in this award, to the total GSF of the school facility. The allocation is intended to fully complete the projects, phase or specified purposes. |
295 | 25.01% | 51.75% | $303,891 | 64% | 36% | $194,490 | $109,401 |
| 23 | Pre-K | Farmington | Preschool Academy East | Project DescriptionPlanning and design phase funding for the replacement of the existing facility, for 720 students, Pre‐K, and 51,929 gross square feet. Enrollment projections and gross square footage (pursuant to the Adequacy Planning Guide) must be updated and approved by the PSCOC prior to the completion of the planning and design phase. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐of‐cycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
$27,003,080 | 37% | 63% | $999,114 | $1,701,194 | |||
| 23 | Pre-K | State Charter | New Mexico School For The Blind And Visually Impaired | Project DescriptionPlanning and design phase funding for potential future projects, to include: bus loop and parking lot improvements, kitchen and multipurpose addition, Pre‐K classroom addition, and potential expansion for additional grade levels. Each allocation is intended to fully complete the project, phase or specified purpose. Upon completion of this awarded phase of work, including conformance with all contingencies, out‐ofcycle funding for future phases of work may be considered at any upcoming regularly scheduled PSCOC meeting. |
$300,000 | 50% | 50% | $150,000 | $150,000 | |||
| 22 | Standards | Gadsden | Gadsden Middle School | Project DescriptionPlanning phase funding to complete a feasibility study to determine options to renovate or replace the existing middle school buildings, with demolition of excess square footage, including a cost/benefit and building systems analysis, followed by a campus master plan and educational specification for grade levels 7th and 8th. |
17 | 48.16% | 56.44% | $47,469,936 | 70% | 30% | $25,300 | $49,700 |
| 22 | Standards | Gadsden | Chaparral Middle School | Project DescriptionPlanning phase funding to complete a feasibility study to determine options to renovate or replace the existing middle school buildings, with demolition of excess square footage, including a cost/benefit and building systems analysis, followed by a campus master plan and educational specification for grade levels 7th and 8th. |
174 | 32.49% | 70.65% | $38,729,929 | 70% | 30% | $52,500 | $22,500 |
| 22 | Standards | Los Alamos | Chamisa Elementary School | Project DescriptionDesign phase funding for the replacement of the existing facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design enrollment of 292 students, grades PreK-6. |
78 | 38.67% | 75.41% | $20,459,743 | 20% | 80% | $409,195 | $1,636,779 |
| 22 | Standards | Los Alamos | Pinon Elementary School | Project DescriptionDesign phase funding for the replacement of the existing facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design enrollment of 378 students, grades PreK-6th. |
94 | 37.09% | 67.5% | $25,070,571 | 20% | 80% | $501,411 | $2,005,646 |
| 22 | Standards | Los Lunas | Ann Parish Elementary School | Project DescriptionPlanning phase funding to complete a feasibility study to determine options to renovate or replace the existing elementary school buildings, including a cost/benefit and building systems analysis, followed by a campus master plan and educational specification for grade levels K-6. |
87 | 37.58% | 76.65% | $30,845,000 | 56% | 44% | $42,000 | $33,000 |
| 22 | Standards | Mosquero | Mosquero Combined | Project DescriptionDesign phase funding deferred, pending completion of planning phase work funded by the district, including a feasibility study with cost/benefit and building systems analysis to determine options to renovate or replace the 1935 original building. |
39 | 43.07% | 63.7% | $20,570,514 | 6% | 94% | $54,923 | $2,002,128 |
| 22 | Systems | Raton | Longfellow Elementary School | Project DescriptionPlanning and Design/Construction funding to complete district wide planning study to determine campus consolidation options and systems upgrades at the existing elementary school to the maximum gross square footage pursuant to the Adequacy Planning Guide for 26,211 gross square feet. Systems eligible for state funding are limited to: Fire Alarm and Boiler, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
6 | 59.34% | 68.35% | $360,179 | 45% | 55% | $162,081 | $198,098 |
| 22 | Systems | House | House Combined | Project DescriptionDesign/Construction funding to complete abatement of lead/asbestos, demolition of 2,160 gross square feet of the 1952 building, and grading of site. Systems eligible for state funding are limited to: Demolition, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
89 | 37.51% | 74.04% | $142,858 | 52% | 48% | $74,286 | $68,572 |
| 22 | Systems | Portales | Portales High School | Project DescriptionPlanning phase to include and Design/Construction funding to complete district wide planning study to determine campus consolidation options and systems upgrades at the existing elementary school to the maximum gross square footage pursuant to the Adequacy Planning Guide for 26,211 gross square feet. Systems eligible for state funding are limited to: Fire Alarm and Boiler, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
100 | 36.85% | 71.83% | $0 | 61% | 39% | $0 | $0 |
| 22 | Systems | Floyd | Floyd Combined School | Project DescriptionDesign funding to complete evaluation of existing heating and cooling equipment and replacement of Rooftop units limited to 40,502 GSF. Systems eligible for state funding are limited to: Rooftop heating and cooling units, above educational spaces as identified in the district's application. Upon completion of the design phase, the district may return to the PSCOC for the next out-of-cycle funding phase to include an update to the total estimated project cost. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
143 | 33.74% | 70.59% | $67,002 | 86% | 14% | $57,622 | $9,380 |
| 22 | Systems | Raton | Raton High School | Project DescriptionDesign/Construction funding to complete replacement of Fire Alarm, Boiler and Waterline limited to 66,179 GSF. Systems eligible for state funding are limited to: Fire Alarm, Boiler and Waterline as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
152 | 33.17% | 68.77% | $622,976 | 45% | 55% | $280,339 | $342,637 |
| 22 | Systems | Truth or Consequences | Sierra Elementary School | Project DescriptionDesign funding to complete replacement of Roof, HVAC and Fire Alarm systems limited to 21,890 GSF. Systems eligible for state funding are limited to: Roof, HVAC, and Fire Alarm systems as identified in the district's application. Upon completion of the design phase, the district may return to the PSCOC for the next out-of-cycle funding phase to include an update to the total estimated project cost. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
199 | 30.66% | 65.45% | $178,083 | 15% | 85% | $26,712 | $151,371 |
| 22 | Systems | Raton | Raton Intermediate School | Project DescriptionPlanning and Design/Construction funding to complete replacement of Fire Alarm, Boiler, and Plant controls systems limited to 30,194 GSF. Systems eligible for state funding are limited to: Fire Alarm, Boiler, and Plant controls, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
204 | 30.39% | 65.77% | $306,504 | 45% | 55% | $137,927 | $168,577 |
| 22 | Systems | Portales | James Elementary School | Project DescriptionPlanning funding to complete a district-wide planning study and Design phase funding to complete an evaluation of the Roof structure, Site Drainage corrections and is limited to 45,291 GSF. Systems eligible for state funding are limited to: Site Drainage and Roof Replacement identified in the district's application. Upon completion of the design phase, the district may return to the PSCOC for the next out-of-cycle funding phase to include an update to the total estimated project cost. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
276 | 26.23% | 73.44% | $1,959,517 | 61% | 39% | $96,862 | $61,928 |
| 22 | Systems | Tularosa | Tularosa Intermediate School | Project DescriptionDesign/Construction funding to complete replacement of Rooftop heating and cooling units limited to 39,133 GSF. Systems eligible for state funding are limited to: Rooftop heating and cooling units, above educational spaces as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
285 | 25.89% | 57.88% | $588,984 | 67% | 33% | $394,619 | $194,365 |
| 22 | Systems | Raton | Columbian Elementary School | Project DescriptionDesign/Construction funding to complete site survey, abatement of lead/asbestos, demolition, and final grading/drainage modifications limited to 23,705 GSF of the 1940 building, and drainage/grading of adjacent site. Systems eligible for state funding are limited to: Demolition, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
$857,889 | 45% | 55% | $386,050 | $471,839 | |||
| 22 | Systems | Las Vegas City | Paul D. Henry Elementary School | Project DescriptionDesign/Construction funding to complete site survey, abatement of lead/asbestos, demolition, and final grading/drainage modifications limited to 32,591 GSF of the 1954 building, and drainage/grading of adjacent site. Systems eligible for state funding are limited to: Demolition, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
$1,100,000 | 35% | 65% | $385,000 | $715,000 | |||
| 22 | Pre-K | Deming | My Little School | Project DescriptionPlanning and design funding to renovate the existing classrooms, restrooms and associated spaces, and to construct a classroom and multipurpose room addition. District may return for out‐of‐cycle construction funding. Construction/renovation shall be pursuant to the Adequacy Planning Guide (6.27.30 NMAC). |
$4,384,357 | 61% | 39% | $267,446 | $170,990 | |||
| 22 | Pre-K | Gadsden | Chaparral On Track Center | Project DescriptionPlanning and design funding to construct a 4 Pre‐K classroom addition, including restrooms, at the existing Chaparral On Track Center. District may return for out‐of‐cycle construction funding. Construction shall be pursuant to the Adequacy Planning Guide (6.27.30 NMAC). |
$2,614,286 | 70% | 30% | $183,000 | $78,429 | |||
| 22 | Pre-K | Gadsden | New Riverside On Track Center | Project DescriptionPlanning and design funding to construct an addition to include: 8 Pre‐K classrooms, restrooms and associated spaces, at the new Riverside On Track Center. District may return for out‐of‐cycle construction funding. Construction shall be pursuant to the Adequacy Planning Guide (6.27.30 NMAC). |
$5,698,857 | 70% | 30% | $398,920 | $170,966 | |||
| 22 | Pre-K | State Charter | New Mexico School For The Deaf ‐ Albuquerque Preschool | Project DescriptionPlanning and design funding to renovate portions of the existing facility, and to construct an addition at the existing New Mexico School for the Deaf ‐ Albuquerque Preschool campus. The project shall start with a planning phase to evaluate needs and potential project scope. District may return for out‐of‐cycle construction funding. Construction shall be pursuant to the Adequacy Planning Guide (6.27.30 NMAC). |
$2,800,000 | 50% | 50% | $140,000 | $140,000 | |||
| 22 | Pre-K | State Charter | School Of Dreams Academy | Project DescriptionPlanning and design funding to construct an addition to include: 5 Pre‐K classrooms, restrooms and associated spaces, at the School of Dreams Academy (state chartered charter school). District may return for out‐of‐cycle construction funding. Construction shall be pursuant to the Adequacy Planning Guide (6.27.30 NMAC). |
$4,528,571 | 56% | 44% | $84,100 | $368,757 | |||
| 21 | Standards | Carrizozo | Carrizozo Combined School | Project DescriptionPlanning phase funding to complete a feasibility study to determine options to renovate or replace the existing school buildings on the combined campus, with demolition of excess square footage, including a building systems analysis, followed by a campus master plan and educational specification for the new grades Pre-K-12 campus. Upon completion, the district may return to the PSCOC for the next out-of-cycle funding phase to include approval of the design enrollment, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total estimated project cost. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project. |
$20,210,393 | 0% | 100% | $0 | $75,000 | |||
| 21 | Standards | Gallup | Crownpoint High School | Project DescriptionPlanning phase funding to complete a comprehensive campus master plan and educational specification to include Crownpoint middle and high schools, to maximize utilization of the school facilities, including sharing of spaces. The campus master plan will define the final configuration of the grades 6-12 campus, including construction phases and site elements. Upon completion, the district may return to the PSCOC for the next out-of-cycle funding phase to include approval of the design enrollment, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total estimated project cost. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project. |
$33,712,963 | 81% | 19% | $60,750 | $14,250 | |||
| 21 | Standards | Gallup | Gallup High School | Project DescriptionPlanning phase funding to complete a structural investigation and feasibility study to determine options to renovate or replace the existing high school buildings, with demolition of excess square footage, including a cost/benefit analysis to stabilize the buildings and a building systems analysis, followed by a campus master plan and educational specification for the school, grades 9-12. Campus master plan will define the phasing strategy for the design and construction phases, including a sequencing plan to move students as the work progresses and an outline scope of work for each design and construction phase. Upon completion, the district may return to the PSCOC for the next out-of-cycle funding phase to include approval of the design enrollment, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total project cost estimate. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project. |
$71,780,729 | 81% | 19% | $101,250 | $23,750 | |||
| 21 | Standards | Gallup | Navajo Pine High School | Project DescriptionPlanning phase funding to complete a comprehensive campus master plan and educational specification to include Navajo middle and high schools, to maximize utilization of the school facilities, including sharing of spaces. The campus master plan will define the final configuration of the grades 6-12 campus, including construction phases and site elements. Upon completion, the district may return to the PSCOC for the next out-of-cycle funding phase to include approval of the design enrollment, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total estimated project cost. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project. |
$22,631,511 | 81% | 19% | $60,750 | $14,250 | |||
| 21 | Standards | Grants | Mesa View Elementary School | Project DescriptionPlanning and design phase funding for the replacement of the existing facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design enrollment of 474 students, grades Pre-K-6. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project |
$24,270,571 | 74% | 26% | $1,796,022 | $631,035 | |||
| 21 | Standards | Hobbs | Heizer Middle School | Project DescriptionPlanning funding to complete Phase I planning to include district-wide enrollment and boundary study, updated 5-year middle school enrollment projections and student location/geocode analysis. Based on the results of this initial Phase I planning work, the district may return to PSCOC for approval of the project scope for a new middle school campus and/or renovations to Heizer MS. Phase II planning work for a new middle school will include educational specifications. Upon completion of the planning phase, the district may return to the PSCOC for the next out-of-cycle design funding phase to include approval of enrollment for the new middle school, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total project cost estimate. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project. |
$52,867,500 | 0% | 100% | $0 | $75,000 | |||
| 21 | Standards | Zuni |
|
Project DescriptionPlanning phase funding to complete a feasibility study to determine options to renovate or replace the existing high school buildings, with demolition of excess square footage, including a cost/benefit and building systems analysis, followed by a campus master plan and educational specification for the new grades 6-12 campus on the high school site, including new teacher housing units. Campus master plan will define the phasing strategy for the design and construction phases, including a sequencing plan to move students as the work progresses and an outline scope of work for each design and construction phase. Upon completion, the district may return to the PSCOC for the next out-of-cycle funding phase to include approval of the design enrollment, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total estimated project cost. PSCOC may make an award to fund a functional phase of a project without committing to funding future phases of proposed projects. The Council shall reevaluate each phase of a project and the capacity of the Public School Capital Outlay Fund before making an award for a subsequent phase of a project. |
$51,974,571 | 100% | 0% | $75,000 | $0 | |||
| 21 | Systems | Las Cruces | Tombaugh Elementary School | Project DescriptionDesign phase funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 73,929 gross square feet. Systems eligible for state funding are limited to: Roof and HVAC, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. Upon completion of the design phase, the district may return to the PSCOC for the next out-of_x0002_cycle funding phase to include an update to the total estimated project cos |
$3,310,965 | 50% | 50% | $165,548 | $165,548 | |||
| 21 | Systems | Clovis | Clovis High School | Project DescriptionDesign and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 15,455 gross square feet (partial campus). Systems eligible for state funding are limited to: Roof and HVAC, as identified in the district's application. Prior to receiving an award, the district shall submit a written commitment to replace the remainder of the roofing adjacent to this work area at its own cost. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
$1,404,966 | 69% | 31% | $967,357 | $434,609 | |||
| 21 | Systems | Las Cruces | Onate High School | Project DescriptionDesign and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 33,400 gross square feet (partial campus). Systems eligible for state funding are limited to: HVAC, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. Upon completion of the design phase, the district may return to the PSCOC for the next out-of-cycle funding phase to include an update to the total estimated project cost. |
$2,797,237 | 50% | 50% | $139,862 | $139,862 | |||
| 21 | Systems | Gallup | Tohatchi Middle School | Project DescriptionDesign and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 34,839 gross square feet (partial campus). Systems eligible for state funding are limited to: Roof, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
$995,400 | 78.11% | 21.89% | $777,474 | $217,926 | |||
| 21 | Systems | Hatch Valley |
|
Project DescriptionDesign and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 10,061 gross square feet. Systems eligible for state funding are limited to: Roof and HVAC, as identified in the district's application. Costs for any work that may be required for other associated building systems will be the sole responsibility of the district. |
$259,290 | 85% | 15% | $220,397 | $38,894 | |||
| 21 | Pre-K | Hatch Valley | Garfield Elementary School | Project DescriptionDesign and construction funding to renovate 5 existing Pre-K classrooms and the existing restrooms. Construction/renovation shall be pursuant to the Adequacy Planning Guide (6.27.30 NMAC). |
$474,765 | 85% | 15% | $403,550 | $71,215 | |||
| 21 | Pre-K | Los Lunas | Peralta Elementary School | Project DescriptionPlanning, design, and construction phase funding to construct 8 Pre-K classrooms at the new Peralta Elementary School campus to create an east-side Pre-K center in the district. Construction shall be pursuant to the Adequacy Planning Guide (6.27.30 NMAC). |
$3,565,714 | 63% | 37% | $2,246,400 | $1,319,314 | |||
| 21 | Pre-K | Los Lunas | Raymond Gabaldon Elementary School | Project DescriptionPlanning, design, and construction phase funding to renovate 8 Pre-K classrooms at Gabaldon Elementary School to create a west_x0002_side Pre-K center in the district. The planning phase shall include a district-wide boundary study and updated enrollment projections. The design phase shall include a campus master plan to define how the renovated Pre-K center will be integrated into the long-term configuration of the campus at Gabaldon Elementary School. Construction shall be pursuant to the Adequacy Planning Guide (6.27.30 NMAC). |
$4,453,429 | 63% | 37% | $2,805,660 | $1,647,769 | |||
| 20 | Standards | Alamogordo | Chaparral Middle School | Project DescriptionPlanning and design, beginning with an educational specification, for a replacement facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design capacity for 658 students, grades 6-8. |
1 | 78.51% | 68.35% | $36,045,921 | 60% | 40% | $2,162,755 | $1,441,837 |
| 20 | Standards | Central | Newcomb Elementary School | Project DescriptionFunding to complete comprehensive campus master plan and educational specification to include the Newcomb ES, Newcomb MS, and Newcomb HS, to maximize utilization of school facilities. Upon completion, district may return to the PSCOC for the next out-of-cycle funding phase to include approval of location of the new ES facility, design capacity, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total project cost estimate. |
2 | 69.3% | 69.84% | $24,380,179 | 60% | 40% | $45,000 | $30,000 |
| 20 | Standards | Roswell | Mountain View Middle School | Project DescriptionPlanning and design, beginning with an educational specification, for renovation/replacement of the existing facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design capacity for 525 students, grades 6-8. |
3 | 63.15% | 78.35% | $26,582,892 | 68% | 32% | $1,807,637 | $850,653 |
| 20 | Standards | Hobbs | Southern Heights Elementary School | Project DescriptionPlanning and design for replacement of the existing facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design capacity for 500 students, grades 3&4-Year-Old DD-5. |
5 | 54.76% | 65.39% | $29,901,457 | 52% | 48% | $1,554,876 | $1,435,270 |
| 20 | Standards | Las Cruces | Columbia Elementary School | Project DescriptionFunding to complete district-wide educational specifications to include updated enrollment projections. Upon completion, district may return to the PSCOC for review of the educational specifications and consideration for a next out-of-cycle funding phase to complete a feasibility/engineering study of the existing building. Design capacity and options to renovate or replace the existing building are deferred pending the outcome of the planning phase(s) of this project. |
7 | 53.54% | 45.49% | $30,697,527 | 57% | 43% | $42,750 | $32,250 |
| 20 | Standards | Roswell | Washington Avenue Elementary School | Project DescriptionFunding to complete educational specification/ feasibility study to determine options to maximize utilization of the current school facility and to ensure that the project will accommodate the educational program of the projected enrollment of 430 students, grades K-5. Upon completion, district may return to the PSCOC for the next out-of-cycle funding phase to include approval of options, design capacity, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total project cost estimate. |
12 | 51.58% | 72.68% | $9,596,836 | 68% | 32% | $51,000 | $24,000 |
| 20 | Standards | Des Moines | Des Moines Combined School | Project DescriptionAward consideration is deferred pending the outcome of the structural study and planning work currently underway. Upon completion, district may return to the PSCOC for next out-of-cycle funding phase to include approval of options, design capacity, maximum gross square footage pursuant to the Adequacy Planning Guide, and an update to the total project cost estimate. |
46 | 42.98% | 57.24% | $10,331,490 | 14% | 86% | $0 | $0 |
| 20 | Standards | Grants | Bluewater Elementary School | Project DescriptionPlanning and design for renovation/replacement of the existing facility to the maximum gross square footage pursuant to the Adequacy Planning Guide, for a design capacity of 95 students, grades K-6. |
52 | 41.96% | 82.78% | $7,306,951 | 75% | 25% | $548,021 | $182,674 |
| 20 | Standards | Clovis | Barry Elementary School | Project DescriptionPlanning and design for the project, construction funding to complete roofing and HVAC replacement of $1.8 million, and construction funding to complete the classroom addition for a design capacity of 400 students, grades K-5. The district may return to the PSCOC for out-of_x0002_cycle funding for the balance of the award for construction of the interior renovations and site work. |
72 | 39.64% | 73.28% | $883,586 | 68% | 32% | $2,797,084 | $1,316,275 |
| 20 | Systems | Roswell | Roswell High School | Project DescriptionPlanning, design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 165,917 square feet (partial campus). Systems are limited to: Fire Detection/Alarm, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. |
6 | 53.65% | 70.96% | $345,000 | 68% | 32% | $234,600 | $110,400 |
| 20 | Systems | Gallup | Gallup High School | Project DescriptionPlanning, design and construction funding to complete systems upgrades at the existing site pursuant to the Adequacy Planning Guide. Systems are limited to: Parking Lots and Walkways, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The District must provide quarterly updates to the PSCOC on its maintenance status until an updated FMAR score to a minimum of 65% at this school is achieved. The District's request for local match reduction is deferred pending a final statement of financial position. |
29 | 46.29% | 57.96% | $4,425,055 | 80% | 20% | $3,540,044 | $885,011 |
| 20 | Systems | Clovis | Clovis High School | Project DescriptionPlanning and design funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 177,692 square feet (partial campus). Systems are limited to: Exterior Windows, Exterior Doors, and Fire Detection/Alarm, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. Upon completion, district may return to the PSCOC for the next out-of-cycle funding phase. |
102 | 37.11% | 73.44% | $803,504 | 68% | 32% | $54,638 | $25,712 |
| 20 | Systems | Gallup | Crownpoint Middle School | Project DescriptionPlanning, design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 32,234 square feet (partial campus). Systems are limited to: Roof, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The District must provide quarterly updates to the PSCOC on its maintenance status until an updated FMAR score to a minimum of 65% at this school is achieved. The District's request for local match reduction is deferred pending a final statement of financial position. |
124 | 35.46% | 61.63% | $1,775,200 | 80% | 20% | $1,420,160 | $355,040 |
| 20 | Systems | San Jon | San Jon Combined School | Project DescriptionPlanning and design funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 35,317 square feet (partial campus). Systems are limited to: Fencing, Parking Lots, Playground Equipment, Site Drainage, Walkways, Roof, Ceiling Finishes, Floor Finishes, Heat Generating Systems, and Fire Detection/Alarm, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. Upon completion, district may return to the PSCOC for the next out-of-cycle funding phase. |
210 | 29.72% | 61.14% | $2,394,286 | 69% | 31% | $165,206 | $74,223 |
| 20 | Systems | Gallup | Tse Yi Gai High School | Project DescriptionPlanning, design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 28,913 square feet (partial campus). Systems are limited to: Roof, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The District must provide quarterly updates to the PSCOC on its maintenance status until an updated FMAR score to a minimum of 65% at this school is achieved. The District's request for local match reduction is deferred pending a final statement of financial position. |
213 | 29.54% | 45.16% | $526,671 | 80% | 20% | $421,336 | $105,334 |
| 20 | Systems | Hobbs | Hobbs High School | Project DescriptionPlanning and design funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 20,570 square feet (partial campus). Systems are limited to: Heat Generating Systems, Cooling Generating Systems, Air Distribution Systems, Exhaust Ventilation System, and HVAC Controls, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. Upon completion, district may return to the PSCOC for the next out-of-cycle funding phase. |
215 | 29.48% | 53.21% | $571,692 | 52% | 48% | $29,728 | $27,441 |
| 20 | Systems | Portales | Brown Early Childhood Center | Project DescriptionPlanning and design funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 19,079 square feet (partial campus). Systems are limited to: Parking Lots, Playground Equipment, Site Lighting, Site Drainage, Site Utilities, Site Domestic Water Utility, Landscaping, Walkways, Exterior Walls, Exterior Windows, Exterior Doors, Ceiling Finishes, Floor Finishes, Wall Finishes, Foundation/Slab/Structure, Interior Doors, Interior Walls (and Partitions), Air Distribution Systems, Exhaust Ventilation System, Rooftop Unitary AC, HVAC Controls, Fire Sprinkler, Main Power/Emergency, Lighting/Branch Circuits, Plumbing Fixtures, Water Distribution, Drain, Waste, and Vent, Fire Detection/Alarm, Demolition of Portion of Occupied Building, and Security Systems (Excludes security cameras, handheld radios, automatic vehicle gates), as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. Upon completion, district may return to the PSCOC for the next out-of-cycle funding phase. |
239 | 28.19% | 61.12% | $4,344,223 | 69% | 31% | $299,751 | $134,671 |
| 20 | Systems | Las Cruces | Valley View Elementary School | Project DescriptionPlanning, design and construction funding to complete systems upgrades at the existing facilities to the maximum gross square footage pursuant to the Adequacy Planning Guide for 52,248 square feet (partial campus). Systems are limited to: Roof, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. |
246 | 27.84% | 53.34% | $1,340,365 | 57% | 43% | $764,008 | $576,357 |
| 20 | Systems | Hobbs | Mills Elementary School | Project DescriptionPlanning, design and construction funding to complete systems upgrades at the existing site pursuant to the Adequacy Planning Guide. Systems are limited to: Fencing, Parking Lots, Site Drainage, Landscaping, and Walkways, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. |
266 | 26.7% | 67.48% | $642,857 | 52% | 48% | $334,286 | $308,571 |
| 19 | Standards | Roswell | Mesa Middle School | Project DescriptionPlanning and design for renovation and addition to the existing facilties to the GSF pursuant to the Adequacy Planning Guide for 513 students, grades 6-8 |
3 | 71.85% | 81.49% | $16,322,078 | 71% | 29% | $1,158,868 | $473,340 |
| 19 | Standards | Gallup | Rocky View Elementary School / Red Rock Elementary School | Project DescriptionFunding to complete feasibility study to determine option to maximize utilization of current school facilities including closure of Rocky View ES. Upon completion, district may return to the PSCOC for next out-of-cycle funding phase, approval of options and total student capacity limited to the GSF pursuant to the Adequacy Planning Guide and update to the total project cost estimate. |
|
|
|
$30,842,957 | 80% | 20% | $30,000 | $15,000 |
| 19 | Standards | Belen | Jaramillo Elementary School | Project DescriptionFunding to complete educational specifications to determine options to maximize utilization of current school facilities to the GSF pursuant to the Adequacy Planning Guide for 350 students, 3&4 year-old DD Pre-K-3rd grade. Upon completion, district may return to the PSCOC for next out-of-cycle funding phase, approval of options, and update to the total project cost estimate. |
6 | 67.65% | 65.99% | $17,136,996 | 57% | 43% | $42,750 | $32,250 |
| 19 | Standards | Alamogordo | Holloman Elementary School | Project DescriptionPlanning and design for a replacement facility to the GSF pursuant to the Adequacy Planning Guide with a core capacity of 600 and initial classrooms for 500 students, grades K-5. Award includes demolition of existing Holloman ES. Demolition of Holloman IS is not included at this time. The play field/track on this site is excluded from the scope of this award. Any federal funding to support this or future phases will be primary sources to complete the work; non_x0002_funded balances for the scope of work may be considered at a future PSCOC meeting for award at the state/local match percentages. |
7 | 64.45% | 74.69% | $34,207,757 | 62% | 38% | $2,120,881 | $1,299,895 |
| 19 | Standards | Los Alamos | Barranca Mesa Elementary School | Project DescriptionPlanning, design, and construction for renovation/replacement of the existing facilties to the GSF pursuant to the Adequacy Planning Guide for 450 students, 3&4-year-old DD Pre-K-6th grade. |
11 | 55.13% | 73.96% | $18,798,134 | 47% | 53% | $8,835,123 | $9,963,011 |
| 19 | Standards | Gallup | Tohatchi High School | Project DescriptionFunding to complete feasibility/utilization study to determine options to maximize utilization of the current school facilities. Upon completion, district may return to the PSCOC for next out-of_x0002_cycle funding phase, approval of options and total student capacity to the GSF pursuant to the Adequacy Planning Guide, and update to the total project cost estimate. |
28 | 49.27% | 71.49% | $31,424,650 | 80% | 20% | $60,000 | $15,000 |
| 19 | Standards | Las Vegas City | Sierra Vista Elementary School | Project DescriptionPlanning, and design, for renovation of the existing facilties to the GSF pursuant to the Adequacy Planning Guide for 330 students, 3&4-year-old DD Pre-K-6th grade. |
36 | 46.85% | 61.8% | $8,441,479 | 53% | 47% | $447,398 | $396,750 |
| 19 | Standards | Los Lunas | Peralta Elementary School | Project DescriptionFunding to complete educational specifications and a campus feasibility/utilization study, to determine options to renovate and/or replace the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 369 students, 3&4-year-old DD Pre-K-6th grade. Award includes funding for minor upgrades to the existing portable campus to house students from Peralta ES during construction. Offset carryforward of $12,000 will apply to future awards or award phases. |
38 | 46.18% | 62.29% | $17,856,749 | 76% | 24% | $57,000 | $18,000 |
| 19 | Standards | Roswell | Nancy Lopez Elementary School | Project DescriptionFunding to complete educational specifications to include updated enrollment projections and definition of educational program. Upon completion, district may return to the PSCOC for next out-of-cycle funding phase, approval of options for renovations/replacements/additions and total student capacity to the GSF pursuant to the Adequacy Planning Guide, and update to the total project cost estimate. |
39 | 45.78% | 74.29% | $10,133,138 | 71% | 29% | $53,250 | $21,750 |
| 19 | Standards | Las Cruces | Desert Hills Elementary School | Project DescriptionPlanning and design for renovations and additions to the existing facility to the GSF pursuant to the Adequacy Planning Guide for 648 students, grades K-5. The award includes removal of the portables on site which will be replaced with permanent facilities as part of this project. |
51 | 43.36% | 51.51% | $5,725,000 | 64% | 36% | $366,400 | $206,100 |
| 19 | Standards | Zuni | Zuni Middle School | Project DescriptionFunding to complete feasibility/structural study to determine options to maximize utilization of the current school facilities. Upon completion, district may return to the PSCOC for next out-of_x0002_cycle funding phase, approval of options and total student capacity to the GSF pursuant to the Adequacy Planning Guide, and update to the total project cost estimate. |
67 | 41.99% | 69.19% | $19,793,143 | 100% | 0% | $75,000 | $0 |
| 19 | Systems | Magdalena | Magdalena Combined School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 20,228 square feet (partial campus). Systems are limited to: HVAC, Roof, and Air/Ventilation, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount |
167 | 33.87% | 77.34% | $608,967 | 75% | 25% | $456,725 | $152,242 |
| 19 | Systems | Las Cruces | Fairacres Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing site to the GSF pursuant to the Adequacy Planning Guide. Systems are limited to Parking Lots and Site Drainage as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount |
194 | 32.13% | 77.23% | $491,429 | 64% | 36% | $314,515 | $176,914 |
| 19 | Systems | Tularosa | Tularosa Middle School | Project DescriptionFunding to complete district-wide feasibility/utilization study to determine options to maximize utilization of the current school facilities. Upon completion, district may return to the PSCOC for out-of-cycle funding, including approval of options under the systems-based program, or potential conversion to a standards-based grant and update to the total project cost estimate |
23 | 50.44% | 74.75% | $75,000 | 71% | 29% | $53,250 | $21,750 |
| 19 | Systems | Alamogordo | Buena Vista Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 36,100 square feet (whole campus). Systems are limited to: Walkways, Exterior Walls, Exterior Windows & Doors, and Interior Doors, Partitions, Stairs, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. |
102 | 38.51% | 73.93% | $1,071,429 | 62% | 38% | $664,286 | $407,143 |
| 19 | Systems | Alamogordo | Sacramento Elementary School | Project DescriptionRetroactive funding to complete demolition of the existing 50,081 square foot facility under the previously awarded project P11-002 Desert Star ES, which provided a new elementary school to relieve overcrowding at Yucca ES and to combine it with Sacramento ES. Portables may remain on site as non-educational space to support district needs |
72.82% | $1,000,000 | 70% | 30% | $700,000 | $300,000 | ||
| 19 | Systems | Las Cruces | Lynn Middle School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 67,121 square feet (partial campus). Systems are limited to: Floor Finishes, Interior Doors, Partitions, Stairs, HVAC, and Lighting/Branch Circuits, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount |
118 | 37.32% | 71.65% | $4,248,260 | 64% | 36% | $2,718,886 | $1,529,374 |
| 19 | Systems | Las Cruces | Rio Grande Preparatory Institute | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilitiesto the GSF pursuant to the Adequacy Planning Guide for 42,940 square feet (whole campus). Systems are limited to Roof, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount |
134 | 36.16% | 68.55% | $1,085,986 | 64% | 36% | $695,031 | $390,955 |
| 19 | Systems | Las Cruces | Mesilla Valley Leadership Academy | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 12,943 square feet (partial campus). Systems are limited to Roof, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount |
115 | 37.46% | 67.17% | $390,000 | 64% | 36% | $249,600 | $140,400 |
| 19 | Systems | Carrizozo | Carrizozo Combined School | Project DescriptionFunding to complete district-wide feasibility/utilization study to determine options to maximize utilization of the current school facilities. Upon completion, district may return to the PSCOC for out-of-cycle funding, including approval of options under the systems-based program, or potential conversion to a standards-based grant and update to the total project cost estimate |
10 | 56.42% | 66.14% | $75,000 | 10% | 90% | $7,500 | $67,500 |
| 19 | Systems | Cloudcroft | Cloudcroft Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 13,700 square feet (partial campus). Systems are limited to: Roof, Ceiling Finishes, and Lighting/Branch Circuits, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The district is encouraged to consider strategies to right-size their facilities. |
299 | 27.37% | 63.82% | $429,282 | 10% | 90% | $42,928 | $386,354 |
| 19 | Systems | Belen | Dennis Chavez Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 45,594 square feet (partial campus). Systems are limited to: Parking Lots, Site Lighting, Drainage, Exterior Windows & Doors, Roof, Floor Finishes, HVAC, Main Power/Emergency, Lighting/Branch Circuits, Plumbing, Fire Alarm System, and Security Systems (Communication), as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount |
168 | 33.84% | 59.69% | $2,557,091 | 57% | 43% | $1,457,542 | $1,099,549 |
| 19 | Systems | West Las Vegas | Tony Serna Jr. Elementary School | Project DescriptionFunding to complete district-wide feasibility/utilization study to determine options to maximize utilization of the current school facilities prior to design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 19,517 square feet (partial campus). Systems are limited to: Site Lighting, Site Utilities, Exterior Walls, Exterior Windows and Doors, Roof, Ceiling Finishes, Interior Doors, Partitions and Stairs, Interior Walls, HVAC, Lighting/Branch Circuits and Fire Alarm Systems, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount |
121 | 37.21% | 58.94% | $1,084,873 | 67% | 33% | $726,865 | $358,008 |
| 19 | Systems | Bernalillo | Bernalillo Middle School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 69,139 square feet (partial campus). Systems are limited to: Parking Lots, Roof, Plumbing, Fire Alarm System, and Exterior Walls, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The district is encouraged to consider strategies to right-size their facilities |
291 | 27.66% | 53.36% | $4,004,139 | 41% | 59% | $1,641,697 | $2,362,442 |
| 19 | Systems | Deming | Chaparral Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 48,347 square feet (partial campus). Systems are limited to HVAC and Ceiling Finishes, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount |
298 | 27.5% | 53.25% | $2,334,728 | 69% | 31% | $1,610,962 | $723,766 |
| 19 | Systems | Socorro | Sarracino Middle School | Project DescriptionFunding to complete district-wide feasibility/utilization study to determine options to maximize utilization of the current school facilities. Upon completion, district may return to the PSCOC for out-of-cycle funding, including approval of options under the systems-based program, or potential conversion to a standards-based grant and update to the total project cost estimate. |
82 | 40.48% | 47.21% | $75,000 | 72% | 28% | $54,000 | $21,000 |
| 19 | Systems | Floyd | Floyd Combined School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing site to the GSF pursuant to the Adequacy Planning Guide. Systems are limited to Parking Lots as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The district is encouraged to consider strategies to right-size their facilities. |
34.41% | 46.03% | $576,443 | 76% | 24% | $438,097 | $138,346 | |
| 19 | Systems | Los Lunas | Los Lunas Middle School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the GSF pursuant to the Adequacy Planning Guide for 79,758 square feet (partial campus). Systems are limited to: Parking Lots, Playground Equipment, Site Lighting, Site Drainage, Walkways, Roof, Ceiling Finishes, Floor Finishes, Interior Walls, HVAC, Main Power/Emergency, Lighting/Branch Circuits, Plumbing, Fire Sprinkler, Demolition, and Security Systems (Access Control), as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The district shall pursue legal remedy on roof warranty(ies). Any costs recovered in association with this work shall be split at the state/local match of this award, and shared proportionately between the district and the PSCOC |
79 | 40.77% | 45.5% | $4,115,790 | 76% | 24% | $3,128,000 | $987,790 |
| 19 | Systems | Las Cruces | Highland Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the defined participation limits of the funding program for 83,833 square feet (whole campus). Systems are limited to: Interior Doors, Partitions, Stairs, and Lighting/Branch Circuits, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount |
272 | 28.28% | 67.41% | $359,171 | 64% | 36% | $229,869 | $129,302 |
| 19 | Systems | Las Cruces | Picacho Middle School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing site to the defined participation limits of the funding program. Systems are limited to Fencing as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. |
223 | 30.49% | 65.77% | $220,684 | 64% | 36% | $141,238 | $79,446 |
| 19 | Systems | Las Cruces | Oñate High School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the defined participation limits of the funding program for 177,871 square feet (partial campus). Systems are limited to: Lighting/Branch Circuits, and Security Systems (Intercom), as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. The district is encouraged to consider strategies to right-size their facilities |
184 | 32.78% | 61.78% | $514,293 | 64% | 36% | $329,147 | $185,145 |
| 19 | Systems | Las Cruces | Vista Middle School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing site to the defined participation limits of the funding program. Systems are limited to Fencing as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. |
173 | 33.51% | 60.72% | $91,886 | 64% | 36% | $58,807 | $33,079 |
| 19 | Systems | Las Cruces | Hillrise Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to the defined participation limits of the funding program for 399 square feet (partial campus). Systems are limited to Interior Doors, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. |
295 | 27.54% | 58.2% | $61,109 | 64% | 36% | $39,110 | $21,999 |
| 19 | Systems | Las Cruces | Mayfield High School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing site to the defined participation limits of the funding program. Systems are limited to: Fencing, Site Lighting, as identified in the district's application, including associated incidental systems directly related to the work in this award. Any deviation from the listed systems must receive PSFA approval and associated costs must be within the award amount. |
237 | 29.94% | 43.33% | $383,387 | 64% | 36% | $245,368 | $138,019 |
| 18 | Systems | Central | Kirtland Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to adequacy for 664 students, grades K-6. Systems are limited to: roof, ceiling finishes, foundation/slab/structure, air/ventilation, HVAC, main power/emergency, lighting/branch circuits, and fire sprinkler as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount. |
36 | 34.46% | 59.73% | $3,453,673 | 64% | 36% | $2,210,351 | $1,243,322 |
| 18 | Systems | Gadsden | Desert Trail Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to adequacy for 548 students, grades PreK-6. Systems are limited to: roof, ceiling finishes, floor finishes, air/ventilation, HVAC, and main power/emergency as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount. |
87 | 28.75% | 40.39% | $5,860,057 | 85% | 15% | $4,981,048 | $879,009 |
| 18 | Systems | Las Vegas City | Los Ninos Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to adequacy for 392 students, grades K-3. Systems are limited to: parking lots, site lighting, grading/drainage, walkways, exterior walls, exterior windows & doors, roof, ceiling finishes, floor finishes, HVAC, main power/emergency, lighting/branch circuits, plumbing, and fire sprinkler as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount |
33 | 35.04% | 39.1% | $5,051,855 | 55% | 45% | $2,778,520 | $2,273,335 |
| 18 | Systems | Clovis | Cameo Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: parking lots, site lighting, walkways, site specialties/landscaping (drainage), exterior windows and doors, ceiling finishes, and floor finishes, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount |
94 | 27.06% | 46.12% | $1,670,375 | 74% | 26% | $1,236,078 | $434,298 |
| 18 | Systems | Clovis | Mesa Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: parking lots, ceiling finishes, floor finishes, air/ventilation, and HVAC, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount |
79 | 28.17% | 55.56% | $2,173,500 | 74% | 26% | $1,608,390 | $535,110 |
| 18 | Systems | Dexter | Dexter Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: air/ventilation, HVAC, and main power/emergency, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount |
66 | 29.63% | 43.72% | $977,421 | 78% | 22% | $762,388 | $215,033 |
| 18 | Systems | Farmington | Country Club Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: site utilities, exterior windows & doors, roof, ceiling finishes, floor finishes, foundation/slab/structure, air/ventilation, HVAC, main power/emergency, lighting/branch circuits, plumbing, and fire sprinkler, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount |
132 | 24.95% | 50.09% | $4,890,521 | 64% | 36% | $3,129,933 | $1,760,587 |
| 18 | Systems | Floyd | Combined School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: main power/emergency, portables, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount |
124 | 25.42% | 38.51% | $153,635 | 76% | 24% | $116,762 | $36,872 |
| 18 | Systems | Gadsden | Loma Linda Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: parking lots, site specialties/landscaping (drainage), site utilities, roof, ceiling finishes, floor finishes, interior walls, air/ventilation, HVAC, main power/emergency, and lighting/branch circuits, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount |
163 | 23.53% | 30.48% | $7,567,000 | 85% | 15% | $6,431,950 | $1,135,050 |
| 18 | Systems | Los Alamos | Mountain Elementary School | Project DescriptionPlanning, design and construction funding to complete system upgrades at the existing facilities to adequacy. Systems are limited to: site utilities, walkways, exterior walls, exterior doors & windows, roof, ceiling finishes, floor finishes, foundation/slab/structure, interior doors, partitions and stairs, interior walls, air/ventilation, HVAC, main power/emergency, lighting/branch circuits, plumbing, fire sprinkler, and portables, as identified in the district's application. Any deviation from the listed systems, the alteration level and percent of alteration must receive PSFA approval and associated costs must be within the award amount |
85 | 27.51% | 49.3% | $3,919,065 | 48% | 52% | $1,881,151 | $2,037,914 |
| 17 | Standards | Reserve | Glenwood Elementary School | Project DescriptionFeasibility study to explore all options for the facility to adequacy for 9 students, grades K-3. The current phase local share is advanced, and may be converted to a grant subject to verification of available district resources |
1 | 95.42% | 67.86% | $693,333 | 10% | 90% | $7,000 | $63,000 |
| 16 | Standards | Roswell | Del Norte Elementary School | Project DescriptionFunding to complete: district-wide utilization study based on geocode analysis; new educational specifications; and analysis of major building systems. Upon completion, district may return to the PSCOC for next out-of-cycle funding phase and approval of options to renovate/replace and total student capacity to adequacy. |
6 | 82.07% | 70.45% | $26,833,232 | 73% | 27% | $73,000 | $27,000 |
| 16 | Standards | Española | Abiquiu Elementary School | Project DescriptionFunding to complete analysis of major building systems. Upon completion, district may return to the PSCOC for next out-of_x0002_cycle funding phase to renovate existing facilities to adequacy for up to 150 students, grades K-6, or the current facility capacity |
17 | 58.04% | 55.4% | $3,143,796 | 63% | 37% | $63,000 | $37,000 |
| 16 | Standards | Clovis | Highland Elementary School | Project DescriptionFunding to complete analysis of major building systems. Upon completion, district may return to the PSCOC for next out-of_x0002_cycle funding phase and approval of options to renovate/replace to adequacy for 320 students, grades K-5. |
24 | 52.84% | 64.5% | $16,374,667 | 76% | 24% | $76,000 | $24,000 |
| 15 | Standards | Gallup | Thoreau Elementary School | Project DescriptionPlanning and design to renovate/replace facilities (including disposal of existing facilties) to adequacy for 310 students, grades K-5. PSFA shall monitor the progress of this and all district projects, and may require the district to hire a construction manager to assist in the direct management of all PSCOC funded projects. For any previously awarded projects which are more than 18 months beyond substantial completion, the district shall commit to completing project audit and financial closeout by June 30, 2015. |
10 | 64.17% | 69.41% | $18,720,880 | 81% | 19% | $1,516,391 | $355,697 |
| 15 | Standards | Raton | New Combined Elementary School | Project DescriptionPlanning and design to replace the facilities, combining the students from Columbian ES, Longfellow ES and Kearny ES into a single school to adequacy for up to 600 students, grades K-5. Planning shall include a site selection feasibility study (including disposal of existing facilties). |
|
|
|
$25,023,093 | 57% | 43% | $1,426,316 | $1,075,993 |
| 15 | Standards | Clovis | Parkview Elementary School | Project DescriptionPlanning and design to replace the facilities to adequacy for 500 students, grades K-5. The district shall report on the available capacity in the remaining district elementary schools. The release of construction funding is contingent on a PSCOC-approved action plan for the existing Parkview ES of any disposal with potential PSCOC participation or future use at the district's sole expense. For any previously awarded projects which are more than 18 months beyond substantial completion, the district shall commit to completing project audit and financial closeout by June 30, 2015. |
24 | 52% | 44.47% | $26,640,110 | 76% | 24% | $2,024,648 | $639,363 |
| 15 | Standards | Carlsbad | New Combined Elementary School | Project DescriptionPlanning and design to replace the facilities (including disposal of existing facilties), combining the students from Puckett ES and Pate ES into a single school on a new site to adequacy for a core of 600 students and classrooms for 300 students, grades 1-5, conditional upon approval of consolidation by the district School Board and by the Public Education Department. Final student capacity for classrooms may be adjusted based upon evidence of need. Offset carryforward of $1,027,594 shall be applied to a future award. |
32 | 47.71% | 54.11% | $20,926,080 | 17% | 83% | $0 | $2,092,608 |
| 15 | Standards | Ruidoso | Nob Hill Elementary School | Project DescriptionEducational specifications and district-wide utilization study to replace existing facilities (including disposal of existing facilties) to adequacy for up to 192 students, grades Pre-K/K. Offset carryforward of $153,961 shall be applied to a future award. For any previously awarded projects which are more than 18 months beyond substantial completion, the district shall commit to completing project audit and financial closeout by June 30, 2015. |
35 | 46.95% | 63.04% | $14,332,220 | 11% | 89% | $0 | $100,000 |
| 15 | Standards | Gallup | New Combined Elementary School | Project DescriptionPlanning and design to replace the facilities (including disposal of existing facilties), combining the students from Lincoln ES and Roosevelt ES into a single school on the Lincoln ES site to adequacy for 380 students, grades K-5. PSFA shall monitor the progress of this and all district projects, and may require the district to hire a construction manager to assist in the direct management of all PSCOC funded projects. For any previously awarded projects which are more than 18 months beyond substantial completion, the district shall commit to completing project audit and financial closeout by June 30, 2015. |
|
|
72.86% | $22,627,480 | 81% | 19% | $1,832,826 | $429,922 |
| 15 | Standards | Carlsbad | Riverside Elementary School | Project DescriptionPlanning and design to replace the facilities (including disposal of existing facilties) to adequacy for for 352 students, grades 1-5. Final student capacity for classrooms may be adjusted based upon evidence of need. |
45 | 44.7% | 59.13% | $16,391,750 | 17% | 83% | $0 | $1,639,175 |
| 15 | Standards | Albuquerque | Mountain View Elementary School | Project DescriptionPlanning, design, and construction to renovate/replace facilities to adequacy for 400 students, grades K-5. For any previously awarded projects which are more than 18 months beyond substantial completion, the district shall commit to completing project audit and financial closeout by June 30, 2015. |
49 | 43.36% | 64.65% | $18,069,738 | 57% | 43% | $6,865,120 | $11,204,618 |
| 15 | Standards | State Charter | Cartwright Hall | Project DescriptionPlanning and design to renovate the facilities (support space), including demolition of the annex. The local match is approved to be funded from the Public School Capital Outlay Fund through HB55 of the 2014 Legislature. For any previously awarded projects which are more than 18 months beyond substantial completion, the district shall commit to completing project audit and financial closeout by June 30, 2015. |
50 | 43.23% | 91.32% | $7,038,365 | 0% | 100% | $703,837 | $0 |
| 15 | Standards | Mountainair | Mountainair Jr./Sr. High School | Project DescriptionPlanning and design to renovate/replace the buildings on the HS campus for 170 students, grades 7-12 . Planning shall include a district-wide feasibility study, lifecycle cost analysis and an evaluation of maintenance and operation costs. The district shall present the findings to the Council before proceeding with the design phase of the project. |
85 | 33.85% | 45.11% | $13,333,333 | 36% | 64% | $480,000 | $853,333 |
| 15 | Standards | State Charter | Garrett Dormitory | Project DescriptionPlanning and design to renovate existing dormitory to adequacy, including HVAC, piping, and drainage deficiencies for up to 50 students. The NMSBVI shall seek direct legislative appropriations, including GO Bonds and STBs, through HED and the Legislature to accommodate the local share of the total estimated project cost. For any previously awarded projects which are more than 18 months beyond substantial completion, the district shall commit to completing project audit and financial closeout by June 30, 2015. |
87 | 33.58% | 61.73% | $1,649,667 | 50% | 50% | $82,483 | $82,483 |
| 15 | Standards | State Charter | Delgado Hall | Project DescriptionPlanning and design to renovate the facilities (support space), including demolition of the annex. A local match reduction of 50% of the phase 1 award is approved. Unless a financial need can be verified to the PSCOC at a future meeting to adjust the local match reduction, the NMSD shall accommodate 50% of the local share of the phase 1 award. For any previously awarded projects which are more than 18 months beyond substantial completion, the district shall commit to completing project audit and financial closeout by June 30, 2015. |
90 | 33.3% | 90.33% | $2,663,499 | 0% | 100% | $133,175 | $133,175 |
| 14 | Standards | Deming | Deming Intermediate School | Project DescriptionPlanning and design to build new intermediate school on a new site to adequacy for a core capacity of 450 students, and classrooms for 350 students, grade 6. Award includes demolition of existing intermediate school facilities. Student capacity will be established following final determination of the proposed Columbus charter school, but no later than the 2013 PEC decision. |
3 | 84.78% | $17,700,000 | 71% | 29% | $1,157,300 | $472,700 | |
| 14 | Standards | State Charter | New Mexico School For The Blind And Visually Impaired | Project DescriptionPlanning and design to renovate Quimby Gym to adequacy for 70 students, grades K-12. The NMSBVI shall seek direct legislative appropriations, including GO Bonds and STBs, through HED and the Legislature to accommodate the local share of the total estimated project cost. |
8 | 77.11% | $1,844,015 | 50% | 50% | $92,201 | $92,201 | |
| 14 | Standards | Lordsburg | Lordsburg High School | Project DescriptionEducational specifications and district-wide utilization study to renovate/replace various facilities at the high school to adequacy for 160 students, grades 9-12. Utilization study shall explore options for consolidation of Southside ES (3rd & 4th grades with wNMCI rank of #18) with Central ES (5th & 6th with wNMCI rank of #2) for a 3rd through 5th grade configurations with 6th grade moved to the newly renovated Dugan- Turango MS. Based on the feasibility of the consolidation, the district should apply for renovations of the existing Central ES in a future award cycle and include disposal of the Southside ES school site and the old abandoned high school. Future out-of-cycle construction funding may consider advance/partial waiver of local share. |
10 | 71.33% | $11,000,000 | 35% | 65% | $35,000 | $65,000 | |
| 14 | Standards | Central | Grace B Wilson Elementary School & Ruth N Bond Elementary School | Project DescriptionEducational specifications and utilization/infrastructure study to renovate/replace existing facilities, combining the K-3 grade students from Ruth N Bond ES with the 4-6 grade students from Grace B Wilson ES into a single school on the Ruth N Bond site. The district may return for out-ofcycle planning and design funds to replace the facilities to adequacy for 715 students grades K-6, based on the outcome of the study and approval of consolidation by the district School Board and by the Public Education Department.The district is required to update their Facility Master Plan to reflect the new grade configurations at the elementary schools. |
|
|
$25,000,000 | 61% | 39% | $61,000 | $39,000 | |
| 14 | Standards | Mesa Vista | Ojo Caliente Elementary School | Project DescriptionPlanning and design, including campus-wide educational specifications and utilization/infrastructure study to renovate/replace the existing facilities to adequacy for 135 students, grades K-8. |
20 | 60.45% | $7,000,000 | 46% | 54% | $322,000 | $378,000 | |
| 14 | Standards | Reserve | Reserve Combined School | Project DescriptionEducational specifications to renovate/replace various facilities at the combined school to adequacy for 140 students, grades K-12. Future out-ofcycle design and construction funding may consider advance/partial waiver of local share upon passing a bond to bring to practical capacity and meeting eligibility requirements. An advance of the local share for the phased request is authorized and shall be repaid within a 4 year period. Offset carryforward of $195,763 shall be applied to a future award. |
21 | 59.02% | $8,700,000 | 16% | 84% | $8,000 | $42,000 | |
| 14 | Standards | Grants | Los Alamitos Middle School | Project DescriptionEducational specifications to replace the existing middle school and utilization study of the elementary feeder schools. The district may return for out-of-cycle planning and design funds to replace the middle school facilities to adequacy for 453 students grades 7-8, and the possible inclusion of the 217 6th grade students from the feeder schools, based on the outcome of the study. The district is required to update their Facility Master Plan to reflect the new grade configurations at the elementary and middle schools. |
24 | 57.4% | $25,816,453 | 74% | 26% | $74,000 | $26,000 | |
| 14 | Standards | Roswell | Parkview Early Literacy | Project DescriptionPlanning and design, including educational specifications, to construct new addition and to renovate existing facilities to adequacy for 350 3&4-year-old DD students. |
30 | 53.41% | $10,500,000 | 72% | 28% | $756,000 | $294,000 | |
| 14 | Standards | Albuquerque | Marie Hughes Elementary School | Project DescriptionPlanning and design for classroom addition to replace existing portables, renovation/expansion of existing cafeteria and kitchen, and related site improvements to adequacy for 600 students, grades K-5. |
36 | 50.63% | $8,475,010 | 55% | 45% | $466,126 | $381,375 | |
| 14 | Standards | Hobbs | New Elementary School | Project DescriptionPlanning and design, including district-wide educational specifications, to construct a new elementary school to adequacy for 450 students, grades K- 5, including 79 3&4-year-old DD students from Jenkins-Nunan Center (125.45% wNMCI). |
41 | 48.41% | $16,128,870 | 54% | 46% | $870,959 | $741,928 | |
| 14 | Standards | Hobbs | Broadmoor Elementary School | Project DescriptionPlanning and design to demolish existing facilities and construct new two story elementary school to adequacy for up to 400 students, grades K-5. Student population shall be based upon the district-wide educational specifications, utilization, and validation of growth. |
41 | 48.41% | $14,440,157 | 54% | 46% | $779,768 | $664,247 | |
| 14 | Standards | Central | Newcomb High School | Project DescriptionUtilization study to renovate existing facilities and reduce gross square footage to adequacy. The utilization study should include an examination of Newcomb ES and the possible utilization of the relatively new Newcomb MS as the location for Newcomb ES. The newly renovated Newcomb HS could be repurposed to house both the MS and the HS. The district may return for out-of-cycle planning and design funds to renovate the high school facilities to adequacy for 237 students grades 9-12; the district is also encouraged to apply for an award for Newcomb ES in a future award cycle, based on the outcome of the study. The district will be required to update their Facility Master Plan to reflect the new grade configurations at the schools. |
45 | 46.27% | $11,911,896 | 61% | 39% | $61,000 | $39,000 | |
| 14 | Standards | State Charter | Aldo Leopold Charter School | Project DescriptionThe PSCOC shall first determine availability of existing facilities at the Silver Consolidated School District that meet the programmatic needs of the charter. If none are available, then this award is for early planning, update of educational specifications, and feasibility study to consider various sites, funding requirements and financing options to construct or acquire publiclyowned facilities for 210 students, grades 6-12. |
47 | 46.09% | $9,000,000 | 47% | 53% | $23,500 | $26,500 | |
| 14 | Standards | Albuquerque | Arroyo Del Oso Elementary School | Project DescriptionPlanning, design and construction to renovate and expand administration area, including drainage improvements to adequacy for 420 students, grades K-5. |
49 | 45.34% | $1,022,122 | 55% | 45% | $562,167 | $459,955 | |
| 14 | Standards | Gallup | Ramah Elementary School | Project DescriptionPlanning and design to replace the facilities to adequacy for 190 students, grades K-5; award includes demolition of old Ramah HS to accommodate new construction, and demolition of the existing Ramah ES once construction is complete. The district must update their priority listing in their 5 year FMP and have school board approval. The Gallup District Superintendent and School Board shall report at the September 2013 PSCOC meeting with an action plan for signifcant progress on previously approved projects in Gallup. |
54 | 44.13% | $9,467,853 | 81% | 19% | $738,660 | $173,266 | |
| 14 | Standards | Farmington | Northeast Elementary School | Project DescriptionPlanning and design for renovations/additions to existing facilities to adequacy for 558 students, grades K-5. Prior to the release of Phase 2 funding, the district shall have a current FMP approved by PSFA. |
61 | 41.92% | $12,700,000 | 60% | 40% | $762,000 | $508,000 | |
| 14 | Standards | State Charter | New Mexico School For The Blind And Visually Impaired | Project DescriptionPlanning and design to replace the Sacramento Dormitory with cottage-style facilities, including demolition of the existing facilities. NMSBVI must justify demand of both daytime and permanent residential students for utilization of all 41 residential post-project rooms for both post-school preparation expanded core and other necessary residential space that may include school support functions. Local share for educational space and school support space will be determined by the completion of the design phase. The NMSBVI shall seek direct legislative appropriations, including GO Bonds and STBs, through HED and the Legislature to accommodate the local share of the total estimated project cost. |
75 | 38.58% | $2,294,411 | 50% | 50% | $114,721 | $114,721 | |
| 14 | Standards | Albuquerque | Collet Park Elementary School | Project DescriptionPlanning, design and construction for kindergarten classroom addition, renovation of existing spaces, renovation/expansion of administration area, and upgrade of dining and kitchen areas to adequacy for 375 students, grades K-5. |
76 | 38.53% | $5,028,217 | 55% | 45% | $2,765,519 | $2,262,698 | |
| 14 | Standards | Belen | Rio Grande Elementary School | Project DescriptionEducational specifications and utilization/infrastructure study to renovate/replace existing facilities to adequacy for 410 students, grades 3&4-year-old DD through 6th. The district may return for out-of-cycle planning and design funds. Prior to expenditure of PSCOC funds, the district must submit a corrective action plan to address audit findings. |
77 | 38.4% | $16,027,945 | 63% | 37% | $63,000 | $37,000 | |
| 14 | Standards | Gadsden | New Elementary School | Project DescriptionPlanning and design to construct new elementary school to adequacy in the Chaparral area to relieve overcrowding, with design capacity for a core of 550 students, and classrooms for 250 students, grades K-6. |
78 | 38.23% | $19,107,485 | 87% | 13% | $1,435,500 | $214,500 | |
| 14 | Standards | Gadsden | Chaparral Elementary School | Project DescriptionPlanning and design to add new classroom addition to replace barracks and portables, and renovate existing school to adequacy for 550 students, grades K-6. The wNMCI of the existing school will be 34.69% following removal of overcrowding with the construction of the new school. |
78 | 38.23% | $14,475,046 | 87% | 13% | $1,282,819 | $191,686 | |
| 14 | Standards | Albuquerque | Atrisco Elementary School | Project DescriptionPlanning and design for classroom addition to replace classroom pods and replacement of the cafeteria/kitchen building, including demolition of existing spaces, to adequacy for 350 students, grades K-5. Prior to design, a site master plan must be completed and approved by PSFA. |
86 | 37.16% | $9,854,453 | 55% | 45% | $541,995 | $443,450 | |
| 14 | Standards | State Charter | New Mexico School For The Blind And Visually Impaired | Project DescriptionPlanning and design to renovate Ditzler Auditorium to adequacy and to renovate existing Library Building to accommodate the relocation of the Instructional Resource Center (IRC). The award also includes demolition of existing IRC building (Bert Reeves Learning Center-11,367sf) thus reducing the campus square footage footprint. Local share for educational space and school support space will be determined by the completion of the design phase. The NMSBVI shall seek direct legislative appropriations, including GO Bonds and STBs, through HED and the Legislature to accommodate the local share of the total estimated project cost. |
91 | 36.68% | $4,116,993 | 50% | 50% | $205,850 | $205,850 | |
| 14 | Standards | Farmington | Hermosa Middle School | Project DescriptionPlanning and design to renovate existing facilities to adequacy for 650 students, grades 6-8. Prior to the release of Phase 2 funding, the district shall have a current FMP approved by PSFA. |
99 | 34.59% | $10,200,000 | 60% | 40% | $612,000 | $408,000 | |
| 13 | Standards | Albuquerque | Sandia High School | Project DescriptionPlanning, design and construction for Phase I to renovate/replace facilities of the existing school to adequacy for 2,000 students, grades 9-12. The district to consider preserving the old Yucca Elementary at its current condition for future use by charters. Prior to release of construction funds, detailed phasing options for the entire project must be submitted and approved by the PSCOC. The Council is not committed to Phase 2 funding at this time |
91 | 34.83% | $61,000,000 | 54% | 46% | $11,781,146 | $10,035,791 | |
| 13 | Standards | Bernalillo | Canto Domingo Elementary School/Middle School | Project DescriptionPlanning and design to renovate/replace the existing school facilities to adequacy for 350 students, grades K-8. The district shall provide satisfactory or better maintenance and shall provide quarterly preventive maintenance reports to PSFA prior to the construction award and for 3 years following substantial completion. Award is contingent on execution of a 50 year or equivalent term land lease by January 1, 2013 that is acceptable to the PSCOC |
47 | 44.05% | $15,852,294 | 42% | 58% | $665,796 | $919,433 | |
| 13 | Standards | Capitan | Capitan High School & Capitan Elementary School | Project DescriptionPlanning and design to renovate/replace existing high school facilities to adequacy for 150 students, grades 9-12, and planning and design to renovate existing elementary school facilities to adequacy for 206 students, grade K-5. Shared cored facilities shall accommodate the entire campus. It is recognized that district does not have financial capacity for their share of the project. Prior to construction, the district shall submit a financial phasing plan that may include potential advance/waiver. A goal of this award would be to reduce the gross square footage of the facility by 50% or more |
|
|
$24,100,000 | 10% | 90% | $241,000 | $2,169,000 | |
| 13 | Standards | Central | Naschitti Elementary School | Project DescriptionPlanning and design to renovate/replace the existing school facilities to adequacy for 125 students, grades K-5. |
52 | 42.51% | $7,526,427 | 63% | 37% | $474,165 | $278,478 | |
| 13 | Standards | Española | Los Niños Kindergarten | Project DescriptionPlanning and design to renovate existing facilities to adequacy for 196 kindergarten students |
33 | 48.53% | $2,702,500 | 63% | 37% | $170,258 | $99,993 | |
| 13 | Standards | Farmington | Farmington High School | Project DescriptionPlanning and design to renovate/replace the existing school facilities to adequacy for 1,600 students, grades 9-12 |
61 | 40.14% | $53,701,112 | 59% | 41% | $3,168,366 | $2,201,746 | |
| 13 | Standards | Gadsden | Desert View Elementary School | Project DescriptionPlanning and design to renovate/replace the existing school facilities to adequacy for 550 students, grades K-6. |
37 | 46.42% | $17,600,000 | 88% | 12% | $1,548,800 | $211,200 | |
| 13 | Standards | State Charter | New Mexico School For The Deaf | Project DescriptionPlanning and design to address site infrastructure needs and deficiencies to adequacy for 60 students, grades K-12. Award includes additional recreational field to support the residential function of the school in accordance with the special schools adequacy standards. District must submit status report at early design |
1 | 1.37% | $14,000,000 | 50% | 50% | $700,000 | $700,000 | |
| 13 | Standards | West Las Vegas | West Las Vegas Middle School | Project DescriptionPlanning and design to renovate existing facilities to adequacy for 289 students, grades 6-8. A goal of this award would be to reduce the gross square footage of the facility by 50% or more. |
99 | 34.24% | $6,829,118 | 74% | 26% | $505,355 | $177,557 | |
| 13 | Standards | Zuni | Dowa Yalanne Elementary School & A:Shiwi Elementary School | Project DescriptionPlanning and design to combine existing schools and replace school facilities to adequacy for 700 students, grades K-5. Prior to construction, the district shall submit a disposition plan of existing facilities. Award is contingent on execution of a 50 year or equivalent term land lease by January 1, 2013 that is acceptable to the PSCOC |
|
|
$25,419,409 | 100% | 0% | $2,541,941 | $0 | |
| 12 | Standards | Albuquerque | Douglas Macarthur Elementary School | Project DescriptionPlanning and design to renovate and make additions to the existing facilities to adequacy for 242 students, grades K-5 |
52 | $3,689,297 | 55% | 45% | $202,911 | $166,018 | ||
| 12 | Standards | Albuquerque | Mckinley Middle School | Project DescriptionPlanning and design to renovate and make additions to the existing facilities to adequacy for 600 students, grades 6-8 |
59 | $8,053,853 | 55% | 45% | $442,962 | $362,423 | ||
| 12 | Standards | Albuquerque | Chaparral Elementary School | Project DescriptionPlanning and design to renovate and make additions to the existing facilities to adequacy for 991 students, grades K-5 |
56 | $14,831,908 | 55% | 45% | $815,755 | $667,436 | ||
| 12 | Standards | Belen | Family School | Project DescriptionIntial planning to provide instructional space to adequacy to a maximum equivalent of 82 full-time students serving grades 1-8. Utilization and efficiency shall be maximized and co-location with an existing facility shall be considered. |
22 | 69% | 31% | $41,400 | $18,600 | |||
| 12 | Standards | Bernalillo | Bernalillo High School | Project DescriptionPlanning and design to renovate and replace existing facilities to adequacy for 936 students, grades 9-12. |
30 | $44,516,000 | 44% | 56% | $1,355,200 | $1,724,800 | ||
| 12 | Standards | Central | Nataani Nez Elementary School | Project DescriptionAmend the previous 2008-2009 Standards-based award to Central Consolidated Schools to renovate Nataani Nez ES to instead close the school and dispose of by demolition or change in title, with approval for plan and design for necessary improvements to adequacy for 350 K-3 students transferred to the affected schools. When applying for construction award, the district shall report to the Council on under_x0002_utilized space at the 3 elementary schools. The award is contingent on renewal of leases. |
$8,471,386 | 64% | 36% | $0 | $0 | |||
| 12 | Standards | Española | Velarde Elementary School | Project DescriptionPlanning and design to renovate and make additions to existing facilities to adequacy for 145 students, grades K-6 with certain adequacy standards to be varianced at district's request. Award also includes a modification of the previous 05-06 Alcalde ES award to reduce core capacity to 200 serving grades K-6. District may, at its own expense, fund increased construction of the core for Alcalde ES to the original award capacity of 400. District shall demonstrate ability to maintain facilities and create a plan to pass SB-9 election |
60 | $4,545,645 | 64% | 36% | $290,921 | $163,643 | ||
| 12 | Standards | Española | Carinos Charter | Project DescriptionInitial planning to replace existing facilities (former Middle School East) to appropriate space for 197 charter students, grades K-6, and utilizing available facilities within the community. The existing school shall be demolished. District shall demonstrate ability to maintain facilities and create a plan to pass SB-9 election. |
3 | 64% | 36% | $38,400 | $21,600 | |||
| 12 | Standards | Española | E. T. S Fairview Elementary School | Project DescriptionPlanning and design to renovate and replace portions of the facility to adequacy for 420 students, grades K-6. District shall demonstrate ability to maintain facilities and create a plan to pass SB-9 election. When applying for construction award, the district shall report to the Council on under-utilized space. |
34 | $15,802,204 | 64% | 36% | $1,011,341 | $568,879 | ||
| 12 | Standards | Estancia | Estancia Middle School | Project DescriptionPlanning and design to renovate, replace, or relocate portions or all of the middle school facilities to adequacy for 150 students, grades 7-8. When applying for construction award, the district shall report to the Council on under-utilized space |
48 | $7,152,477 | 69% | 31% | $493,521 | $221,727 | ||
| 12 | Standards | Raton | Columbian Elementary School | Project DescriptionAmend the 2008-2009 award for Longfellow ES to include planning and design for a new combined K-5 elementary school facility with a core capacity for 630 students and initial classrooms for 442 students, grades K-3. Classrooms for the 4th and 5th grades are contingent upon Kearny ES becoming eligible in a future award cycle and may be requested out_x0002_of-cycle when the district passes a bond for its required match. |
24 | $20,395,161 | 68% | 32% | $0 | $0 | ||
| 12 | Standards | Rio Rancho | Colinas Del Norte Elementary School | Project DescriptionPlanning, design and construction to expand the kitchen, cafeteria and gym facilities of the existing school to adequacy for 700 students, grades K-5. Reduce scope funding due to relative condition of the school with a ranking of 472. |
$3,079,425 | 59% | 41% | $908,430 | $631,282 | |||
| 12 | Standards | Rio Rancho | Vista Grande Elementary School | Project DescriptionPlanning, design and construction to expand the kitchen, cafeteria and admin facilities of the existing school to adequacy for 700 students, grades K-5. Reduce scope funding due to relative condition of the school with a ranking of 545. |
$1,735,205 | 59% | 41% | $511,832 | $355,680 | |||
| 12 | Standards | Santa Rosa | Rita Marquez Elementary School/ Anton Chico Middle School | Project DescriptionPlanning and design to replace the existing facilities to adequacy for 100 students, grades K-8. Design goal of 20,000 SF. |
37 | $7,700,000 | 60% | 40% | $462,000 | $308,000 | ||
| 12 | Standards | Socorro | San Antonio Elementary School | Project DescriptionPlanning and design to renovate/replace facilities to adequacy for 101 students, grades K-5. |
10 | $3,175,971 | 77% | 23% | $244,550 | $73,047 | ||
| 12 | Standards | Truth or Consequences | Truth Or Consequences Elementary School | Project DescriptionPlanning and design to renovate/replace facilities to adequacy for 365 students, grades K-3. Shared space with adjacent Sierra ES to be incorporated into final design, for overall core spaces for 509 students. |
36 | $12,489,044 | 40% | 60% | $499,562 | $749,343 | ||
| 12 | Standards | West Las Vegas | Wlv Family Partnership Mhs | Project DescriptionThe previous 2007-2008 Standards-Based Award to West Las Vegas Schools for relocating the Family Partnership MHS to Union ES is cancelled and balances remaining after adjustment for offset shall revert. This award is for initial planning to relocate the school and remodel the former WLV high school cafeteria/multi-purpose building to a maximum equivalent of 80 full-time students, grades 6-12, for appropriate facilities necessary to support the alternative program needs of the school utilizing spaces available at adjacent facilities. Out-of-cycle construction award consideration, including demolition of existing building contingent on PSFA approval of new facility master plan. Offset carryover of $222,007 will be applied to future award. |
76% | 24% | $45,600 | $14,400 | ||||
| 12 | Standards | West Las Vegas | Union Elementary School | Project DescriptionThe previous 2006-2007 Standards-Based Award to West Las Vegas Schools for consolidating the students from Union ES to the Tony Serna ES campus is cancelled and balances remaining after adjustment for offset shall revert. This award is for planning and design to remodel the current school facility to adequacy for 125 students, grades 2-5. Out-of_x0002_cycle construction award consideration contingent on PSFA approval of new facility master plan. Offset carryover of $173,555 will be applied to future award. |
$1,624,428 | 76% | 24% | $123,457 | $38,986 | |||
| 11 | Standards | Alamogordo | Yucca Elementary School | Project DescriptionPlanning and design to renovate existing facilities to adequacy for 350 students, grades K-5. |
$5,712,223 | 70% | 30% | $399,856 | $171,367 | |||
| 11 | Standards | Alamogordo | Yucca Elementary School | Project DescriptionPlanning and design to build new ES with core for 500 students, grades K-5 with initial classrooms for 250 to relieve overcrowding at Yucca ES. |
$10,293,750 | 70% | 30% | $720,563 | $308,813 | |||
| 11 | Standards | Cobre | Bayard Elementary School | Project DescriptionPlanning and design to renovate existing facilities to adequacy for 260 students, grades K-6. |
$10,310,720 | 57% | 43% | $587,711 | $443,361 | |||
| 11 | Standards | Gallup | Juan De Onate Elementary School | Project DescriptionPlanning and design to renovate existing facilities and add classrooms to replace portables to adequacy for 326 students, grades K-5. Prior to start of design, district shall provide district-wide utilization and attendance study of all elementary schools. |
$11,074,712 | 85% | 15% | $941,351 | $166,121 | |||
| 11 | Standards | Gallup | Washington Elementary School | Project DescriptionPlanning and design to replace existing facilities to adequacy for 204 students, grades K-5. Prior to start of design, district shall provide district_x0002_wide utilization and attendance study of all elementary schools. |
$8,921,823 | 85% | 15% | $758,355 | $133,827 | |||
| 11 | Standards | Gallup | Church Rock Academy | Project DescriptionPlanning and design to replace existing facilities to adequacy for 269 students, grades K-5, contingent on district acquiring a new site. Prior to start of design, district shall provide district-wide utilization and attendance study of all elementary schools. |
$10,428,811 | 85% | 15% | $886,449 | $156,432 | |||
| 11 | Standards | Gallup | Thoreau Elementary School | Project DescriptionPlanning and design to renovate existing facilities and add classrooms to replace portables to adequacy for 304 students, grades K-5. Prior to start of design, district shall provide district-wide utilization and attendance study of all elementary schools. |
$12,415,668 | 85% | 15% | $1,055,332 | $186,235 | |||
| 11 | Standards | Gallup | Jefferson Elementary School | Project DescriptionPlanning and design to renovate or replace the existing facilities to adequacy for 282 students, grades K_x0002_5. Prior to start of design, district shall provide district-wide utilization and attendance study of all elementary schools. |
$11,536,013 | 85% | 15% | $980,561 | $173,040 | |||
| 11 | Standards | Gallup | Lincoln Elementary School | Project DescriptionPlanning and design to renovate or replace the existing facilities to adequacy for 261 students, grades K_x0002_5. Prior to start of design, district shall provide district-wide utilization and attendance study of all elementary schools |
$10,928,927 | 85% | 15% | $928,959 | $163,934 | |||
| 11 | Standards | Gallup | Roosevelt Elementary School | Project DescriptionPlanning and design to renovate or replace the existing facilities to adequacy for 260 students, grades K_x0002_5. Prior to start of design, district shall provide district-wide utilization and attendance study of all elementary schools. |
$11,000,000 | 85% | 15% | $935,000 | $165,000 | |||
| 11 | Standards | Las Cruces | Las Cruces High School | Project DescriptionPlanning and design to renovate and replace facilities to bring school to adequacy for estimated core of 2,000 students with classrooms estimated for 1,800. Prior to start of design, district shall provide district-wide utilization and attendance study of all high schools |
$72,880,000 | 66% | 34% | $1,980,000 | $1,020,000 | |||
| 11 | Standards | Las Cruces | University Hills Elementary School | Project DescriptionPlanning and design to renovate and add classroom addition to adequacy for 400 students, grades K-5 |
$4,797,000 | 66% | 34% | $226,388 | $116,624 | |||
| 11 | Standards | Los Alamos | Los Alamos Middle School | Project DescriptionPlanning and design to renovate/replace facilities and central kitchen to serve the district to adequacy for 536 students, grades 7- 8. |
$13,500,000 | 33% | 67% | $445,500 | $904,500 | |||
| 11 | Standards | Los Alamos | Aspen Elementary School | Project DescriptionPlanning and design to renovate/replace facilities to adequacy for 314 students, grades K-6. |
$12,214,487 | 33% | 67% | $264,000 | $536,000 | |||
| 11 | Standards | Los Lunas | Los Lunas High School | Project DescriptionPlanning and design to renovate/replace facilities to adequacy for core of 1,800 with classrooms for 1,500 students, grades 9-12. |
$65,000,000 | 80% | 20% | $2,400,000 | $600,000 | |||
| 11 | Standards | Roswell | Valley View Elementary School | Project DescriptionPlanning and design to renovate and add additions to adequacy for 467 students, grades K-5. |
$7,987,243 | 72% | 28% | $575,081 | $223,643 | |||
| 11 | Standards | Roswell | Berrendo Elementary School | Project DescriptionPlanning and design to renovate and add additions to adequacy for 564 students, grades K-5 |
$9,880,371 | 72% | 28% | $711,387 | $276,650 | |||
| 11 | Standards | Roswell | Military Heights Elementary School | Project DescriptionPlanning and design to renovate and add additions to adequacy for 443 students, grades K-5 |
$7,411,839 | 72% | 28% | $533,652 | $207,531 | |||
| 11 | Standards | Roswell | El Capitan Elementary School | Project DescriptionPlanning and design to replace the existing facilities to adequacy for 446 students, grades K-5. |
$16,969,694 | 72% | 28% | $1,221,818 | $475,151 | |||
| 10 | Standards | Fort Sumner | Fort Sumner Combined School | Project DescriptionThis award amends the previous 2007-2008 award to renovate/remodel existing campus to adequacy for grades K-12 with a design capacity of 316. This award is for Phase 3 renovations for the Middle School and Elementary School. Award includes an advance of $800,000 which shall be repaid by June 30, 2011, and an additional partial reduction adjustment to the local match of $1,810,455, which shall be reduced by any additional non-PSCOC grants received by the district to meet adequacy. The district shall continue to advance use of FIMS and work with PSFA staff and REC support to develop and implement meaningful measures helpful to enhancing maintenance at the district. |
$5,929,500 | 51% | 49% | $3,024,045 | $2,905,455 | |||
| 10 | Standards | Gadsden | Anthony Elementary School | Project DescriptionThe district's application for this project has been deferred due to contingencies not being met for the 2009-10 award cycle. The Council may approve an out-ofcycle award pending availability of funds and all contingencies being met. District shall continue to advance use of FIMS working with PSFA staff to fully implement meaningful measures helpful to enhancing maintenance at the district. |
$13,400,000 | 89% | 11% | $0 | $0 | |||
| 10 | Standards | Gallup | Thoreau Middle School | Project DescriptionThis award amends the previous 2008-2009 award to provide for construction funds for renovation/addition to the existing Thoreau MS for a design capacity of 300 students, grades 6-8. District shall continue to advance use of FIMS working with PSFA staff to fully implement meaningful measures helpful to enhancing maintenance at the district. Processing of new work order requests must be addressed in a more timely manner. The district must also increase the types of PM schedules in PMD to a minimum of 10 to address equipment at all schools in the district. The district shall demonstrate an inclusion of all schools in their preventive maintenance program. |
$11,500,000 | 84% | 16% | $9,660,000 | $1,840,000 | |||
| 10 | Standards | Las Cruces | New Las Cruces High School 2009 | Project DescriptionThis award amends the previous 2005-2006 and 2006-2007 awards to provide for remainder of construction funds to construct a new high school for a design capacity of 2,000 students, grades 9-12. State share amount includes restoring $536,000 in project funding which was reauthorized to the Camino Real MS project in 2007-2008. District shall continue to advance use of FIMS working with PSFA staff to fully implement meaningful measures helpful to enhancing maintenance at the district. The district must also increase the types of PM schedules in PMD to a minimum of 10 focused on facilities and the classroom environment. |
$71,162,866 | 67% | 33% | $47,856,251 | $23,306,615 | |||
| 10 | Standards | Las Cruces | Camino Real Middle School | Project DescriptionThis award amends the previous 2007-2008 and 2008-2009 awards to provide for remainder of construction funds to construct a new middle school for a design capacity of 900 students, grades 6-8. District shall continue to advance use of FIMS working with PSFA staff to fully implement meaningful measures helpful to enhancing maintenance at the district. The district must also increase the types of PM schedules in PMD to a minimum of 10 focused on facilities and the classroom environment. |
$30,894,926 | 67% | 33% | $20,699,600 | $10,195,326 | |||
| 10 | Standards | Moriarty | Moriarty Middle School | Project DescriptionThe district's application for this project has been deferred due to contingencies not being met for the 2009-10 award cycle. Contingent upon finalization of design capacity based on projected enrollment, the Council may approve an outof- cycle award pending availability of funds. District shall continue to advance use of FIMS working with PSFA staff to fully implement meaningful measures helpful to enhancing maintenance at the district. |
$15,156,754 | 65% | 35% | $0 | $0 | |||
| 10 | Standards | Taos | Anansi Charter School | Project DescriptionThis award amends the previous 2008-2009 out-of-cycle award of $300,000 to purchase and equip a modular building to provide additions and renovations to meet adequacy standards for a design capacity of 120 students, grades K-5. Award is for additional lease payments under lease-purchase agreement for leasehold improvements to be utilized within 1 year, and an amortization schedule with as short a term as possible shall be submitted to the Awards Subcommittee for approval. District shall update its PM Plan to incorporate the charter schools as part of the maintenance program. District must also continue to advance its use of FIMS working with PSFA staff to develop and implement meaningful measures helpful to enhancing maintenance at the district. |
$3,094,377 | 14% | 86% | $433,213 | $2,661,164 | |||
| 10 | Standards | Tucumcari | Tucumcari High School | Project DescriptionThis award amends the previous 2007-2008 and 2008-2009 awards to provide for remainder of construction funds to remodel and construct new classroom/support facilities at the high school for a design capacity of 335, grades 9-12. PSCOC agrees to advance $2,265,075 toward the local match of which $625,075 is to be repaid by December 31, 2010 and the balance by June 30, 2011. District shall continue to advance use of FIMS working with PSFA staff to develop and implement meaningful measures helpful to enhancing maintenance at the district. |
$14,239,967 | 75% | 25% | $10,679,975 | $3,559,992 | |||
| 10 | Standards | Eunice | Mettie Jordan Elementary School | Project DescriptionThis award is for educational specifications, planning and design to replace existing school for a design capacity of 300 students, grades K-5. The Council may approve an out-of-cycle award pending availability of funds. The district shall continue to advance use of FIMS working with PSFA staff to develop and implement meaningful measures helpful to enhancing maintenance at the district. |
14 | $12,500,000 | 10% | 90% | $125,000 | $1,125,000 | ||
| 10 | Standards | Eunice | Caton Middle School | Project DescriptionThis award is for educational specifications, planning and design to replace existing school for a design capacity of 160 students, grades 6-8. The Council may approve an out-of-cycle award pending availability of funds. The district shall continue to advance use of FIMS working with PSFA staff to develop and implement meaningful measures helpful to enhancing maintenance at the district. |
39 | $9,000,000 | 10% | 90% | $90,000 | $810,000 | ||
| 10 | Standards | Farmington | Tibbetts Middle School | Project DescriptionThis award is for educational specifications, planning and design to replace existing school with a design capacity of 650 students, grades 6-8. The district shall continue to advance use of FIMS and establish target dates for maintenance goals listed in its recently updated PM Plan. |
49 | $34,000,000 | 59% | 41% | $973,500 | $676,500 | ||
| 10 | Standards | Gallup | Crownpoint Elementary School | Project DescriptionThis award is for educational specifications, planning and design to replace existing school with a design capacity of 260 students, grades K-5. District shall continue to advance use of FIMS working with PSFA staff to fully implement meaningful measures helpful to enhancing maintenance at the district. Processing of new requests must be addressed in a more timely manner. The district shall also increase the types of PM schedules in PMD to a minimum of 10 to address equipment at all schools in the district. The district shall demonstrate an inclusion of all schools in their preventive maintenance program. |
9 | $10,843,560 | 84% | 16% | $1,078,343 | $205,399 | ||
| 10 | Standards | Grants | Cubero Elementary School | Project DescriptionThis award is for educational specifications to renovate/replace existing school facilities to adequacy for a design capacity of 250 students, grades K-6. District shall update its PM Plan prior to September 30, 2009 and continue to advance use of FIMS working with PSFA staff to fully implement meaningful measures helpful to enhancing maintenance at the district. |
70 | $7,500,000 | 81% | 19% | $22,584 | $5,297 | ||
| 10 | Standards | Hobbs | Hobbs High School | Project DescriptionThis award is for planning, design and construction of a new cafeteria for a design capacity of 1,700 students, grades 10-12 and central kitchen. Award also includes planning & design for Phase II and III renovations and improvements. Award of additional square footage for central kitchen at the high school requires permanent variance of full service kitchen square footage requirements at all school facilities district-wide in the Facilities Assessment Database. The district shall continue to advance use of FIMS working with PSFA staff to implement meaningful measures helpful to enhancing maintenance at the district. |
17 | $26,316,381 | 56% | 44% | $5,040,000 | $3,960,000 | ||
| 10 | Standards | Las Cruces | Loma Heights Elementary School | Project DescriptionThis award is for educational specifications, planning and design to renovate and make additions at existing school for a design capacity of 600 students, grades (K-5). Award for increase in capacity contingent upon demonstration of need by district-wide utilization study of elementary schools. District shall continue to advance use of FIMS working with PSFA staff to fully implement meaningful measures helpful to enhancing maintenance at the district. The district must also increase the types of PM schedules in PMD to a minimum of 10 focused on facilities and the classroom environment. |
3 | $11,116,706 | 67% | 33% | $744,819 | $366,851 | ||
| 10 | Standards | Los Alamos | Los Alamos High School | Project DescriptionThis award is for educational specifications, planning and design to replace B, C & D wings, and renovations/improvements to media center and gymnasium. Award is based on design capacity of 1,200 students, grades 9-12. The Council may approve an out-of-cycle award pending availability of funds. The district shall continue to advance its use of FIMS working with PSFA staff to develop and implement meaningful measures helpful to enhancing maintenance at the district. The district must also develop and implement documented policies and procedures to support its PM Program. |
23 | $27,222,000 | 28% | 72% | $495,320 | $1,273,680 | ||
| 10 | Standards | Los Lunas | Bosque Farms Elementary School | Project DescriptionThis award is for planning, design and construction of renovations and new additions to adequacy for a design capacity of 500 students, grades K-6. The district shall continue to advance its use of FIMS working with PSFA staff to develop and implement meaningful measures helpful to enhancing maintenance at the district. |
34 | $14,207,508 | 81% | 19% | $11,508,081 | $2,699,427 | ||
| 10 | Standards | Roswell | Missouri Avenue Elementary School | Project DescriptionThis award is for educational specifications, planning, design and construction to renovate/replace existing school with a design capacity of 375 students (K-5). Design must address proposed site limitations. The district must address and resolve the excessive backlog of PM work orders (220) and continue to advance use of FIMS working with PSFA staff to develop and implement meaningful measures helpful to enhancing maintenance at the district. Facility equipment shall be linked to preventive maintenance schedules for all district schools. The district must also increase the types of PM schedules in PMD to a minimum of 10 focused on facilities and the classroom environment. The district shall submit a management plan outlining concurrent development of all projects. |
1 | $14,148,862 | 72% | 28% | $10,187,181 | $3,961,681 | ||
| 10 | Standards | Roswell | East Grand Plains Elementary School | Project DescriptionThis award is for educational specifications (utilization only), planning and design to bring existing school to adequacy with a design capacity of 275 students (K-5). The district must address and resolve the excessive backlog of PM work orders (220) and continue to advance use of FIMS working with PSFA staff to develop and implement meaningful measures helpful to enhancing maintenance at the district. Facility equipment shall be linked to preventive maintenance schedules for all district schools. The district must also increase the types of PM schedules in PMD to a minimum of 10 focused on facilities and the classroom environment. The district shall submit a management plan outlining concurrent development of all projects. |
4 | $7,380,222 | 72% | 28% | $531,376 | $206,646 | ||
| 10 | Standards | Roswell | Monterrey Elementary School | Project DescriptionThis award is for educational specifications (utilization only), planning and design to bring existing school to adequacy with a design capacity of 450 students (K-5). The district must address and resolve the excessive backlog of PM work orders (220) and continue to advance use of FIMS working with PSFA staff to develop and implement meaningful measures helpful to enhancing maintenance at the district. Facility equipment shall be linked to preventive maintenance schedules for all district schools. The district must also increase the types of PM schedules in PMD to a minimum of 10 focused on facilities and the classroom environment. The district shall submit a management plan outlining concurrent development of all projects. |
5 | $8,602,500 | 72% | 28% | $619,380 | $240,870 | ||
| 10 | Standards | Roswell | Pecos Elementary School | Project DescriptionThis award is for educational specifications (utilization only), planning and design to bring existing school to adequacy with a design capacity of 450 students (K-5). The district must address and resolve the excessive backlog of PM work orders (220) and continue to advance use of FIMS working with PSFA staff to develop and implement meaningful measures helpful to enhancing maintenance at the district. Facility equipment shall be linked to preventive maintenance schedules for all district schools. The district must also increase the types of PM schedules in PMD to a minimum of 10 focused on facilities and the classroom environment. The district shall submit a management plan outlining concurrent development of all projects. |
8 | $7,642,760 | 72% | 28% | $550,279 | $213,997 | ||
| 10 | Standards | Texico | Texico Combined School | Project DescriptionThis award is for planning, design and construction to bring existing schools to adequacy with a design capacity of 560 students (K-12). The district shall continue to advance use of FIMS working with PSFA staff and REC Support to develop and implement meaningful measures helpful to enhancing maintenance at the district. |
109 | $6,278,495 | 63% | 37% | $3,955,452 | $2,323,043 | ||
| 9 | Standards | Belen | Infinity High School | Project DescriptionThis award modifies the previous 2006-2007 award to provide for design and construction of a replacement facility, for a capacity of 75 students, serving grades 9-12, to support the programmatic and educational functions as funded through the Public Education Department. Design will not begin until educational specifications, with utilization, is completed and determined to be consistent with standards. If the district declines its previous 2006-2007 Standards-Based Roof Award due to the work being completed through insurance claim, an offset of $549,749 will be applicable to this project. The district is required to update its PM plan prior to Oct 1, 2008; work with contractor to complete Phase II of equipment inventory; and document district utility cost and consumption data in FIMS UD. |
$5,690,577 | 69% | 31% | $1,963,249 | $882,039 | |||
| 9 | Standards | Cobre | Hurley Elem | Project DescriptionThis Award modifies the previous 2007-2008 award to provide construction funding to renovate the existing Hurley ES for a capacity of 190 students, serving grades K- 6. PSCOC agrees to advance $2,352,709 toward the local match to be repaid within 1 year of this award. The District is required to update its PM plan prior to Oct 1, 2008; complete the equipment inventory; continue progress with preventive maintenance program and FIMS with minimum 10 equipment types scheduled in PMD prior to Jan 1, 2009. |
$5,738,315 | 59% | 41% | $3,385,606 | $2,352,709 | |||
| 9 | Standards | Gadsden | Gadsden High School | Project DescriptionThis award modifies the previous 2006-2007 & 2007-2008 awards to provide for the design of the entire Gadsden HS project for a student capacity of 1850, and the construction of the Trade/Music Bldg. (Career Pathways) Phase. The construction of the Trade/Music Bldg. (including demolition of the existing) will not proceed until the educational specification, which shall include complete campus utilization, is completed and determined to be consistent with standards. The design goal for the entire campus will be 150 sq. ft. per student. The district is required to update its PM plan prior to Oct 1, 2008 and then execute the PM plan and make continued effective use of FIMS. |
$14,573,862 | 88% | 12% | $12,824,999 | $1,748,863 | |||
| 9 | Standards | Gallup | Hiroshi Miyamura High School | Project DescriptionThis Award modifies the previous 2007-2008 award to provide for construction funding to replace/renovate existing JHS and convert to a second HS with a design capacity of 1,200 serving grades 9-12 . The district is encouraged to complete an inventory of current furniture, fixtures and equipment that may be included in this project. The district is required to complete its FIMS equipment inventory; continue to execute its PM plan; and make effective use of FIMS. |
$42,720,447 | 83% | 17% | $35,457,971 | $7,262,476 | |||
| 9 | Standards | Jemez Valley | San Diego Riverside | Project DescriptionThis award modifies and extends the previous 2004-2005 award to relocate the San Diego Riverside Charter School to an existing facility offered by the school district to accommodate 105 students, serving grades K-8. Upon acceptance, the charter school will work with PSFA to identify deficiencies and make necessary renovations to fulfill the Charter agreement. Alternately, if the Charter school elects to remain at their existing facilities, all required corrections necessary to fulfill the charter agreement will be the responsibility of the facility landlord. The existing DCP funds in the amount of $330,000 and the state's previous award of $990,000 (total of $1,320,000) can be used toward making these corrections at either location. This award is contingent upon the required match by the Charter School or Tribal landlord being available by December 31, 2008. Before design may proceed, the district facility master plan must be updated to incorporate the charter school & district's agreement with this award. In either case, the charter school agrees to maintain the facilities and provide written procedures for preventive maintenance that must be implemented prior to Jan 1, 2009. |
$2,933,333 | 45% | 55% | $1,320,000 | $1,613,333 | |||
| 9 | Standards | Las Cruces | Camino Real Middle | Project DescriptionThis Award modifies the previous 2007-2008 award to provide for design and construction manager-at-risk through completion of design and agreement of Guaranteed Maximum Price only. Any early work construction funding must be brought to the Council for out-of-cycle consideration. The middle school is to accommodate a design capacity of 900 serving grades 6-8 with a design goal of 132 sq.ft. per student. The district is required to update its PM plan prior to Oct 1, 2008; execute the PM plan, continue use of FIMS MD and UD, and make better use of PMD by implementing PM schedules for facility equipment prior to Jan 1, 2009. |
$5,401,631 | 67% | 33% | $3,619,093 | $1,782,538 | |||
| 9 | Standards | Los Lunas | Katherine Gallegos Elem | Project DescriptionThis Award modifies the previous 2007-2008 award to provide for construction of a classroom addition to bring the existing Katherine Gallegos to a design capacity for 500 students, serving grades K-6 . The district is required to continue to execute their PM plan and make effective use of FIMS. |
$5,517,151 | 78% | 22% | $4,303,378 | $1,213,773 | |||
| 9 | Standards | Raton | Raton High | Project DescriptionThis Award modifies the previous 2007-2008 award to provide for construction funds to renovate the existing Raton HS with a design capacity of 395, serving grades 9-12. The district is required to continue to execute the PM Plan and make effective use of FIMS. |
$6,848,147 | 67% | 33% | $4,588,258 | $2,259,889 | |||
| 9 | Standards | Tucumcari | Tucumcari High | Project DescriptionThis Award modifies the previous 2007-2008 award to provide construction funding to complete Phase 1 and design funds through Construction Documents for Phase 2 for a design capacity of 335, serving grades 9-12. The district is required to continue to execute their PM plan and make effective use of FIMS. |
$2,300,000 | 75% | 25% | $1,725,000 | $575,000 | |||
| 9 | Standards | Albuquerque | Ventana Elementary School | Project DescriptionAward is for design and construction funds for the new Tierra Antigua ES (NWES Prototype 1) to relieve overcrowding at the existing Ventana Ranch ES with a design capacity of 650 students, serving grades K-5. The state's match of $8,486,281 will be applied toward the district's advance for its two new high schools and direct appropriation offset. The district is required to update its PM plan prior to Oct 1, 2008; execute their updated PM plan, continue to use FIMS MD and UD, and make improved use of FIMS PMD, with a minimum 10 equipment types prior to Jan 1, 2009. |
1 | $16,999,762 | 52% | 48% | $8,486,281 | $7,833,491 | ||
| 9 | Standards | Albuquerque | Ventana Elementary School | Project DescriptionAward is for design and construction funds for the new Sunset View ES (NWES Prototype 2) to relieve overcrowding at the existing Ventana Ranch ES with a design capacity of 650 students, serving grades K-5. The state's match of $8,485,983 will be applied toward the district's advance for its two new high schools and direct appropriation offset. The district is required to update its PM plan prior to Oct 1, 2008; execute their updated PM plan, continue to use FIMS MD and UD, and make improved use of FIMS PMD, with a minimum 10 equipment types prior to Jan 1, 2009. |
1 | $16,999,166 | 52% | 48% | $8,485,983 | $7,833,216 | ||
| 9 | Standards | Albuquerque | Susie R. Marmon Elementary School | Project DescriptionAward is for design and construction funds to replace the existing modular school with a new permanent facility. The state's match of $10,825,353 will be applied toward the district's advance for its two new high schools and direct appropriation offset. The district is required to update its PM plan prior to Oct 1, 2008; execute their updated PM plan, continue to use FIMS MD and UD, and make improved use of FIMS PMD, with a minimum 10 equipment types prior to Jan 1, 2009. |
4 | $23,131,096 | 52% | 48% | $10,825,353 | $9,992,633 | ||
| 9 | Standards | Albuquerque | Adobe Acres Elementary School | Project DescriptionAward is for design and construction funds for the new SWES (Prototype 3) to relieve overcrowding at the existing Adobe Acres ES with a design capacity of 650 students, serving grades K-5. The state's match of $8,486,039 will be applied toward the district's advance for its two new high schools and direct appropriation offset. The district is required to update its PM plan prior to Oct 1, 2008; execute their updated PM plan, continue to use FIMS MD and UD, and make improved use of FIMS PMD, with a minimum 10 equipment types prior to Jan 1, 2009. |
5 | $16,999,277 | 52% | 48% | $8,486,039 | $7,833,267 | ||
| 9 | Standards | Albuquerque | Georgia O'Keefe Elementary School | Project DescriptionAward is for design and construction funds to replace the existing modular school with a new permanent facility. The state's match of $9,918,152 will be applied toward the district's advance for its two new high schools and direct appropriation offset. The district is required to update its PM plan prior to Oct 1, 2008; execute their updated PM plan, continue to use FIMS MD and UD, and make improved use of FIMS PMD, with a minimum 10 equipment types prior to Jan 1, 2009. |
10 | $21,478,589 | 52% | 48% | $9,918,152 | $9,155,217 | ||
| 9 | Standards | Albuquerque | Edward Gonzales | Project DescriptionAward is for design and construction funds for the new Helen Cordero Primary School to relieve overcrowding at the existing Edward Gonzales Elementary with a design capacity of 650 students, serving grades K-2. The state's match of $11,133,677 will be applied toward the district's advance for its two new high schools and direct appropriation offset. The district is required to update its PM plan prior to Oct 1, 2008; execute their updated PM plan, continue to use FIMS MD and UD, and make improved use of FIMS PMD, with a minimum 10 equipment types prior to Jan 1, 2009. |
12 | $22,303,040 | 52% | 48% | $11,133,677 | $10,277,241 | ||
| 9 | Standards | Albuquerque | James Monroe Middle School | Project DescriptionAward is for design and construction funds to build the new NWMS to relieve overcrowding at the existing James Monroe Middle School. The state's match of $18,238,613 will be applied toward the district's advance for its two new high schools and direct appropriation offset. The district is required to update its PM plan prior to Oct 1, 2008; execute their updated PM plan, continue to use FIMS MD and UD, and make improved use of FIMS PMD, with a minimum 10 equipment types prior to Jan 1, 2009. |
63 | $38,971,394 | 52% | 48% | $18,238,613 | $16,835,642 | ||
| 9 | Standards | Bernalillo | Roosevelt Elementary School | Project DescriptionAward is for design & construction for a new 3,4,5 elementary for a capacity of 390 students. This project is contingent upon the district keeping the playground and supporting spaces on the east side of the of the ditch/acequia, and work with PSFA to resolve the traffic issues accessing the new school. The district is required to update its PM Plan prior to Oct 1, 2008; execute their updated Pm plan; continue progress with preventive maintenance program and FIMS MD & PMD, with a minimum of 10 equipment types in PMD prior to Jan 1, 2009; and document district utility cost and consumption data in FIMS UD. |
51 | $16,385,587 | 53% | 47% | $8,518,917 | $7,554,511 | ||
| 9 | Standards | Bernalillo | Willanna D. Carroll Elementary School | Project DescriptionAward is for planning and design only with an emphasis to renovate the existing Carroll ES for a design capacity of 528, serving grades K-2. This award is contingent upon the district working with PSFA to identify specific buildings that will be demolished once the Roosevelt students are moved to the existing Carroll ES. The district is required to update its PM Plan prior to Oct 1, 2008; execute their updated PM plan; continue to use FIMS MD and UD, and continue progress with preventive maintenance program and FIMS MD & PMD, with a minimum of 10 equipment types in PMD prior to Jan 1, 2009; and document district utility cost and consumption data in FIMS UD. |
74 | $904,927 | 53% | 47% | $479,611 | $425,316 | ||
| 9 | Standards | Carlsbad | Jefferson Montessori Academy | Project DescriptionAward is for upgrades to Eisenhower to accommodate Jefferson Montessori Academy charter school for a design capacity of 82 serving grades K-12. Maintenance procedures for the charter school facility are already included in the Carlsbad PM plan, which is required to be updated prior to Oct 1, 2008. |
54 | $1,280,333 | 16% | 84% | $204,853 | $1,075,480 | ||
| 9 | Standards | Central | Natanni Nez Elementary School | Project DescriptionAward is for planning & design funds only with an emphasis on renovation of the existing Natanni Nez ES for a design capacity of 350, serving grades K-3. The district is required to continue execution of their PM plan and make effective use of FIMS. |
90 | $1,114,842 | 64% | 36% | $713,499 | $401,343 | ||
| 9 | Standards | Cimarron | Moreno Valley High School | Project DescriptionAward is for an approximately 4,000 square foot facility for a design capacity of 83, serving grades 9-12, that includes a multi-purpose, warming kitchen, storage, and related site work. Project is to be phased with Phase I as design only; Phase II construction funding may be funded upon approval of Awards Subcommittee. Phase I approval is contingent upon project design within adequacy and full facility master plan, including utilization calculations, for ultimate school build-out. The charter is required to establish written procedures for preventive maintenance and implement prior to Jan 1, 2009. All improvements must be made on charter school owned land. |
77 | $2,170,601 | 10% | 90% | $147,500 | $1,327,500 | ||
| 9 | Standards | Clovis | James Bickley Elementary School | Project DescriptionAward is for design funds only to renovate the existing elementary to adequacy for a capacity of 400, serving grades K-6. The district is required to continue execution of their PM plan and make effective use of FIMS. |
29 | $734,727 | 80% | 20% | $587,782 | $146,945 | ||
| 9 | Standards | Clovis | Lockwood Elementary School | Project DescriptionAward is for design funds only to renovate the existing elementary to adequacy for a capacity of 371, serving grades K-6. The district is required to continue execution of their PM plan and make effective use of FIMS. |
32 | $814,123 | 80% | 20% | $651,298 | $162,825 | ||
| 9 | Standards | Clovis | Marshall Junior High School | Project DescriptionAward is for design funds only to renovate the existing JHS to adequacy for a capacity of 590, serving grades 7-8. The district is required to continue execution of their PM plan and make effective use of FIMS. |
73 | $498,845 | 80% | 20% | $399,076 | $99,769 | ||
| 9 | Standards | Clovis | Bella Vista Elementary School | Project DescriptionAward is for design funds only to renovate the existing elementary to adequacy for a capacity of 440, serving grades K-6. The district is required to continue execution of their PM plan and make effective use of FIMS. |
85 | $942,741 | 80% | 20% | $754,193 | $188,548 | ||
| 9 | Standards | Cobre | Central Elementary School | Project DescriptionAward is for design funds only with emphasis on renovating the existing facility for a capacity of 290, serving grades K-6. District is required to update their PM plan prior to Oct 1, 2008; complete equipment inventory; execute their updated PM plan; continue progress with preventive maintenance program and FIMS with a minimum of 10 equipment types scheduled in PMD prior to Jan 1, 2009. PSCOC agrees to advance $240,000 toward local match to be repaid within 1 year of this award. |
53 | $600,000 | 60% | 40% | $360,000 | $240,000 | ||
| 9 | Standards | Gadsden | Anthony Elementary School | Project DescriptionAward is for planning and design only to bring the existing facilities at Anthony ES to adequacy for a capacity of 550 students, serving grades K-6. The district is required to update their PM plan prior to Oct 1, 2008; to execute the updated PM plan; and make continued effective use of FIMS. |
37 | $1,260,014 | 89% | 11% | $1,121,412 | $138,602 | ||
| 9 | Standards | Gadsden | Anthony | Project DescriptionThis award modifies the previous 2007-2008 award for the New Anthony-Berino ES to construct additional classrooms to accommodate students relocated from the existing Anthony ES, for a total school design capacity of 550, serving grades K-6. State/Local match percentages will be at the 2007-2008 rates. The district is required to update their PM plan prior to Oct 1, 2008; execute the updated PM plan; and make continued effective use of FIMS. |
$2,300,000 | 88% | 12% | $2,024,000 | $276,000 | |||
| 9 | Standards | Gallup | Thoreau Middle School | Project DescriptionAward is for design monies only to renovate the existing Thoreau MS to adequacy for a student capacity of 300, serving grades 6-8. The district is required to complete equipment inventory; continue to execute their PM plan; and make effective use of FIMS. |
15 | $500,000 | 84% | 16% | $420,000 | $80,000 | ||
| 9 | Standards | Moriarty | Moriarty Middle School | Project DescriptionAward is for design funds to renovate or replace the existing middle school with an emphasis on renovation with a student capacity of 300, serving grades 7-8. Student enrollment must be verified through submission to PSFA of a new/updated facilities master plan, prior to funds being released. The district's $680,000 offset will be held in abeyance until a future construction award. The district is required to continue to execute its PM plan and make effective use of FIMS, including utility data in UD. |
23 | $1,967,012 | 65% | 35% | $1,278,558 | $668,454 | ||
| 9 | Standards | Peñasco | Penasco Junior High School | Project DescriptionAward is for design & construction to renovate the existing Penasco JHS (7-8th) for a capacity of 90 students. Before design begins, the educational specification must be completed and determined to be consistent with standards, including a utilization analysis of the entire JHS & HS population/facilities. Before all but the cafeteria corrections begin, the drainage issues on the campus must be resolved. The required local match must be in place prior to bidding each phase of construction. At the future completion of all renovations to the JHS, the JHS & HS will be combined for purposes of the FAD and ranked together. The district is required to continue to execute its PM plan and make effective use of FIMS. |
95 | $6,239,658 | 76% | 24% | $4,742,140 | $1,497,518 | ||
| 9 | Standards | Raton | Longfellow Elementary School | Project DescriptionAward is for design only for: (1) a single new elementary school for a 630 student capacity, serving grades K-5, to consolidate and replace three current elementary schools with construction as each becomes eligible in subsequent award cycles, with initial classroom capacity of 230 serving grades K-1, or (2) renovations to the existing elementary for a 230 student capacity serving grades K-1. Before design funds are released, the facility master plan and educational specification must be updated to clearly reflect one of the above options with full community consensus. The district is required to continue to execute its PM Plan and make effective use of FIMS. |
92 | $1,697,303 | 68% | 32% | $1,154,166 | $543,137 | ||
| 9 | Standards | Socorro | Cottonwood Valley | Project DescriptionAward is for design and construction to provide a multipurpose building per the charter's presentation, that includes a restroom, storage, P.E. office, and warming kitchen totaling approximately 4,000 SF serving a capacity of 170, grades K-8 . The charter is encouraged to establish written procedures for preventive maintenance and implement them prior to Jan 1, 2009. |
11 | $1,000,000 | 77% | 23% | $770,000 | $230,000 | ||
| 25 | Lease Assistance | Albuquerque | Albuquerque Charter Academy | Project Description |
$212,727 | |||||||
| 25 | Lease Assistance | Aztec | Mosaic Academy Charter School | Project Description |
$146,808 | |||||||
| 25 | Lease Assistance | Albuquerque | Ace Leadership High School | Project Description |
$218,581 | |||||||
| 25 | Lease Assistance | Carlsbad | Jefferson Montessori Academy | Project Description |
$209,609 | |||||||
| 25 | Lease Assistance | Albuquerque | Aces Technical Charter School | Project Description |
$123,971 | |||||||
| 25 | Lease Assistance | Central | Dream Dine Charter School | Project Description |
$20,390 | |||||||
| 25 | Lease Assistance | Albuquerque | Albuquerque Aviation Academy | Project Description |
$248,350 | |||||||
| 25 | Lease Assistance | Cimarron | Moreno Valley High School | Project Description |
$40,780 | |||||||
| 25 | Lease Assistance | Albuquerque | Albuquerque Bilingual Academy | Project Description |
$303,811 | |||||||
| 25 | Lease Assistance | Deming | Deming Cesar Chavez Charter High School | Project Description |
$130,904 | |||||||
| 25 | Lease Assistance | Albuquerque | Albuquerque Collegiate Charter School | Project Description |
$151,702 | |||||||
| 25 | Lease Assistance | Española | Mccurdy Charter School | Project Description |
$446,541 | |||||||
| 25 | Lease Assistance | Albuquerque | Albuquerque Institute For Math & Science | Project Description |
$249,981 | |||||||
| 25 | Lease Assistance | Gallup | Dziå‚ Ditå‚'Ooã School Of Empowerment, Action, And Perseverance | Project Description |
$44,450 | |||||||
| 25 | Lease Assistance | Albuquerque | Albuquerque School Of Excellence | Project Description |
$398,013 | |||||||
| 25 | Lease Assistance | Gallup | Hozho Academy | Project Description |
$552,161 | |||||||
| 25 | Lease Assistance | Albuquerque | Albuquerque School Of Excellence | Project Description |
$353,155 | |||||||
| 25 | Lease Assistance | Gallup | Middle College High School | Project Description |
$26,969 | |||||||
| 25 | Lease Assistance | Albuquerque | Albuquerque Talent Development Academy | Project Description |
$106,028 | |||||||
| 25 | Lease Assistance | Gallup | Six Directions Indigenous School | Project Description |
$52,198 | |||||||
| 25 | Lease Assistance | Albuquerque | Alice King Community School | Project Description |
$332,765 | |||||||
| 25 | Lease Assistance | Albuquerque | Altura Preparatory School | Project Description |
$209,609 | |||||||
| 25 | Lease Assistance | Albuquerque | Amy Biehl High School | Project Description |
$168,014 | |||||||
| 25 | Lease Assistance | Albuquerque | Cesar Chavez Community School | Project Description |
$150,886 | |||||||
| 25 | Lease Assistance | Albuquerque | Christine Duncan'S Heritage Academy | Project Description |
$333,988 | |||||||
| 25 | Lease Assistance | Albuquerque | Cien Aguas International School | Project Description |
$342,552 | |||||||
| 25 | Lease Assistance | Albuquerque | Coral Community Charter School | Project Description |
$137,387 | |||||||
| 25 | Lease Assistance | Albuquerque | Corrales International School | Project Description |
$203,900 | |||||||
| 25 | Lease Assistance | Albuquerque | Cottonwood Classical Preparatory School | Project Description |
$648,402 | |||||||
| 25 | Lease Assistance | Albuquerque | Digital Arts And Technology Academy | Project Description |
$206,893 | |||||||
| 25 | Lease Assistance | Albuquerque | East Mountain High School | Project Description |
$326,648 | |||||||
| 25 | Lease Assistance | Moriarty | Estancia Valley Classical Academy | Project Description |
$480,388 | |||||||
| 25 | Lease Assistance | Albuquerque | El Camino Real Academy | Project Description |
$263,439 | |||||||
| 25 | Lease Assistance | Questa | Red River Valley Charter School | Project Description |
$64,432 | |||||||
| 25 | Lease Assistance | Albuquerque | Explore Academy | Project Description |
$729,962 | |||||||
| 25 | Lease Assistance | Questa | Roots & Wings Community School | Project Description |
$33,222 | |||||||
| 25 | Lease Assistance | Albuquerque | Explore Academy | Project Description |
$332,357 | |||||||
| 25 | Lease Assistance | Albuquerque | Gilbert L. Sena Charter High School | Project Description |
$120,709 | |||||||
| 25 | Lease Assistance | Albuquerque | Gordon Bernell Charter School | Project Description |
$154,556 | |||||||
| 25 | Lease Assistance | Albuquerque | Health Leadership High School | Project Description |
$183,918 | |||||||
| 25 | Lease Assistance | Albuquerque | Horizon Academy West | Project Description |
$374,768 | |||||||
| 25 | Lease Assistance | Albuquerque | La Academia De Esperanza* 89 Roswell D Sidney Gutierrez Middle School | Project Description |
$41,820 | |||||||
| 25 | Lease Assistance | Albuquerque | Los Puentes Charter School | Project Description |
$93,794 | |||||||
| 25 | Lease Assistance | Roswell | Sidney Gutierrez | Project Description |
$106,028 | |||||||
| 25 | Lease Assistance | Albuquerque | Mark Armijo Academy | Project Description |
$114,143 | |||||||
| 25 | Lease Assistance | Albuquerque | Mission Achievement And Success 1.0 | Project Description |
$853,525 | |||||||
| 25 | Lease Assistance | Albuquerque | Mission Achievement And Success 2.0 | Project Description |
$810,299 | |||||||
| 25 | Lease Assistance | Albuquerque | Montessori Of The Rio Grande | Project Description |
$178,616 | |||||||
| 25 | Lease Assistance | Albuquerque | Mountain Mahogany Community School | Project Description |
$105,996 | |||||||
| 25 | Lease Assistance | Albuquerque | Native American Community Academy 1000 Indian School 96 Santa Fe S Tierra Encantada Charter School | Project Description |
$218,989 | |||||||
| 25 | Lease Assistance | Albuquerque | Native American Community Academy 1100 Indian School 97 Santa Fe S Turquoise Trail Charter School | Project Description |
$503,633 | |||||||
| 25 | Lease Assistance | Albuquerque | Native American Community Academy Cnm | Project Description |
$132,127 | |||||||
| 25 | Lease Assistance | Silver | Aldo Leopold Charter School | Project Description |
$150,000 | |||||||
| 25 | Lease Assistance | Albuquerque | New Mexico Academy For The Media Arts | Project Description |
$101,233 | |||||||
| 25 | Lease Assistance | Socorro | Cottonwood Valley Charter School | Project Description |
$121,275 | |||||||
| 25 | Lease Assistance | Albuquerque | New Mexico International School | Project Description |
$325,424 | |||||||
| 25 | Lease Assistance | Taos | Anansi Charter School | Project Description |
$161,081 | |||||||
| 25 | Lease Assistance | Albuquerque | Northpoint Charter School | Project Description |
$117,039 | |||||||
| 25 | Lease Assistance | Taos | Taos Academy Charter School | Project Description |
$180,536 | |||||||
| 25 | Lease Assistance | Albuquerque | North Valley Academy | Project Description |
$191,870 | |||||||
| 25 | Lease Assistance | Taos | Taos Integrated School Of The Arts | Project Description |
$166,382 | |||||||
| 25 | Lease Assistance | Albuquerque | Public Academy For Performing Arts | Project Description |
$361,719 | |||||||
| 25 | Lease Assistance | Taos | Taos International School | Project Description |
$144,361 | |||||||
| 25 | Lease Assistance | Albuquerque | Renaissance Academy Charter School | Project Description |
$128,049 | |||||||
| 25 | Lease Assistance | Taos | Taos Municipal Charter School | Project Description |
$160,000 | |||||||
| 25 | Lease Assistance | Albuquerque | Rio Grande Academy Of Fine Arts | Project Description |
$111,329 | |||||||
| 25 | Lease Assistance | Taos | Vista Grande High School | Project Description |
$55,869 | |||||||
| 25 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter High School | Project Description |
$219,396 | |||||||
| 25 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter Middle School | Project Description |
$59,947 | |||||||
| 25 | Lease Assistance | Albuquerque | Solare Collegiate Charter School | Project Description |
$247,942 | |||||||
| 25 | Lease Assistance | Albuquerque | South Valley Academy | Project Description |
$492,622 | |||||||
| 25 | Lease Assistance | Albuquerque | Technology Leadership High School | Project Description |
$257,322 | |||||||
| 25 | Lease Assistance | Albuquerque | The Albuquerque Sign Language Academy | Project Description |
$120,301 | |||||||
| 25 | Lease Assistance | Albuquerque | The Great Academy | Project Description |
$81,560 | |||||||
| 25 | Lease Assistance | Albuquerque | The International School At Mesa Del Sol | Project Description |
$265,886 | |||||||
| 25 | Lease Assistance | Albuquerque | The Montessori Elementary & Middle School | Project Description |
$360,087 | |||||||
| 25 | Lease Assistance | Albuquerque | The New America School | Project Description |
$141,507 | |||||||
| 25 | Lease Assistance | Albuquerque | Tierra Adentro Of New Mexico | Project Description |
$201,045 | |||||||
| 25 | Lease Assistance | Albuquerque | 21St Century Public Academy | Project Description |
$307,073 | |||||||
| 25 | Lease Assistance | Albuquerque | Voz Collegiate Preparatory Charter School | Project Description |
$72,588 | |||||||
| 25 | Lease Assistance | Albuquerque | Albuquerque Charter Academy | Project Description |
$211,498 | |||||||
| 24 | Lease Assistance | Aztec | Mosaic Academy Charter School | Project Description |
$146,808 | |||||||
| 24 | Lease Assistance | Albuquerque | Ace Leadership High School | Project Description |
$193,297 | |||||||
| 24 | Lease Assistance | Carlsbad | Jefferson Montessori Academy | Project Description |
$201,453 | |||||||
| 24 | Lease Assistance | Albuquerque | Aces Technical Charter School | Project Description |
$130,088 | |||||||
| 24 | Lease Assistance | Central | Dream Dine Charter School | Project Description |
$21,263 | |||||||
| 24 | Lease Assistance | Albuquerque | Albuquerque Bilingual Academy | Project Description |
$300,956 | |||||||
| 24 | Lease Assistance | Cimarron | Moreno Valley High School | Project Description |
$42,411 | |||||||
| 24 | Lease Assistance | Albuquerque | Albuquerque Collegiate Charter School | Project Description |
$141,507 | |||||||
| 24 | Lease Assistance | Deming | Deming Cesar Chavez Charter High School | Project Description |
$122,340 | |||||||
| 24 | Lease Assistance | Albuquerque | Albuquerque Institute For Math & Science | Project Description |
$277,712 | |||||||
| 24 | Lease Assistance | Española | Mccurdy Charter School | Project Description |
$440,832 | |||||||
| 24 | Lease Assistance | Albuquerque | Albuquerque School Of Excellence | Project Description |
$349,485 | |||||||
| 24 | Lease Assistance | Gallup | Dziå‚ Ditå‚'Ooã School Of Empowerment, Action, And Perseverance | Project Description |
$37,925 | |||||||
| 24 | Lease Assistance | Albuquerque | Albuquerque School Of Excellence | Project Description |
$360,903 | |||||||
| 24 | Lease Assistance | Gallup | Hozho Academy | Project Description |
$490,991 | |||||||
| 24 | Lease Assistance | Albuquerque | Albuquerque Talent Development Academy | Project Description |
$117,854 | |||||||
| 24 | Lease Assistance | Gallup | Middle College High School | Project Description |
$26,969 | |||||||
| 24 | Lease Assistance | Albuquerque | Alice King Community School | Project Description |
$366,204 | |||||||
| 24 | Lease Assistance | Gallup | Six Directions Indigenous School | Project Description |
$57,908 | |||||||
| 24 | Lease Assistance | Albuquerque | Altura Preparatory School | Project Description |
$178,616 | |||||||
| 24 | Lease Assistance | Jemez Valley | San Diego Riverside Charter School | Project Description |
$50,975 | |||||||
| 24 | Lease Assistance | Albuquerque | Amy Biehl High School | Project Description |
$176,577 | |||||||
| 24 | Lease Assistance | Jemez Valley | Walatowa High Charter School | Project Description |
$32,624 | |||||||
| 24 | Lease Assistance | Albuquerque | Cesar Chavez Community School | Project Description |
$131,719 | |||||||
| 24 | Lease Assistance | Las Cruces | Alma D'Arte Charter High School | Project Description |
$102,358 | |||||||
| 24 | Lease Assistance | Albuquerque | Christine Duncan'S Heritage Academy | Project Description |
$305,034 | |||||||
| 24 | Lease Assistance | Las Cruces | Explore Academy | Project Description |
$147,216 | |||||||
| 24 | Lease Assistance | Albuquerque | Cien Aguas International School | Project Description |
$342,552 | |||||||
| 24 | Lease Assistance | Las Cruces | J. Paul Taylor Academy | Project Description |
$163,120 | |||||||
| 24 | Lease Assistance | Albuquerque | Coral Community Charter School | Project Description |
$137,387 | |||||||
| 24 | Lease Assistance | Las Cruces | La Academia Dolores Huerta | Project Description |
$55,053 | |||||||
| 24 | Lease Assistance | Albuquerque | Corrales International School | Project Description |
$200,230 | |||||||
| 24 | Lease Assistance | Las Cruces | Las Montanas Charter High School | Project Description |
$137,429 | |||||||
| 24 | Lease Assistance | Albuquerque | Cottonwood Classical Preparatory School | Project Description |
$612,108 | |||||||
| 24 | Lease Assistance | Las Cruces | Raices Del Saber Xinachtli Community School | Project Description |
$83,526 | |||||||
| 24 | Lease Assistance | Albuquerque | Digital Arts And Technology Academy | Project Description |
$206,894 | |||||||
| 24 | Lease Assistance | Las Cruces | The New America School | Project Description |
$119,893 | |||||||
| 24 | Lease Assistance | Albuquerque | East Mountain High School | Project Description |
$302,995 | |||||||
| 24 | Lease Assistance | Los Lunas | School Of Dreams Academy | Project Description |
$452,658 | |||||||
| 24 | Lease Assistance | Albuquerque | El Camino Real Academy | Project Description |
$278,527 | |||||||
| 24 | Lease Assistance | Moriarty | Estancia Valley Classical Academy | Project Description |
$506,488 | |||||||
| 24 | Lease Assistance | Albuquerque | Explore Academy | Project Description |
$641,877 | |||||||
| 24 | Lease Assistance | Questa | Red River Valley Charter | Project Description |
$57,092 | |||||||
| 24 | Lease Assistance | Albuquerque | Explore Academy | Project Description |
$306,258 | |||||||
| 24 | Lease Assistance | Questa | Roots & Wings Community School | Project Description |
$42,739 | |||||||
| 24 | Lease Assistance | Albuquerque | Gilbert L. Sena Charter High School | Project Description |
$115,000 | |||||||
| 24 | Lease Assistance | Rio Rancho | Explore Academy | Project Description |
$125,000 | |||||||
| 24 | Lease Assistance | Albuquerque | Gordon Bernell Charter School | Project Description |
$129,273 | |||||||
| 24 | Lease Assistance | Rio Rancho | Sandoval Academy Of Bilingual Education | Project Description |
$183,510 | |||||||
| 24 | Lease Assistance | Albuquerque | Health Leadership High School | Project Description |
$171,684 | |||||||
| 24 | Lease Assistance | Rio Rancho | The Ask Academy | Project Description |
$404,538 | |||||||
| 24 | Lease Assistance | Albuquerque | Horizon Academy West | Project Description |
$348,669 | |||||||
| 24 | Lease Assistance | Rio Rancho | The Ask Academy | Project Description |
$92,978 | |||||||
| 24 | Lease Assistance | Albuquerque | La Academia De Esperanza | Project Description |
$203,084 | |||||||
| 24 | Lease Assistance | Albuquerque | Los Puentes Charter School | Project Description |
$95,425 | |||||||
| 24 | Lease Assistance | Roswell | Sidney Gutierrez Middle School | Project Description |
$41,820 | |||||||
| 24 | Lease Assistance | Albuquerque | Mark Armijo Academy | Project Description |
$114,143 | |||||||
| 24 | Lease Assistance | Roswell | Sidney Gutierrez | Project Description |
$106,028 | |||||||
| 24 | Lease Assistance | Albuquerque | Mission Achievement And Success 2.0 | Project Description |
$703,863 | |||||||
| 24 | Lease Assistance | Santa Fe | Monte Del Sol Charter School | Project Description |
$253,752 | |||||||
| 24 | Lease Assistance | Albuquerque | Mission Achievement And Success 1.0 | Project Description |
$862,293 | |||||||
| 24 | Lease Assistance | Santa Fe | New Mexico School For The Arts | Project Description |
$264,662 | |||||||
| 24 | Lease Assistance | Albuquerque | Montessori Of The Rio Grande | Project Description |
$175,762 | |||||||
| 24 | Lease Assistance | Santa Fe | The Academy For Technology & The Classics | Project Description |
$253,841 | |||||||
| 24 | Lease Assistance | Albuquerque | Mountain Mahogany Community School | Project Description |
$105,996 | |||||||
| 24 | Lease Assistance | Santa Fe | The Masters Program | Project Description |
$122,433 | |||||||
| 24 | Lease Assistance | Albuquerque | Native American Community Academy 1000 Indian School 98 Santa Fe S Thrive Community School | Project Description |
$93,386 | |||||||
| 24 | Lease Assistance | Albuquerque | Native American Community Academy 1100 Indian School 99 Santa Fe S Tierra Encantada Charter School | Project Description |
$231,223 | |||||||
| 24 | Lease Assistance | Albuquerque | Native American Community Academy Cnm | Project Description |
$148,031 | |||||||
| 24 | Lease Assistance | Santa Fe | Turquoise Trail Charter School | Project Description |
$522,392 | |||||||
| 24 | Lease Assistance | Albuquerque | New Mexico Academy For The Media Arts | Project Description |
$123,000 | |||||||
| 24 | Lease Assistance | Albuquerque | New Mexico Academy For The Media Arts | Project Description |
$121,275 | |||||||
| 24 | Lease Assistance | Albuquerque | New Mexico International School | Project Description |
$318,084 | |||||||
| 24 | Lease Assistance | Taos | Anansi Charter School | Project Description |
$160,265 | |||||||
| 24 | Lease Assistance | Albuquerque | North Valley Academy | Project Description |
$180,536 | |||||||
| 24 | Lease Assistance | Albuquerque | North Valley Academy | Project Description |
$165,975 | |||||||
| 24 | Lease Assistance | Albuquerque | Public Academy For Performing Arts | Project Description |
$351,931 | |||||||
| 24 | Lease Assistance | Taos | Taos International School | Project Description |
$135,390 | |||||||
| 24 | Lease Assistance | Albuquerque | Rio Grande Academy Of Fine Arts | Project Description |
$63,617 | |||||||
| 24 | Lease Assistance | Taos | Taos Municipal Charter School | Project Description |
$160,000 | |||||||
| 24 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter High School | Project Description |
$236,932 | |||||||
| 24 | Lease Assistance | Taos | Vista Grande High School | Project Description |
$58,723 | |||||||
| 24 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter Middle School | Project Description |
$68,510 | |||||||
| 24 | Lease Assistance | West Las Vegas | Rio Gallinas School Of Ecology And The Arts | Project Description |
$48,000 | |||||||
| 24 | Lease Assistance | Albuquerque | Solare Collegiate Charter School | Project Description |
$224,290 | |||||||
| 24 | Lease Assistance | Albuquerque | South Valley Academy | Project Description |
$490,583 | |||||||
| 24 | Lease Assistance | Albuquerque | Southwest Aeronautics, Mathematics & Science Academy | Project Description |
$228,776 | |||||||
| 24 | Lease Assistance | Albuquerque | Southwest Preparatory Learning Center | Project Description |
$123,156 | |||||||
| 24 | Lease Assistance | Albuquerque | Southwest Secondary Learning Center | Project Description |
$119,893 | |||||||
| 24 | Lease Assistance | Albuquerque | Technology Leadership High School | Project Description |
$206,004 | |||||||
| 24 | Lease Assistance | Albuquerque | The Albuquerque Sign Language Academy | Project Description |
$101,950 | |||||||
| 24 | Lease Assistance | Albuquerque | The Great Academy | Project Description |
$101,950 | |||||||
| 24 | Lease Assistance | Albuquerque | The International School At Mesa Del Sol | Project Description |
$255,895 | |||||||
| 24 | Lease Assistance | Albuquerque | The Montessori Elementary & Middle School | Project Description |
$359,272 | |||||||
| 24 | Lease Assistance | Albuquerque | The New America School | Project Description |
$169,645 | |||||||
| 24 | Lease Assistance | Albuquerque | Tierra Adentro Of New Mexico | Project Description |
$196,152 | |||||||
| 24 | Lease Assistance | Albuquerque | 21St Century Public Academy | Project Description |
$316,045 | |||||||
| 24 | Lease Assistance | Albuquerque | Voz Collegiate Preparatory Charter School | Project Description |
$52,198 | |||||||
| 24 | Lease Assistance | Albuquerque | William W. & Josephine Dorn Community Charter School | Project Description |
$39,600 | |||||||
| 23 | Lease Assistance | Albuquerque | Albuquerque Charter Academy | Project Description |
$212,727 | |||||||
| 23 | Lease Assistance | Aztec | Mosaic Academy Charter School | Project Description |
$145,585 | |||||||
| 23 | Lease Assistance | Albuquerque | Ace Leadership High School | Project Description |
$165,159 | |||||||
| 23 | Lease Assistance | Carlsbad | Jefferson Montessori Academy | Project Description |
$190,443 | |||||||
| 23 | Lease Assistance | Albuquerque | Aces Technical Charter School | Project Description |
$52,198 | |||||||
| 23 | Lease Assistance | Central | Dream Dine Charter School | Project Description |
$18,708 | |||||||
| 23 | Lease Assistance | Albuquerque | Albuquerque Bilingual Academy | Project Description |
$288,315 | |||||||
| 23 | Lease Assistance | Cimarron | Moreno Valley High School | Project Description |
$49,752 | |||||||
| 23 | Lease Assistance | Albuquerque | Albuquerque Collegiate Charter School | Project Description |
$120,709 | |||||||
| 23 | Lease Assistance | Deming | Deming Cesar Chavez Charter High School | Project Description |
$123,156 | |||||||
| 23 | Lease Assistance | Albuquerque | Albuquerque Institute For Math & Science | Project Description |
$283,013 | |||||||
| 23 | Lease Assistance | Española | La Tierra Montessori School Of The Arts And Sciences | Project Description |
$66,879 | |||||||
| 23 | Lease Assistance | Albuquerque | Albuquerque School Of Excellence | Project Description |
$357,233 | |||||||
| 23 | Lease Assistance | Española | Mccurdy Charter School | Project Description |
$427,782 | |||||||
| 23 | Lease Assistance | Albuquerque | Albuquerque School Of Excellence | Project Description |
$327,871 | |||||||
| 23 | Lease Assistance | Gallup | Dzil Ditl'Ooi School Of Empowerment, Action & Perseverance | Project Description |
$39,557 | |||||||
| 23 | Lease Assistance | Albuquerque | Albuquerque Talent Development Academy | Project Description |
$90,532 | |||||||
| 23 | Lease Assistance | Gallup | Hozho Academy | Project Description |
$402,091 | |||||||
| 23 | Lease Assistance | Albuquerque | Alice King Community School | Project Description |
$348,261 | |||||||
| 23 | Lease Assistance | Gallup | Middle College High School | Project Description |
$26,969 | |||||||
| 23 | Lease Assistance | Albuquerque | Altura Preparatory School | Project Description |
$160,265 | |||||||
| 23 | Lease Assistance | Gallup | Six Directions Indigenous School | Project Description |
$55,053 | |||||||
| 23 | Lease Assistance | Albuquerque | Amy Biehl High School | Project Description |
$44,450 | |||||||
| 23 | Lease Assistance | Albuquerque | Amy Biehl High School | Project Description |
$32,624 | |||||||
| 23 | Lease Assistance | Albuquerque | Cesar Chavez Community School | Project Description |
$157,003 | |||||||
| 23 | Lease Assistance | Albuquerque | Christine Duncan'S Heritage Academy | Project Description |
$301,772 | |||||||
| 23 | Lease Assistance | Albuquerque | Cien Aguas International School | Project Description |
$338,474 | |||||||
| 23 | Lease Assistance | Albuquerque | Coral Community Charter School | Project Description |
$137,387 | |||||||
| 23 | Lease Assistance | Albuquerque | Corrales International School | Project Description |
$187,588 | |||||||
| 23 | Lease Assistance | Albuquerque | Cottonwood Classical Preparatory School | Project Description |
$620,672 | |||||||
| 23 | Lease Assistance | Albuquerque | Digital Arts And Technology Academy High School | Project Description |
$206,894 | |||||||
| 23 | Lease Assistance | Albuquerque | East Mountain High School | Project Description |
$296,471 | |||||||
| 23 | Lease Assistance | Albuquerque | El Camino Real Academy | Project Description |
$250,797 | |||||||
| 23 | Lease Assistance | Moriarty | Estancia Valley Classical Academy | Project Description |
$488,952 | |||||||
| 23 | Lease Assistance | Albuquerque | Explore Academy | Project Description |
$550,122 | |||||||
| 23 | Lease Assistance | Questa | Red River Valley Charter | Project Description |
$52,198 | |||||||
| 23 | Lease Assistance | Albuquerque | Explore Academy | Project Description |
$263,439 | |||||||
| 23 | Lease Assistance | Questa | Roots & Wings Community School | Project Description |
$41,188 | |||||||
| 23 | Lease Assistance | Albuquerque | Gilbert L. Sena Charter High School | Project Description |
$101,950 | |||||||
| 23 | Lease Assistance | Albuquerque | Gordon Bernell Charter School | Project Description |
$138,652 | |||||||
| 23 | Lease Assistance | Albuquerque | Health Leadership High School | Project Description |
$197,375 | |||||||
| 23 | Lease Assistance | Albuquerque | Horizon Academy West | Project Description |
$302,588 | |||||||
| 23 | Lease Assistance | Albuquerque | La Academia De Esperanza | Project Description |
$186,772 | |||||||
| 23 | Lease Assistance | Roswell | Sidney Gutierrez Middle School | Project Description |
$41,820 | |||||||
| 23 | Lease Assistance | Albuquerque | Los Puentes Charter School | Project Description |
$111,737 | |||||||
| 23 | Lease Assistance | Roswell | Sidney Gutierrez | Project Description |
$105,620 | |||||||
| 23 | Lease Assistance | Albuquerque | Mark Armijo Academy | Project Description |
$114,132 | |||||||
| 23 | Lease Assistance | Albuquerque | Mission Achievement And Success 2.0 | Project Description |
$448,268 | |||||||
| 23 | Lease Assistance | Albuquerque | Mission Achievement And Success 1.0 | Project Description |
$905,316 | |||||||
| 23 | Lease Assistance | Albuquerque | Montessori Of The Rio Grande | Project Description |
$174,538 | |||||||
| 23 | Lease Assistance | Albuquerque | Mountain Mahogany Community School | Project Description |
$105,996 | |||||||
| 23 | Lease Assistance | Albuquerque | Native American Community Academy 1000 Indian School 100 Santa Fe S Tierra Encantada Charter High School | Project Description |
$230,407 | |||||||
| 23 | Lease Assistance | Albuquerque | Native American Community Academy 1100 Indian School 101 Santa Fe S Turquoise Trail Charter School | Project Description |
$553,792 | |||||||
| 23 | Lease Assistance | Albuquerque | Native American Community Academy Cnm | Project Description |
$152,109 | |||||||
| 23 | Lease Assistance | Silver | Aldo Leopold Charter High School | Project Description |
$132,535 | |||||||
| 23 | Lease Assistance | Albuquerque | New Mexico Academy For The Media Arts 103 Socorro D Cottonwood Valley Charter School | Project Description |
$121,275 | |||||||
| 23 | Lease Assistance | Albuquerque | New Mexico Academy For The Media Arts 104 Taos D Anansi Charter School | Project Description |
$159,042 | |||||||
| 23 | Lease Assistance | Albuquerque | New Mexico International School | Project Description |
$319,307 | |||||||
| 23 | Lease Assistance | Taos | Taos Academy Charter School | Project Description |
$180,536 | |||||||
| 23 | Lease Assistance | Albuquerque | North Valley Academy | Project Description |
$162,304 | |||||||
| 23 | Lease Assistance | Albuquerque | North Valley Academy | Project Description |
$144,361 | |||||||
| 23 | Lease Assistance | Albuquerque | Public Academy For Performing Arts | Project Description |
$354,378 | |||||||
| 23 | Lease Assistance | Taos | Taos Municipal Charter School | Project Description |
$159,996 | |||||||
| 23 | Lease Assistance | Albuquerque | Rio Grande Academy Of Fine Arts | Project Description |
$67,695 | |||||||
| 23 | Lease Assistance | Taos | Vista Grande High School | Project Description |
$68,510 | |||||||
| 23 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter High School | Project Description |
$203,900 | |||||||
| 23 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter Middle School | Project Description |
$77,074 | |||||||
| 23 | Lease Assistance | Albuquerque | Siembra Leadership High School | Project Description |
$147,633 | |||||||
| 23 | Lease Assistance | Albuquerque | Solare Collegiate Charter School | Project Description |
$239,379 | |||||||
| 23 | Lease Assistance | Albuquerque | South Valley Academy | Project Description |
$493,030 | |||||||
| 23 | Lease Assistance | Albuquerque | Southwest Preparatory Learning Center | Project Description |
$127,641 | |||||||
| 23 | Lease Assistance | Albuquerque | Southwest Secondary Learning Center | Project Description |
$119,893 | |||||||
| 23 | Lease Assistance | Albuquerque | Technology Leadership High School | Project Description |
$206,004 | |||||||
| 23 | Lease Assistance | Albuquerque | The Albuquerque Sign Language Academy | Project Description |
$95,833 | |||||||
| 23 | Lease Assistance | Albuquerque | The Great Academy | Project Description |
$70,549 | |||||||
| 23 | Lease Assistance | Albuquerque | The International School At Mesa Del Sol | Project Description |
$245,903 | |||||||
| 23 | Lease Assistance | Albuquerque | The Montessori Elementary School | Project Description |
$358,456 | |||||||
| 23 | Lease Assistance | Albuquerque | The New America School | Project Description |
$154,964 | |||||||
| 23 | Lease Assistance | Albuquerque | Tierra Adentro Of New Mexico | Project Description |
$189,219 | |||||||
| 23 | Lease Assistance | Albuquerque | 21St Century Public Academy | Project Description |
$294,432 | |||||||
| 23 | Lease Assistance | Albuquerque | Voz Collegiate Preparatory Charter School | Project Description |
$32,624 | |||||||
| 23 | Lease Assistance | Albuquerque | William W. & Josephine Dorn Charter Community | Project Description |
$39,600 | |||||||
| 22 | Lease Assistance | Albuquerque | Albuquerque Charter Academy | Project Description |
$131,692 | |||||||
| 22 | Lease Assistance | Aztec | Mosaic Academy Charter School | Project Description |
$6,000 | |||||||
| 22 | Lease Assistance | Albuquerque | Ace Leadership High School | Project Description |
$159,689 | |||||||
| 22 | Lease Assistance | Aztec | Mosaic Academy Charter School | Project Description |
$59,760 | |||||||
| 22 | Lease Assistance | Albuquerque | Aces Technical Charter School | Project Description |
$34,301 | |||||||
| 22 | Lease Assistance | Carlsbad | Jefferson Montessori Academy | Project Description |
$187,130 | |||||||
| 22 | Lease Assistance | Albuquerque | Albuquerque Bilingual Academy | Project Description |
$285,459 | |||||||
| 22 | Lease Assistance | Cimarron | Moreno Valley High School | Project Description |
$45,333 | |||||||
| 22 | Lease Assistance | Albuquerque | Albuquerque Collegiate | Project Description |
$98,710 | |||||||
| 22 | Lease Assistance | Deming | Deming Cesar Chavez Charter High School | Project Description |
$99,853 | |||||||
| 22 | Lease Assistance | Albuquerque | Albuquerque Institute For Math & Science | Project Description |
$288,508 | |||||||
| 22 | Lease Assistance | Española | La Tierra Montessori School Of The Arts And Sciences | Project Description |
$41,542 | |||||||
| 22 | Lease Assistance | Albuquerque | Albuquerque School Of Excellence | Project Description |
$341,484 | |||||||
| 22 | Lease Assistance | Española | Mccurdy Charter School | Project Description |
$369,810 | |||||||
| 22 | Lease Assistance | Albuquerque | Albuquerque School Of Excellence | Project Description |
$310,994 | |||||||
| 22 | Lease Assistance | Gallup | Dzil Ditl'Ooi School Of Empowerment, Action & Perseverance | Project Description |
$30,451 | |||||||
| 22 | Lease Assistance | Albuquerque | Albuquerque Talent Development Academy | Project Description |
$84,609 | |||||||
| 22 | Lease Assistance | Gallup | Hozho Academy | Project Description |
$308,707 | |||||||
| 22 | Lease Assistance | Albuquerque | Alice King Community School | Project Description |
$352,536 | |||||||
| 22 | Lease Assistance | Gallup | Middle College High School | Project Description |
$26,969 | |||||||
| 22 | Lease Assistance | Albuquerque | Altura Preparatory School | Project Description |
$136,060 | |||||||
| 22 | Lease Assistance | Gallup | Six Directions Indigenous School | Project Description |
$57,930 | |||||||
| 22 | Lease Assistance | Albuquerque | Amy Biehl High School | Project Description |
$177,459 | |||||||
| 22 | Lease Assistance | Jemez Valley | V. San Diego Riverside Charter School | Project Description |
$38,156 | |||||||
| 22 | Lease Assistance | Albuquerque | Amy Biehl High School | Project Description |
$23,631 | |||||||
| 22 | Lease Assistance | Jemez Valley | V. Walatowa High Charter School | Project Description |
$40,018 | |||||||
| 22 | Lease Assistance | Albuquerque | Cesar Chavez Community School | Project Description |
$155,878 | |||||||
| 22 | Lease Assistance | Las Cruces | Alma D'Arte Charter High School | Project Description |
$100,997 | |||||||
| 22 | Lease Assistance | Albuquerque | Christine Duncan'S Heritage Academy | Project Description |
$298,417 | |||||||
| 22 | Lease Assistance | Las Cruces | Explore Academy | Project Description |
$67,077 | |||||||
| 22 | Lease Assistance | Albuquerque | Cien Aguas International School | Project Description |
$323,190 | |||||||
| 22 | Lease Assistance | Las Cruces | J. Paul Taylor Academy | Project Description |
$152,448 | |||||||
| 22 | Lease Assistance | Albuquerque | Coral Community Charter School | Project Description |
$111,578 | |||||||
| 22 | Lease Assistance | Las Cruces | La Academia Dolores Huerta | Project Description |
$54,881 | |||||||
| 22 | Lease Assistance | Albuquerque | Corrales International School | Project Description |
$189,036 | |||||||
| 22 | Lease Assistance | Las Cruces | Las Montanas Charter High School | Project Description |
$117,385 | |||||||
| 22 | Lease Assistance | Albuquerque | Cottonwood Classical Preparatory School | Project Description |
$588,068 | |||||||
| 22 | Lease Assistance | Las Cruces | Raices Del Saber Xinachtli Com. School | Project Description |
$48,021 | |||||||
| 22 | Lease Assistance | Albuquerque | Digital Arts And Technology Academy High School | Project Description |
$132,225 | |||||||
| 22 | Lease Assistance | Las Cruces | The New America School | Project Description |
$139,109 | |||||||
| 22 | Lease Assistance | Albuquerque | East Mountain High School | Project Description |
$286,221 | |||||||
| 22 | Lease Assistance | Los Lunas | Lunas School Of Dreams Academy | Project Description |
$357,109 | |||||||
| 22 | Lease Assistance | Albuquerque | El Camino Real Academy | Project Description |
$212,665 | |||||||
| 22 | Lease Assistance | Moriarty | Estancia Valley Classical Academy | Project Description |
$449,722 | |||||||
| 22 | Lease Assistance | Albuquerque | Explore Academy | Project Description |
$213,427 | |||||||
| 22 | Lease Assistance | Questa | Red River Valley Charter | Project Description |
$55,644 | |||||||
| 22 | Lease Assistance | Albuquerque | Explore Academy | Project Description |
$378,117 | |||||||
| 22 | Lease Assistance | Questa | Roots & Wings Community School | Project Description |
$34,949 | |||||||
| 22 | Lease Assistance | Albuquerque | Gilbert L. Sena Charter High School | Project Description |
$98,710 | |||||||
| 22 | Lease Assistance | Rio Rancho | Sandoval Academy Of Bilingual Education | Project Description |
$158,546 | |||||||
| 22 | Lease Assistance | Albuquerque | Gordon Bernell Charter School | Project Description |
$126,522 | |||||||
| 22 | Lease Assistance | Rio Rancho | The Ask Academy | Project Description |
$349,487 | |||||||
| 22 | Lease Assistance | Albuquerque | Health Leadership High School | Project Description |
$141,777 | |||||||
| 22 | Lease Assistance | Rio Rancho | The Ask Academy | Project Description |
$76,224 | |||||||
| 22 | Lease Assistance | Albuquerque | Horizon Academy West | Project Description |
$304,324 | |||||||
| 22 | Lease Assistance | Roswell | Early College High School | Project Description |
$136,791 | |||||||
| 22 | Lease Assistance | Albuquerque | La Academia De Esperanza | Project Description |
$178,000 | |||||||
| 22 | Lease Assistance | Roswell | Sidney Gutierrez Middle School | Project Description |
$30,947 | |||||||
| 22 | Lease Assistance | Albuquerque | Los Puentes Charter School | Project Description |
$99,853 | |||||||
| 22 | Lease Assistance | Roswell | Sidney Gutierrez | Project Description |
$97,503 | |||||||
| 22 | Lease Assistance | Albuquerque | Mark Armijo Academy | Project Description |
$118,349 | |||||||
| 22 | Lease Assistance | Santa Fe | Monte De Sol Charter School | Project Description |
$231,274 | |||||||
| 22 | Lease Assistance | Albuquerque | Media Arts Collaborative Charter | Project Description |
$187,811 | |||||||
| 22 | Lease Assistance | Albuquerque | Media Arts Collaborative Charter | Project Description |
$187,662 | |||||||
| 22 | Lease Assistance | Albuquerque | Mission Achievement And Success 2.0 | Project Description |
$412,828 | |||||||
| 22 | Lease Assistance | Santa Fe | The Masters Program | Project Description |
$116,973 | |||||||
| 22 | Lease Assistance | Albuquerque | Mission Achievement And Success 1.0 | Project Description |
$700,879 | |||||||
| 22 | Lease Assistance | Santa Fe | Tierra Encantada Charter High School | Project Description |
$190,388 | |||||||
| 22 | Lease Assistance | Albuquerque | Montessori Of The Rio Grande | Project Description |
$166,168 | |||||||
| 22 | Lease Assistance | Santa Fe | Turquoise Trail Charter School | Project Description |
$348,344 | |||||||
| 22 | Lease Assistance | Albuquerque | Mountain Mahogany Community School | Project Description |
$105,996 | |||||||
| 22 | Lease Assistance | Silver | Aldo Leopold Charter High School | Project Description |
$89,555 | |||||||
| 22 | Lease Assistance | Albuquerque | Native American Community Academy 1000 Indian School Socorro Cottonwood Valley Charter School | Project Description |
$121,275 | |||||||
| 22 | Lease Assistance | Albuquerque | Native American Community Academy 1100 Indian School Taos Anansi Charter School | Project Description |
$144,444 | |||||||
| 22 | Lease Assistance | Albuquerque | Native American Community Academy Cnm | Project Description |
$130,963 | |||||||
| 22 | Lease Assistance | Taos | Taos Academy Charter School | Project Description |
$172,266 | |||||||
| 22 | Lease Assistance | Albuquerque | New Mexico International School | Project Description |
$290,795 | |||||||
| 22 | Lease Assistance | Taos | Taos Integrated School Of The Arts | Project Description |
$135,298 | |||||||
| 22 | Lease Assistance | Albuquerque | North Valley Academy | Project Description |
$144,063 | |||||||
| 22 | Lease Assistance | Albuquerque | North Valley Academy | Project Description |
$126,475 | |||||||
| 22 | Lease Assistance | Albuquerque | Public Academy For Performing Arts | Project Description |
$339,578 | |||||||
| 22 | Lease Assistance | Taos | Vista Grande High School | Project Description |
$58,692 | |||||||
| 22 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter High School | Project Description |
$186,749 | |||||||
| 22 | Lease Assistance | West Las Vegas | Rio Gallinas School Elementary School/Middle School | Project Description |
$35,625 | |||||||
| 22 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter Middle School | Project Description |
$62,504 | |||||||
| 22 | Lease Assistance | Albuquerque | Siembra Leadership High School | Project Description |
$126,195 | |||||||
| 22 | Lease Assistance | Albuquerque | Solare Collegiate Charter School | Project Description |
$142,920 | |||||||
| 22 | Lease Assistance | Albuquerque | South Valley Academy | Project Description |
$473,732 | |||||||
| 22 | Lease Assistance | Albuquerque | Southwest Aeronautics, Mathematics & Science Academy | Project Description |
$173,410 | |||||||
| 22 | Lease Assistance | Albuquerque | Southwest Preparatory Learning Center | Project Description |
$124,657 | |||||||
| 22 | Lease Assistance | Albuquerque | Southwest Secondary Learning Center | Project Description |
$120,434 | |||||||
| 22 | Lease Assistance | Albuquerque | Technology Leadership High School | Project Description |
$150,673 | |||||||
| 22 | Lease Assistance | Albuquerque | The Albuquerque Sign Language Academy | Project Description |
$84,609 | |||||||
| 22 | Lease Assistance | Albuquerque | The Great Academy | Project Description |
$92,612 | |||||||
| 22 | Lease Assistance | Albuquerque | The Montessori Elementary School | Project Description |
$328,525 | |||||||
| 22 | Lease Assistance | Albuquerque | The New America School | Project Description |
$165,787 | |||||||
| 22 | Lease Assistance | Albuquerque | Tierra Adentro Of New Mexico | Project Description |
$188,654 | |||||||
| 22 | Lease Assistance | Albuquerque | 21St Century Public Academy | Project Description |
$267,165 | |||||||
| 22 | Lease Assistance | Albuquerque | Voz Collegiate Preparatory Charter School | Project Description |
$30,490 | |||||||
| 22 | Lease Assistance | Albuquerque | William W. & Josephine Dorn Charter Community | Project Description |
$27,044 | |||||||
| 21 | Lease Assistance | Albuquerque | Albuquerque Charter Academy | Project Description |
$109,034 | |||||||
| 21 | Lease Assistance | Albuquerque | Ace Leadership High School | Project Description |
$192,054 | |||||||
| 21 | Lease Assistance | Albuquerque | Aces Technical Charter School | Project Description |
$47,797 | |||||||
| 21 | Lease Assistance | Albuquerque | Albuquerque Bilingual Academy | Project Description |
$286,773 | |||||||
| 21 | Lease Assistance | Albuquerque | Albuquerque Collegiate | Project Description |
$55,299 | |||||||
| 21 | Lease Assistance | Albuquerque | Alb Institute For Math & Science | Project Description |
$282,102 | |||||||
| 21 | Lease Assistance | Albuquerque | Albuquerque School Of Excellence | Project Description |
$495,453 | |||||||
| 21 | Lease Assistance | Albuquerque | Albuquerque Talent Development Academy | Project Description |
$113,588 | |||||||
| 21 | Lease Assistance | Albuquerque | Alice King Community School | Project Description |
$354,215 | |||||||
| 21 | Lease Assistance | Albuquerque | Altura Preparatory School | Project Description |
$66,509 | |||||||
| 21 | Lease Assistance | Albuquerque | Amy Biehl High School | Project Description |
$177,712 | |||||||
| 21 | Lease Assistance | Albuquerque | Amy Biehl High School | Project Description |
$23,957 | |||||||
| 21 | Lease Assistance | Albuquerque | Cesar Chavez Community School | Project Description |
$148,337 | |||||||
| 21 | Lease Assistance | Albuquerque | Christine Duncan'S Heritage Academy | Project Description |
$303,587 | |||||||
| 21 | Lease Assistance | Albuquerque | Cien Aguas International School | Project Description |
$317,598 | |||||||
| 21 | Lease Assistance | Albuquerque | Coral Community Charter School | Project Description |
$111,683 | |||||||
| 21 | Lease Assistance | Albuquerque | Corrales International School | Project Description |
$195,043 | |||||||
| 21 | Lease Assistance | Albuquerque | Cottonwood Classical Preparatory School | Project Description |
$541,785 | |||||||
| 21 | Lease Assistance | Albuquerque | 45Digital Arts And Technology Academy High School | Project Description |
$152,091 | |||||||
| 21 | Lease Assistance | Albuquerque | East Mountain High School | Project Description |
$267,156 | |||||||
| 21 | Lease Assistance | Albuquerque | El Camino Real Academy | Project Description |
$249,595 | |||||||
| 21 | Lease Assistance | Albuquerque | Explore Academy | Project Description |
$347,490 | |||||||
| 21 | Lease Assistance | Albuquerque | Gilbert L. Sena Charter High School | Project Description |
$126,666 | |||||||
| 21 | Lease Assistance | Albuquerque | Gordon Bernell Charter School | Project Description |
$126,319 | |||||||
| 21 | Lease Assistance | Albuquerque | Health Leadership High School | Project Description |
$164,030 | |||||||
| 21 | Lease Assistance | Albuquerque | Horizon Academy West | Project Description |
$339,456 | |||||||
| 21 | Lease Assistance | Albuquerque | La Academia De Esperanza | Project Description |
$167,393 | |||||||
| 21 | Lease Assistance | Albuquerque | Los Puentes Charter School | Project Description |
$132,270 | |||||||
| 21 | Lease Assistance | Albuquerque | Mark Armijo Academy | Project Description |
$102,509 | |||||||
| 21 | Lease Assistance | Albuquerque | Media Arts Collaborative Charter Main Bldg. 4401 Central | Project Description |
$161,788 | |||||||
| 21 | Lease Assistance | Albuquerque | Mission Achievement And Success 2.0 | Project Description |
$179,350 | |||||||
| 21 | Lease Assistance | Albuquerque | Mission Achievement And Success 1.0 | Project Description |
$691,645 | |||||||
| 21 | Lease Assistance | Albuquerque | Montessori Of The Rio Grande | Project Description |
$162,162 | |||||||
| 21 | Lease Assistance | Albuquerque | Mountain Mahogany Community School | Project Description |
$105,996 | |||||||
| 21 | Lease Assistance | Albuquerque | Native American Community Academy 1000 Indian School Main Campus | Project Description |
$224,187 | |||||||
| 21 | Lease Assistance | Albuquerque | Native American Community Academy Cnm Campus 940 Univ. Blvd. Se | Project Description |
$127,787 | |||||||
| 21 | Lease Assistance | Albuquerque | New Mexico International School | Project Description |
$249,595 | |||||||
| 21 | Lease Assistance | Albuquerque | North Valley Academy 7901 4Th Street Art Space | Project Description |
$342,446 | |||||||
| 21 | Lease Assistance | Albuquerque | Public Academy For Performing Arts | Project Description |
$333,665 | |||||||
| 21 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter High School | Project Description |
$212,978 | |||||||
| 21 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter Middle School | Project Description |
$47,079 | |||||||
| 21 | Lease Assistance | Albuquerque | Siembra Leadership High School | Project Description |
$111,720 | |||||||
| 21 | Lease Assistance | Albuquerque | Solare Collegiate Charter School | Project Description |
$100,884 | |||||||
| 21 | Lease Assistance | Albuquerque | South Valley Academy | Project Description |
$459,210 | |||||||
| 21 | Lease Assistance | Albuquerque | Southwest Aeronautics, Mathematics & Science Academy | Project Description |
$189,498 | |||||||
| 21 | Lease Assistance | Albuquerque | Southwest Preparatory Learning Center | Project Description |
$143,853 | |||||||
| 21 | Lease Assistance | Albuquerque | Southwest Secondary Learning Center | Project Description |
$138,996 | |||||||
| 21 | Lease Assistance | Albuquerque | Technology Leadership High School | Project Description |
$142,951 | |||||||
| 21 | Lease Assistance | Albuquerque | The Albuquerque Sign Language Academy | Project Description |
$76,971 | |||||||
| 21 | Lease Assistance | Albuquerque | The Great Academy | Project Description |
$117,698 | |||||||
| 21 | Lease Assistance | Albuquerque | The Montessori Elementary School | Project Description |
$320,587 | |||||||
| 21 | Lease Assistance | Albuquerque | The New America School | Project Description |
$178,229 | |||||||
| 21 | Lease Assistance | Albuquerque | Tierra Adentro Of New Mexico | Project Description |
$207,747 | |||||||
| 21 | Lease Assistance | Albuquerque | 21St Century Public Academy | Project Description |
$245,858 | |||||||
| 21 | Lease Assistance | Albuquerque | William W. & Josephine Dorn Charter Community | Project Description |
$38,875 | |||||||
| 21 | Lease Assistance | Aztec | Mosaic Academy Charter School Aztec Boys & Girls Club | Project Description |
$6,000 | |||||||
| 21 | Lease Assistance | Aztec | Mosaic Academy Charter School | Project Description |
$62,434 | |||||||
| 21 | Lease Assistance | Carlsbad | Jefferson Montessori Academy | Project Description |
$182,712 | |||||||
| 21 | Lease Assistance | Cimarron | Moreno Valley High School | Project Description |
$45,323 | |||||||
| 21 | Lease Assistance | Española | La Tierra Montessori School Of The Arts And Sciences | Project Description |
$46,332 | |||||||
| 21 | Lease Assistance | Española | Mccurdy Charter School | Project Description |
$359,181 | |||||||
| 21 | Lease Assistance | Gallup | Dzil Ditl'Ooi School Of Empowerment, Action And Perseverance Charter | Project Description |
$29,518 | |||||||
| 21 | Lease Assistance | Gallup | Hozho Academy | Project Description |
$130,100 | |||||||
| 21 | Lease Assistance | Gallup | Hozho Academy | Project Description |
$42,222 | |||||||
| 21 | Lease Assistance | Gallup | Middle College High School | Project Description |
$26,969 | |||||||
| 21 | Lease Assistance | Gallup | Six Directions Indigenous School | Project Description |
$54,179 | |||||||
| 21 | Lease Assistance | Jemez Valley | Valley San Diego Riverside Charter School | Project Description |
$38,188 | |||||||
| 21 | Lease Assistance | Jemez Valley | Valley Walatowa High Charter School | Project Description |
$41,475 | |||||||
| 21 | Lease Assistance | Las Cruces | Alma D'Arte Charter High School | Project Description |
$95,279 | |||||||
| 21 | Lease Assistance | Las Cruces | J. Paul Taylor Academy | Project Description |
$149,458 | |||||||
| 21 | Lease Assistance | Las Cruces | La Academia Dolores Huerta | Project Description |
$60,530 | |||||||
| 21 | Lease Assistance | Las Cruces | Las Montanas Charter High School | Project Description |
$130,402 | |||||||
| 21 | Lease Assistance | Las Cruces | Raices Del Saber Xinachtli Com. School | Project Description |
$22,792 | |||||||
| 21 | Lease Assistance | Las Cruces | The New America School | Project Description |
$148,337 | |||||||
| 21 | Lease Assistance | Moriarty | Estancia Valley Classical Academy | Project Description |
$440,527 | |||||||
| 21 | Lease Assistance | Questa | Red River Valley Charter | Project Description |
$62,399 | |||||||
| 21 | Lease Assistance | Questa | Roots & Wings Community School | Project Description |
$34,949 | |||||||
| 21 | Lease Assistance | Rio Rancho | Sandoval Academy Of Bilingual Education | Project Description |
$136,380 | |||||||
| 21 | Lease Assistance | Rio Rancho | The Ask Academy | Project Description |
$327,313 | |||||||
| 21 | Lease Assistance | Rio Rancho | The Ask Academy 4500 Sundt Rd | Project Description |
$74,729 | |||||||
| 21 | Lease Assistance | Roswell | Early College High School | Project Description |
$111,191 | |||||||
| 21 | Lease Assistance | Roswell | Sidney Gutierrez Middle School | Project Description |
$30,198 | |||||||
| 21 | Lease Assistance | Roswell | Sidney Gutierrez | Project Description |
$97,148 | |||||||
| 21 | Lease Assistance | Santa Fe | Monte De Sol Charter School | Project Description |
$231,260 | |||||||
| 21 | Lease Assistance | Santa Fe | New Mexico School For The Arts | Project Description |
$172,560 | |||||||
| 21 | Lease Assistance | Santa Fe | The Academy For Technology & The Classics | Project Description |
$204,008 | |||||||
| 21 | Lease Assistance | Santa Fe | The Masters Program | Project Description |
$116,846 | |||||||
| 21 | Lease Assistance | Santa Fe | Tierra Encantada Charter High School | Project Description |
$190,200 | |||||||
| 21 | Lease Assistance | Santa Fe | Turquoise Trail Charter School | Project Description |
$309,004 | |||||||
| 21 | Lease Assistance | Silver | Aldo Leopold Charter High School | Project Description |
$89,639 | |||||||
| 21 | Lease Assistance | Socorro | Cottonwood Valley Charter School | Project Description |
$127,039 | |||||||
| 21 | Lease Assistance | Taos | Anansi Charter School | Project Description |
$146,469 | |||||||
| 21 | Lease Assistance | Taos | Taos Academy Charter School | Project Description |
$175,613 | |||||||
| 21 | Lease Assistance | Taos | Taos Integrated School Of The Arts | Project Description |
$128,908 | |||||||
| 21 | Lease Assistance | Taos | Taos International Charter School | Project Description |
$118,445 | |||||||
| 21 | Lease Assistance | Taos | Taos Charter School | Project Description |
$126,360 | |||||||
| 21 | Lease Assistance | Taos | Vista Grande High School | Project Description |
$65,014 | |||||||
| 21 | Lease Assistance | West Las Vegas | Rio Gallinas School Elementary School/Middle School | Project Description |
$35,645 | |||||||
| 20 | Lease Assistance | Albuquerque | Albuquerque Charter Academy | Project Description |
$133,817 | |||||||
| 20 | Lease Assistance | Albuquerque | Ace Leadership High School | Project Description |
$213,725 | |||||||
| 20 | Lease Assistance | Albuquerque | Albuquerque Collegiate | Project Description |
$26,155 | |||||||
| 20 | Lease Assistance | Albuquerque | Alb Institute For Math & Science | Project Description |
$262,672 | |||||||
| 20 | Lease Assistance | Albuquerque | Albuquerque School Of Excellence | Project Description |
$464,814 | |||||||
| 20 | Lease Assistance | Albuquerque | Albuquerque Talent Development Secondary | Project Description |
$121,061 | |||||||
| 20 | Lease Assistance | Albuquerque | Alice King Community School | Project Description |
$348,611 | |||||||
| 20 | Lease Assistance | Albuquerque | Altura Preparatory School | Project Description |
$42,969 | |||||||
| 20 | Lease Assistance | Albuquerque | Amy Biehl High School | Project Description |
$180,773 | |||||||
| 20 | Lease Assistance | Albuquerque | Cesar Chavez Community School | Project Description |
$151,700 | |||||||
| 20 | Lease Assistance | Albuquerque | Christine Duncan'S Heritage Academy | Project Description |
$291,256 | |||||||
| 20 | Lease Assistance | Albuquerque | Cien Aguas International School | Project Description |
$317,598 | |||||||
| 20 | Lease Assistance | Albuquerque | Coral Community Charter School | Project Description |
$129,847 | |||||||
| 20 | Lease Assistance | Albuquerque | Corrales International School | Project Description |
$182,339 | |||||||
| 20 | Lease Assistance | Albuquerque | Cottonwood Classical Preparatory School | Project Description |
$536,181 | |||||||
| 20 | Lease Assistance | Albuquerque | Digital Arts And Technology Academy High School | Project Description |
$180,853 | |||||||
| 20 | Lease Assistance | Albuquerque | East Mountain High School | Project Description |
$266,783 | |||||||
| 20 | Lease Assistance | Albuquerque | El Camino Real Academy | Project Description |
$235,396 | |||||||
| 20 | Lease Assistance | Albuquerque | Explore Academy | Project Description |
$297,421 | |||||||
| 20 | Lease Assistance | Albuquerque | Gilbert L. Sena Charter High School | Project Description |
$130,776 | |||||||
| 20 | Lease Assistance | Albuquerque | Gordon Bernell Charter School 2821 4Th Street | Project Description |
$138,947 | |||||||
| 20 | Lease Assistance | Albuquerque | Health Leadership High School | Project Description |
$170,008 | |||||||
| 20 | Lease Assistance | Albuquerque | Horizon Academy West | Project Description |
$340,017 | |||||||
| 20 | Lease Assistance | Albuquerque | La Academia De Esperanza | Project Description |
$232,781 | |||||||
| 20 | Lease Assistance | Albuquerque | La Promesa Early Learning Center Charter School | Project Description |
$256,694 | |||||||
| 20 | Lease Assistance | Albuquerque | Los Puentes Charter School | Project Description |
$112,094 | |||||||
| 20 | Lease Assistance | Albuquerque | Mark Armijo Academy | Project Description |
$87,381 | |||||||
| 20 | Lease Assistance | Albuquerque | Media Arts Collaborative Charter | Project Description |
$186,449 | |||||||
| 20 | Lease Assistance | Albuquerque | Mission Achievement And Success 1255 Old Coors Rd | Project Description |
$76,224 | |||||||
| 20 | Lease Assistance | Albuquerque | Mission Achievement And Success 1718 Yale | Project Description |
$697,320 | |||||||
| 20 | Lease Assistance | Albuquerque | Montessori Of The Rio Grande | Project Description |
$161,041 | |||||||
| 20 | Lease Assistance | Albuquerque | Mountain Mahogany Community School | Project Description |
$138,249 | |||||||
| 20 | Lease Assistance | Albuquerque | Native American Community Academy | Project Description |
$209,241 | |||||||
| 20 | Lease Assistance | Albuquerque | Native American Community Academy Cnm Campus | Project Description |
$100,350 | |||||||
| 20 | Lease Assistance | Albuquerque | New Mexico International School | Project Description |
$200,647 | |||||||
| 20 | Lease Assistance | Albuquerque | North Valley Academy | Project Description |
$351,600 | |||||||
| 20 | Lease Assistance | Albuquerque | Public Academy For Performing Arts | Project Description |
$317,972 | |||||||
| 20 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter High School 4300 Blake Rd. Sw | Project Description |
$204,010 | |||||||
| 20 | Lease Assistance | Albuquerque | Robert F. Kennedy Charter Middle School 1021 Isleta Rd. Sw | Project Description |
$51,563 | |||||||
| 20 | Lease Assistance | Albuquerque | Siembra Leadership High School | Project Description |
$89,301 | |||||||
| 20 | Lease Assistance | Albuquerque | Solare Collegiate Charter School | Project Description |
$116,577 | |||||||
| 20 | Lease Assistance | Albuquerque | South Valley Academy | Project Description |
$458,089 | |||||||
| 20 | Lease Assistance | Albuquerque | Southwest Aeronautics, Mathematics & Science Acad | Project Description |
$206,626 | |||||||
| 20 | Lease Assistance | Albuquerque | Southwest Preparatory Learning Center | Project Description |
$138,249 | |||||||
| 20 | Lease Assistance | Albuquerque | Southwest Secondary Learning Center | Project Description |
$173,745 | |||||||
| 20 | Lease Assistance | Albuquerque | Technology Leadership High School | Project Description |
$148,300 | |||||||
| 20 | Lease Assistance | Albuquerque | The Albuquerque Sign Language Academy | Project Description |
$72,113 | |||||||
| 20 | Lease Assistance | Albuquerque | The Great Academy | Project Description |
$97,947 | |||||||
| 20 | Lease Assistance | Albuquerque | The Montessori Elementary School | Project Description |
$322,082 | |||||||
| 20 | Lease Assistance | Albuquerque | The New America School | Project Description |
$208,868 | |||||||
| 20 | Lease Assistance | Albuquerque | Tierra Adentro | Project Description |
$215,593 | |||||||
| 20 | Lease Assistance | Albuquerque | 21St Century Public Academy | Project Description |
$220,077 | |||||||
| 20 | Lease Assistance | Albuquerque | William W. & Josephine Dorn Charter Community | Project Description |
$38,955 | |||||||
| 20 | Lease Assistance | Aztec | Mosaic Academy Charter School | Project Description |
$78,898 | |||||||
| 20 | Lease Assistance | Carlsbad | Jefferson Montessori Academy | Project Description |
$174,866 | |||||||
| 20 | Lease Assistance | Cimarron | Moreno Valley High School | Project Description |
$45,328 | |||||||
| 20 | Lease Assistance | Deming | Deming Cesar Chavez Charter High School | Project Description |
$117,698 | |||||||
| 20 | Lease Assistance | Española | La Tierra Montessori School Of The Arts And Sciences | Project Description |
$54,926 | |||||||
| 20 | Lease Assistance | Española | Mccurdy Charter School | Project Description |
$359,066 | |||||||
| 20 | Lease Assistance | Gallup | Dzil Ditl'Ooi School Of Empowerment, Action And Perseverance Charter | Project Description |
$29,144 | |||||||
| 20 | Lease Assistance | Gallup | Hozho Academy | Project Description |
$102,379 | |||||||
| 20 | Lease Assistance | Gallup | Middle College High School | Project Description |
$27,786 | |||||||
| 20 | Lease Assistance | Gallup | Six Directions Indigenous School | Project Description |
$50,068 | |||||||
| 20 | Lease Assistance | Jemez Valley | V San Diego Riverside Charter School | Project Description |
$45,482 | |||||||
| 20 | Lease Assistance | Jemez Valley | V Walatowa High Charter School | Project Description |
$33,628 | |||||||
| 20 | Lease Assistance | Las Cruces | Alma D'Arte Charter High School | Project Description |
$108,731 | |||||||
| 20 | Lease Assistance | Las Cruces | J. Paul Taylor Academy | Project Description |
$149,458 | |||||||
| 20 | Lease Assistance | Las Cruces | La Academia Dolores Huerta | Project Description |
$89,675 | |||||||
| 20 | Lease Assistance | Las Cruces | Las Montanas Charter High School | Project Description |
$122,929 | |||||||
| 20 | Lease Assistance | Las Cruces | Raices Del Saber Xinachtli Com. School | Project Description |
$44,284 | |||||||
| 20 | Lease Assistance | Las Cruces | The New America School | Project Description |
$152,074 | |||||||
| 20 | Lease Assistance | Moriarty | Estancia Valley Classical Academy | Project Description |
$413,625 | |||||||
| 20 | Lease Assistance | Questa | Red River Valley Charter | Project Description |
$59,970 | |||||||
| 20 | Lease Assistance | Questa | Roots & Wings Community School | Project Description |
$34,949 | |||||||
| 20 | Lease Assistance | Rio Rancho | Sandoval Academy Of Bilingual Education | Project Description |
$102,379 | |||||||
| 20 | Lease Assistance | Rio Rancho | The Ask Academy | Project Description |
$317,225 | |||||||
| 20 | Lease Assistance | Rio Rancho | The Ask Academy 4500 Sundt Rd | Project Description |
$71,366 | |||||||
| 20 | Lease Assistance | Roswell | Sidney Gutierrez Middle School | Project Description |
$49,321 | |||||||
| 20 | Lease Assistance | Santa Fe | Monte De Sol Charter School | Project Description |
$231,094 | |||||||
| 20 | Lease Assistance | Santa Fe | New Mexico School For The Arts | Project Description |
$159,173 | |||||||
| 20 | Lease Assistance | Santa Fe | The Academy For Technology & The Classics | Project Description |
$266,205 | |||||||
| 20 | Lease Assistance | Santa Fe | The Masters Program | Project Description |
$115,463 | |||||||
| 20 | Lease Assistance | Santa Fe | Tierra Encantada Charter High School | Project Description |
$189,957 | |||||||
| 20 | Lease Assistance | Santa Fe | Turquoise Trail Charter School | Project Description |
$349,732 | |||||||
| 20 | Lease Assistance | Santa Fe | Turquoise Trail Charter School | Project Description |
$20,447 | |||||||
| 20 | Lease Assistance | Silver | Aldo Leopold Charter High School | Project Description |
$52,410 | |||||||
| 20 | Lease Assistance | Silver | Aldo Leopold Charter School Middle School | Project Description |
$45,624 | |||||||
| 20 | Lease Assistance | Socorro | Cottonwood Valley Charter School | Project Description |
$127,039 | |||||||
| 20 | Lease Assistance | Taos | Anansi Charter School | Project Description |
$144,601 | |||||||
| 20 | Lease Assistance | Taos | Taos Academy Charter School | Project Description |
$162,162 | |||||||
| 20 | Lease Assistance | Taos | Taos Integrated School Of The Arts | Project Description |
$125,918 | |||||||
| 20 | Lease Assistance | Taos | Taos International Charter School | Project Description |
$100,137 | |||||||
| 20 | Lease Assistance | Taos | Taos Municipal Charter School | Project Description |
$126,398 | |||||||
| 20 | Lease Assistance | Taos | Vista Grande High School | Project Description |
$69,872 | |||||||
| 20 | Lease Assistance | West Las Vegas | Rio Gallinas School Elementary School/Middle School | Project Description |
$35,633 | |||||||
| 20 | Lease Assistance | Gallup | Chief Manulito Elementary School | Project Description |
$8,271 | |||||||
| 20 | Lease Assistance | Gallup | David Skeet Elementary School | Project Description |
$4,740 | |||||||
| 20 | Lease Assistance | Gallup | Ramah High School | Project Description |
$4,463 | |||||||
| 20 | Lease Assistance | Los Lunas | School Of Dreams Academy | Project Description |
$79,692 | |||||||
| 20 | Lease Assistance | Aztec | Mosaic Academy Charter School | Project Description |
$20,400 | |||||||
| 20 | Lease Assistance | Albuquerque | The International School At Mesa Del Sol | Project Description |
$84,972 | |||||||
| 20 | Lease Assistance | Albuquerque | South Valley Preparatory School | Project Description |
$13,680 |